blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3572367

EP3572367 - FIRE RESISTANT COATED STEEL BELT [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  17.06.2022
Database last updated on 20.09.2024
FormerThe patent has been granted
Status updated on  09.07.2021
FormerGrant of patent is intended
Status updated on  28.02.2021
FormerRequest for examination was made
Status updated on  01.02.2021
FormerGrant of patent is intended
Status updated on  03.11.2020
FormerRequest for examination was made
Status updated on  08.05.2020
FormerThe application has been published
Status updated on  25.10.2019
Most recent event   Tooltip03.05.2024Lapse of the patent in a contracting state
New state(s): MK
published on 05.06.2024  [2024/23]
Applicant(s)For all designated states
Otis Elevator Company
One Carrier Place
Farmington, Connecticut 06032 / US
[2019/48]
Inventor(s)01 / PAPAS, Paul
411 Silver Lane
East Hartford, CT Connecticut 06108 / US
02 / CAREY, Michael
411 Silver Lane
East Hartford, CT Connecticut 06108 / US
03 / MOSHER, Daniel
411 Silver Lane
East Hartford, CT Connecticut 06108 / US
 [2019/48]
Representative(s)Dehns
St. Bride's House
10 Salisbury Square
London EC4Y 8JD / GB
[2019/48]
Application number, filing date19171175.306.05.2016
[2019/48]
Priority number, dateUS201562158059P07.05.2015         Original published format: US 201562158059 P
[2019/48]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3572367
Date:27.11.2019
Language:EN
[2019/48]
Type: B1 Patent specification 
No.:EP3572367
Date:11.08.2021
Language:EN
[2021/32]
Search report(s)(Supplementary) European search report - dispatched on:EP25.10.2019
ClassificationIPC:B66B7/06, D07B1/22, D07B1/16, D07B7/14
[2019/48]
CPC:
B66B7/062 (EP,CN,US); B66B11/08 (CN); D07B1/16 (EP,US);
D07B1/162 (EP,US); D07B7/145 (EP,US); D07B1/22 (EP,US);
D07B2201/2087 (EP,US); D07B2201/2092 (EP,US); D07B2401/2035 (EP,US);
D07B2501/2007 (EP,US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/24]
Former [2019/48]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:FEUERBESTÄNDIGES BESCHICHTETES STAHLBAND[2019/48]
English:FIRE RESISTANT COATED STEEL BELT[2019/48]
French:BANDE D'ACIER À REVÊTEMENT RÉSISTANT AU FEU[2019/48]
Examination procedure01.05.2020Amendment by applicant (claims and/or description)
01.05.2020Examination requested  [2020/24]
01.05.2020Date on which the examining division has become responsible
04.11.2020Communication of intention to grant the patent
29.01.2021Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO
01.03.2021Communication of intention to grant the patent
05.07.2021Fee for grant paid
05.07.2021Fee for publishing/printing paid
05.07.2021Receipt of the translation of the claim(s)
Parent application(s)   TooltipEP16168584.7  / EP3093261
Divisional application(s)EP21172856.3  / EP3904266
Opposition(s)12.05.2022No opposition filed within time limit [2022/29]
Fees paidRenewal fee
25.04.2019Renewal fee patent year 03
25.04.2019Renewal fee patent year 04
17.03.2020Renewal fee patent year 05
19.05.2021Renewal fee patent year 06
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU06.05.2016
AL11.08.2021
AT11.08.2021
CY11.08.2021
CZ11.08.2021
DK11.08.2021
EE11.08.2021
ES11.08.2021
FI11.08.2021
HR11.08.2021
IT11.08.2021
LT11.08.2021
LV11.08.2021
MC11.08.2021
MK11.08.2021
NL11.08.2021
PL11.08.2021
RO11.08.2021
RS11.08.2021
SE11.08.2021
SI11.08.2021
SK11.08.2021
SM11.08.2021
BG11.11.2021
NO11.11.2021
GR12.11.2021
IS11.12.2021
PT13.12.2021
GB06.05.2022
IE06.05.2022
LU06.05.2022
[2024/23]
Former [2024/20]HU06.05.2016
AL11.08.2021
AT11.08.2021
CY11.08.2021
CZ11.08.2021
DK11.08.2021
EE11.08.2021
ES11.08.2021
FI11.08.2021
HR11.08.2021
IT11.08.2021
LT11.08.2021
LV11.08.2021
MC11.08.2021
NL11.08.2021
PL11.08.2021
RO11.08.2021
RS11.08.2021
SE11.08.2021
SI11.08.2021
SK11.08.2021
SM11.08.2021
BG11.11.2021
NO11.11.2021
GR12.11.2021
IS11.12.2021
PT13.12.2021
GB06.05.2022
IE06.05.2022
LU06.05.2022
Former [2024/18]HU06.05.2016
AL11.08.2021
AT11.08.2021
CZ11.08.2021
DK11.08.2021
EE11.08.2021
ES11.08.2021
FI11.08.2021
HR11.08.2021
IT11.08.2021
LT11.08.2021
LV11.08.2021
MC11.08.2021
NL11.08.2021
PL11.08.2021
RO11.08.2021
RS11.08.2021
SE11.08.2021
SI11.08.2021
SK11.08.2021
SM11.08.2021
BG11.11.2021
NO11.11.2021
GR12.11.2021
IS11.12.2021
PT13.12.2021
GB06.05.2022
IE06.05.2022
LU06.05.2022
Former [2023/27]AL11.08.2021
AT11.08.2021
CZ11.08.2021
DK11.08.2021
EE11.08.2021
ES11.08.2021
FI11.08.2021
HR11.08.2021
IT11.08.2021
LT11.08.2021
LV11.08.2021
MC11.08.2021
NL11.08.2021
PL11.08.2021
RO11.08.2021
RS11.08.2021
SE11.08.2021
SI11.08.2021
SK11.08.2021
SM11.08.2021
BG11.11.2021
NO11.11.2021
GR12.11.2021
IS11.12.2021
PT13.12.2021
GB06.05.2022
IE06.05.2022
LU06.05.2022
Former [2023/20]AL11.08.2021
AT11.08.2021
CZ11.08.2021
DK11.08.2021
EE11.08.2021
ES11.08.2021
FI11.08.2021
HR11.08.2021
IT11.08.2021
LT11.08.2021
LV11.08.2021
MC11.08.2021
NL11.08.2021
PL11.08.2021
RO11.08.2021
RS11.08.2021
SE11.08.2021
SI11.08.2021
SK11.08.2021
SM11.08.2021
BG11.11.2021
NO11.11.2021
GR12.11.2021
IS11.12.2021
PT13.12.2021
IE06.05.2022
LU06.05.2022
Former [2023/08]AL11.08.2021
AT11.08.2021
CZ11.08.2021
DK11.08.2021
EE11.08.2021
ES11.08.2021
FI11.08.2021
HR11.08.2021
IT11.08.2021
LT11.08.2021
LV11.08.2021
MC11.08.2021
NL11.08.2021
PL11.08.2021
RO11.08.2021
RS11.08.2021
SE11.08.2021
SI11.08.2021
SK11.08.2021
SM11.08.2021
BG11.11.2021
NO11.11.2021
GR12.11.2021
IS11.12.2021
PT13.12.2021
LU06.05.2022
Former [2023/06]AL11.08.2021
AT11.08.2021
CZ11.08.2021
DK11.08.2021
EE11.08.2021
ES11.08.2021
FI11.08.2021
HR11.08.2021
IT11.08.2021
LT11.08.2021
LV11.08.2021
MC11.08.2021
NL11.08.2021
PL11.08.2021
RO11.08.2021
RS11.08.2021
SE11.08.2021
SI11.08.2021
SK11.08.2021
SM11.08.2021
BG11.11.2021
NO11.11.2021
GR12.11.2021
IS11.12.2021
PT13.12.2021
Former [2022/36]AL11.08.2021
AT11.08.2021
CZ11.08.2021
DK11.08.2021
EE11.08.2021
ES11.08.2021
FI11.08.2021
HR11.08.2021
IT11.08.2021
LT11.08.2021
LV11.08.2021
NL11.08.2021
PL11.08.2021
RO11.08.2021
RS11.08.2021
SE11.08.2021
SI11.08.2021
SK11.08.2021
SM11.08.2021
BG11.11.2021
NO11.11.2021
GR12.11.2021
IS11.12.2021
PT13.12.2021
Former [2022/29]AL11.08.2021
AT11.08.2021
CZ11.08.2021
DK11.08.2021
EE11.08.2021
ES11.08.2021
FI11.08.2021
HR11.08.2021
LT11.08.2021
LV11.08.2021
NL11.08.2021
PL11.08.2021
RO11.08.2021
RS11.08.2021
SE11.08.2021
SK11.08.2021
SM11.08.2021
BG11.11.2021
NO11.11.2021
GR12.11.2021
IS11.12.2021
PT13.12.2021
Former [2022/25]AT11.08.2021
CZ11.08.2021
DK11.08.2021
EE11.08.2021
ES11.08.2021
FI11.08.2021
HR11.08.2021
LT11.08.2021
LV11.08.2021
NL11.08.2021
PL11.08.2021
RO11.08.2021
RS11.08.2021
SE11.08.2021
SK11.08.2021
SM11.08.2021
BG11.11.2021
NO11.11.2021
GR12.11.2021
IS11.12.2021
PT13.12.2021
Former [2022/24]AT11.08.2021
CZ11.08.2021
DK11.08.2021
EE11.08.2021
ES11.08.2021
FI11.08.2021
HR11.08.2021
LT11.08.2021
LV11.08.2021
NL11.08.2021
PL11.08.2021
RO11.08.2021
RS11.08.2021
SE11.08.2021
SK11.08.2021
BG11.11.2021
NO11.11.2021
GR12.11.2021
IS11.12.2021
PT13.12.2021
Former [2022/21]AT11.08.2021
DK11.08.2021
ES11.08.2021
FI11.08.2021
HR11.08.2021
LT11.08.2021
LV11.08.2021
NL11.08.2021
PL11.08.2021
RS11.08.2021
SE11.08.2021
BG11.11.2021
NO11.11.2021
GR12.11.2021
IS11.12.2021
PT13.12.2021
Former [2022/16]AT11.08.2021
ES11.08.2021
FI11.08.2021
HR11.08.2021
LT11.08.2021
LV11.08.2021
NL11.08.2021
PL11.08.2021
RS11.08.2021
SE11.08.2021
BG11.11.2021
NO11.11.2021
GR12.11.2021
IS11.12.2021
PT13.12.2021
Former [2022/10]AT11.08.2021
ES11.08.2021
FI11.08.2021
HR11.08.2021
LT11.08.2021
LV11.08.2021
PL11.08.2021
RS11.08.2021
SE11.08.2021
BG11.11.2021
NO11.11.2021
GR12.11.2021
IS11.12.2021
PT13.12.2021
Former [2022/09]AT11.08.2021
ES11.08.2021
FI11.08.2021
LT11.08.2021
RS11.08.2021
SE11.08.2021
BG11.11.2021
NO11.11.2021
PT13.12.2021
Former [2022/08]AT11.08.2021
ES11.08.2021
FI11.08.2021
LT11.08.2021
SE11.08.2021
BG11.11.2021
NO11.11.2021
Former [2022/07]AT11.08.2021
LT11.08.2021
NO11.11.2021
Documents cited:Search[IA]WO9816681  (OTIS ELEVATOR CO [US]) [I] 1-3,5-7,11,12,14 * abstract * * page 6, line 10 - page 8, line 15 * * figure 4 *[A] 4,8-10,13,15;
 [XA]CN101085655  (QINGDAO RUBBER SIX GROUP CO LT [CN]) [X] 1-3,5,11,14 * abstract * * figure 1 * [A] 4,6-10,12,13,15;
 [XA]DE102012110769  (CONTITECH ANTRIEBSSYSTEME GMBH [DE]) [X] 1,5,11,14 * abstract * * paragraph [0037] * * figure 3 * [A] 2-4,6-10,12,13,15
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.