| EP3584071 - MULTI-COMPONENT FILMS [Right-click to bookmark this link] | Status | The application has been withdrawn Status updated on 01.09.2023 Database last updated on 28.03.2026 | |
| Former | Examination is in progress Status updated on 10.09.2021 | ||
| Former | Request for examination was made Status updated on 22.11.2019 | Most recent event Tooltip | 01.09.2023 | Withdrawal of application | published on 04.10.2023 [2023/40] | Applicant(s) | For all designated states The Boeing Company 929 Long Bridge Drive Arlington, VA 22202 / US | [2023/12] |
| Former [2019/52] | For all designated states The Boeing Company 100 North Riverside Plaza Chicago, IL 60606-2016 / US | Inventor(s) | 01 /
KOZAR, Michael P c/o The Boeing Company 100 North Riverside Plaza Chicago, IL Illinois 60606-2016 / US | 02 /
WILENSKI, Mark S c/o The Boeing Company 100 North Riverside Plaza Chicago, IL Illinois 60606-2016 / US | [2019/52] | Representative(s) | Boult Wade Tennant LLP Salisbury Square House 8 Salisbury Square London EC4Y 8AP / GB | [N/P] |
| Former [2019/52] | Boult Wade Tennant LLP Salisbury Square House 8 Salisbury Square London EC4Y 8AP / GB | Application number, filing date | 19171531.7 | 29.04.2019 | [2019/52] | Priority number, date | US201816011546 | 18.06.2018 Original published format: US201816011546 | [2019/52] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | EP3584071 | Date: | 25.12.2019 | Language: | EN | [2019/52] | Type: | A3 Search report | No.: | EP3584071 | Date: | 18.03.2020 | Language: | EN | [2020/12] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 19.02.2020 | Classification | IPC: | B32B3/08, B32B3/14, B32B3/18, B32B3/30, B32B5/12, B32B5/14, B32B27/08, B32B27/06, B32B27/28, B32B27/30, B32B27/32, B32B27/34, B32B27/36, B32B27/38, B32B27/40, B32B27/42, B32B7/04, B32B5/26, B32B3/10 | [2019/52] | CPC: |
B32B5/14 (EP,US);
B29C48/08 (EP,US);
B29C48/21 (EP,US);
B29C55/02 (KR);
B32B17/00 (EP);
B32B27/06 (EP,CN);
B32B27/08 (EP,CN);
B32B27/28 (EP);
B32B27/281 (EP);
B32B27/285 (EP);
B32B27/288 (EP);
B32B27/308 (EP);
B32B27/32 (EP);
B32B27/322 (EP);
B32B27/34 (EP);
B32B27/36 (EP);
B32B27/365 (EP,CN);
B32B27/38 (EP);
B32B27/40 (EP);
B32B27/42 (EP);
B32B3/08 (EP);
B32B3/085 (EP);
B32B3/10 (EP);
B32B3/14 (EP);
B32B3/18 (EP,US);
B32B3/26 (EP);
B32B3/263 (EP);
B32B3/266 (EP);
B32B3/28 (EP,US);
B32B3/30 (EP,US);
B32B33/00 (CN);
B32B37/02 (CN);
B32B38/0008 (CN);
B32B5/12 (EP);
B32B5/142 (EP);
B32B5/147 (EP);
B32B5/26 (EP);
B32B7/02 (US);
B32B7/022 (EP,CN,KR,US);
B32B7/03 (EP);
B32B7/035 (EP,CN,KR,US);
B32B7/04 (EP);
B32B7/12 (EP,CN,KR,US);
B32B2250/24 (EP);
B32B2260/021 (EP);
B32B2260/023 (EP);
B32B2260/046 (EP);
B32B2262/0207 (EP);
B32B2262/0223 (EP);
B32B2262/0246 (EP);
B32B2262/0253 (EP);
B32B2262/0261 (EP);
B32B2262/0276 (EP);
B32B2262/0292 (EP);
B32B2262/101 (EP);
B32B2307/41 (EP);
B32B2307/412 (EP,CN,US);
B32B2307/418 (EP);
B32B2307/50 (EP,CN);
B32B2307/51 (EP);
B32B2307/514 (EP);
B32B2307/516 (US);
B32B2307/54 (EP);
B32B2307/542 (EP);
B32B2307/552 (EP);
B32B2307/558 (EP,US);
B32B2307/56 (EP,US);
B32B2307/732 (EP);
B32B2419/00 (EP);
B32B2571/02 (EP);
B32B2605/006 (EP);
B32B2605/18 (EP,US);
B32B2607/00 (EP);
Y10T156/10 (EP,US);
Y10T29/49 (EP,US);
Y10T29/49826 (EP,US);
Y10T428/24479 (EP,US);
Y10T428/24694 (EP,US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/52] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | MEHRKOMPONENTENFOLIEN | [2019/52] | English: | MULTI-COMPONENT FILMS | [2019/52] | French: | FILMS À COMPOSANTS MULTIPLES | [2019/52] | Examination procedure | 29.04.2019 | Examination requested [2019/52] | 04.09.2020 | Amendment by applicant (claims and/or description) | 09.09.2021 | Despatch of a communication from the examining division (Time limit: M04) | 06.01.2022 | Reply to a communication from the examining division | 24.08.2023 | Application withdrawn by applicant [2023/40] | 19.03.2024 | Date of oral proceedings | Fees paid | Renewal fee | 27.04.2021 | Renewal fee patent year 03 | 27.04.2022 | Renewal fee patent year 04 | 27.04.2023 | Renewal fee patent year 05 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Documents cited: | Search | [Y] US5665450 (DAY DELBERT E et al.) [Y] 10 * paragraphs 3, 61, 62, 122, 124, 183, 189, 190, 198 * | [XY] KEN K. TEDJOJUWONO ET AL: "Optical characterization of window materials for aerospace applications", PROCEEDINGS OF SPIE, vol. 8884, 6 September 2013 (2013-09-06), pages 88841I, XP055641121, ISSN: 0277-786X, DOI: 10.1117/12.2029469 [Y] 10 DOI: http://dx.doi.org/10.1117/12.2029469 |