| EP3567683 - CONTACT CONNECTION STRUCTURE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 06.05.2022 Database last updated on 19.03.2026 | |
| Former | The patent has been granted Status updated on 28.05.2021 | ||
| Former | Grant of patent is intended Status updated on 11.04.2021 | ||
| Former | Examination is in progress Status updated on 23.06.2020 | ||
| Former | Request for examination was made Status updated on 11.10.2019 | Most recent event Tooltip | 27.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 30.10.2024 [2024/44] | Applicant(s) | For all designated states Yazaki Corporation 4-28, Mita 1-chome Minato-ku Tokyo 108-8333 / JP | [2019/46] | Inventor(s) | 01 /
YUDATE, Takahiro c/o Yazaki Parts Co., Ltd. 206-1, Nunohikihara Makinohara-shi, Shizuoka 421-0407 / JP | [2019/46] | Representative(s) | Grünecker Patent- und Rechtsanwälte PartG mbB Leopoldstraße 4 80802 München / DE | [2019/46] | Application number, filing date | 19172716.3 | 06.05.2019 | [2019/46] | Priority number, date | JP20180091954 | 11.05.2018 Original published format: JP 2018091954 | [2019/46] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3567683 | Date: | 13.11.2019 | Language: | EN | [2019/46] | Type: | B1 Patent specification | No.: | EP3567683 | Date: | 30.06.2021 | Language: | EN | [2021/26] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 25.09.2019 | Classification | IPC: | H01R13/03, H01R13/11, H01R13/04, // H01R43/16 | [2019/46] | CPC: |
H01R13/03 (EP,CN,US);
H01R13/4223 (US);
H01R13/04 (EP);
H01R13/05 (US);
H01R13/11 (EP,US);
H01R13/193 (CN);
H01R43/16 (EP)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/13] |
| Former [2019/46] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | KONTAKTVERBINDUNGSSTRUKTUR | [2019/46] | English: | CONTACT CONNECTION STRUCTURE | [2019/46] | French: | STRUCTURE DE CONNEXION DE CONTACT | [2019/46] | Examination procedure | 06.05.2019 | Examination requested [2019/46] | 13.02.2020 | Amendment by applicant (claims and/or description) | 26.06.2020 | Despatch of a communication from the examining division (Time limit: M04) | 10.09.2020 | Reply to a communication from the examining division | 12.04.2021 | Communication of intention to grant the patent | 04.05.2021 | Fee for grant paid | 04.05.2021 | Fee for publishing/printing paid | 04.05.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 31.03.2022 | No opposition filed within time limit [2022/23] | Fees paid | Renewal fee | 21.05.2021 | Renewal fee patent year 03 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 06.05.2019 | AL | 30.06.2021 | AT | 30.06.2021 | CY | 30.06.2021 | CZ | 30.06.2021 | DK | 30.06.2021 | EE | 30.06.2021 | ES | 30.06.2021 | FI | 30.06.2021 | HR | 30.06.2021 | IT | 30.06.2021 | LT | 30.06.2021 | LV | 30.06.2021 | MC | 30.06.2021 | MK | 30.06.2021 | MT | 30.06.2021 | NL | 30.06.2021 | PL | 30.06.2021 | RO | 30.06.2021 | RS | 30.06.2021 | SE | 30.06.2021 | SI | 30.06.2021 | SK | 30.06.2021 | SM | 30.06.2021 | TR | 30.06.2021 | BG | 30.09.2021 | NO | 30.09.2021 | GR | 01.10.2021 | IS | 30.10.2021 | PT | 02.11.2021 | [2024/44] |
| Former [2024/29] | HU | 06.05.2019 | |
| AL | 30.06.2021 | ||
| AT | 30.06.2021 | ||
| CY | 30.06.2021 | ||
| CZ | 30.06.2021 | ||
| DK | 30.06.2021 | ||
| EE | 30.06.2021 | ||
| ES | 30.06.2021 | ||
| FI | 30.06.2021 | ||
| HR | 30.06.2021 | ||
| IT | 30.06.2021 | ||
| LT | 30.06.2021 | ||
| LV | 30.06.2021 | ||
| MC | 30.06.2021 | ||
| MK | 30.06.2021 | ||
| NL | 30.06.2021 | ||
| PL | 30.06.2021 | ||
| RO | 30.06.2021 | ||
| RS | 30.06.2021 | ||
| SE | 30.06.2021 | ||
| SI | 30.06.2021 | ||
| SK | 30.06.2021 | ||
| SM | 30.06.2021 | ||
| TR | 30.06.2021 | ||
| BG | 30.09.2021 | ||
| NO | 30.09.2021 | ||
| GR | 01.10.2021 | ||
| IS | 30.10.2021 | ||
| PT | 02.11.2021 | ||
| Former [2024/23] | HU | 06.05.2019 | |
| AL | 30.06.2021 | ||
| AT | 30.06.2021 | ||
| CY | 30.06.2021 | ||
| CZ | 30.06.2021 | ||
| DK | 30.06.2021 | ||
| EE | 30.06.2021 | ||
| ES | 30.06.2021 | ||
| FI | 30.06.2021 | ||
| HR | 30.06.2021 | ||
| IT | 30.06.2021 | ||
| LT | 30.06.2021 | ||
| LV | 30.06.2021 | ||
| MC | 30.06.2021 | ||
| MK | 30.06.2021 | ||
| NL | 30.06.2021 | ||
| PL | 30.06.2021 | ||
| RO | 30.06.2021 | ||
| RS | 30.06.2021 | ||
| SE | 30.06.2021 | ||
| SI | 30.06.2021 | ||
| SK | 30.06.2021 | ||
| SM | 30.06.2021 | ||
| BG | 30.09.2021 | ||
| NO | 30.09.2021 | ||
| GR | 01.10.2021 | ||
| IS | 30.10.2021 | ||
| PT | 02.11.2021 | ||
| Former [2024/20] | HU | 06.05.2019 | |
| AL | 30.06.2021 | ||
| AT | 30.06.2021 | ||
| CY | 30.06.2021 | ||
| CZ | 30.06.2021 | ||
| DK | 30.06.2021 | ||
| EE | 30.06.2021 | ||
| ES | 30.06.2021 | ||
| FI | 30.06.2021 | ||
| HR | 30.06.2021 | ||
| IT | 30.06.2021 | ||
| LT | 30.06.2021 | ||
| LV | 30.06.2021 | ||
| MC | 30.06.2021 | ||
| NL | 30.06.2021 | ||
| PL | 30.06.2021 | ||
| RO | 30.06.2021 | ||
| RS | 30.06.2021 | ||
| SE | 30.06.2021 | ||
| SI | 30.06.2021 | ||
| SK | 30.06.2021 | ||
| SM | 30.06.2021 | ||
| BG | 30.09.2021 | ||
| NO | 30.09.2021 | ||
| GR | 01.10.2021 | ||
| IS | 30.10.2021 | ||
| PT | 02.11.2021 | ||
| Former [2024/18] | HU | 06.05.2019 | |
| AL | 30.06.2021 | ||
| AT | 30.06.2021 | ||
| CZ | 30.06.2021 | ||
| DK | 30.06.2021 | ||
| EE | 30.06.2021 | ||
| ES | 30.06.2021 | ||
| FI | 30.06.2021 | ||
| HR | 30.06.2021 | ||
| IT | 30.06.2021 | ||
| LT | 30.06.2021 | ||
| LV | 30.06.2021 | ||
| MC | 30.06.2021 | ||
| NL | 30.06.2021 | ||
| PL | 30.06.2021 | ||
| RO | 30.06.2021 | ||
| RS | 30.06.2021 | ||
| SE | 30.06.2021 | ||
| SI | 30.06.2021 | ||
| SK | 30.06.2021 | ||
| SM | 30.06.2021 | ||
| BG | 30.09.2021 | ||
| NO | 30.09.2021 | ||
| GR | 01.10.2021 | ||
| IS | 30.10.2021 | ||
| PT | 02.11.2021 | ||
| Former [2023/19] | AL | 30.06.2021 | |
| AT | 30.06.2021 | ||
| CZ | 30.06.2021 | ||
| DK | 30.06.2021 | ||
| EE | 30.06.2021 | ||
| ES | 30.06.2021 | ||
| FI | 30.06.2021 | ||
| HR | 30.06.2021 | ||
| IT | 30.06.2021 | ||
| LT | 30.06.2021 | ||
| LV | 30.06.2021 | ||
| MC | 30.06.2021 | ||
| NL | 30.06.2021 | ||
| PL | 30.06.2021 | ||
| RO | 30.06.2021 | ||
| RS | 30.06.2021 | ||
| SE | 30.06.2021 | ||
| SI | 30.06.2021 | ||
| SK | 30.06.2021 | ||
| SM | 30.06.2021 | ||
| BG | 30.09.2021 | ||
| NO | 30.09.2021 | ||
| GR | 01.10.2021 | ||
| IS | 30.10.2021 | ||
| PT | 02.11.2021 | ||
| Former [2023/06] | AL | 30.06.2021 | |
| AT | 30.06.2021 | ||
| CZ | 30.06.2021 | ||
| DK | 30.06.2021 | ||
| EE | 30.06.2021 | ||
| ES | 30.06.2021 | ||
| FI | 30.06.2021 | ||
| HR | 30.06.2021 | ||
| IT | 30.06.2021 | ||
| LV | 30.06.2021 | ||
| MC | 30.06.2021 | ||
| NL | 30.06.2021 | ||
| PL | 30.06.2021 | ||
| RO | 30.06.2021 | ||
| RS | 30.06.2021 | ||
| SE | 30.06.2021 | ||
| SI | 30.06.2021 | ||
| SK | 30.06.2021 | ||
| SM | 30.06.2021 | ||
| BG | 30.09.2021 | ||
| NO | 30.09.2021 | ||
| GR | 01.10.2021 | ||
| IS | 30.10.2021 | ||
| PT | 02.11.2021 | ||
| Former [2022/36] | AL | 30.06.2021 | |
| AT | 30.06.2021 | ||
| CZ | 30.06.2021 | ||
| DK | 30.06.2021 | ||
| EE | 30.06.2021 | ||
| ES | 30.06.2021 | ||
| FI | 30.06.2021 | ||
| HR | 30.06.2021 | ||
| IT | 30.06.2021 | ||
| LV | 30.06.2021 | ||
| NL | 30.06.2021 | ||
| PL | 30.06.2021 | ||
| RO | 30.06.2021 | ||
| RS | 30.06.2021 | ||
| SE | 30.06.2021 | ||
| SI | 30.06.2021 | ||
| SK | 30.06.2021 | ||
| SM | 30.06.2021 | ||
| BG | 30.09.2021 | ||
| NO | 30.09.2021 | ||
| GR | 01.10.2021 | ||
| IS | 30.10.2021 | ||
| PT | 02.11.2021 | ||
| Former [2022/29] | AL | 30.06.2021 | |
| AT | 30.06.2021 | ||
| CZ | 30.06.2021 | ||
| DK | 30.06.2021 | ||
| EE | 30.06.2021 | ||
| ES | 30.06.2021 | ||
| FI | 30.06.2021 | ||
| HR | 30.06.2021 | ||
| LV | 30.06.2021 | ||
| NL | 30.06.2021 | ||
| PL | 30.06.2021 | ||
| RO | 30.06.2021 | ||
| RS | 30.06.2021 | ||
| SE | 30.06.2021 | ||
| SI | 30.06.2021 | ||
| SK | 30.06.2021 | ||
| SM | 30.06.2021 | ||
| BG | 30.09.2021 | ||
| NO | 30.09.2021 | ||
| GR | 01.10.2021 | ||
| IS | 30.10.2021 | ||
| PT | 02.11.2021 | ||
| Former [2022/26] | AL | 30.06.2021 | |
| AT | 30.06.2021 | ||
| CZ | 30.06.2021 | ||
| DK | 30.06.2021 | ||
| EE | 30.06.2021 | ||
| ES | 30.06.2021 | ||
| FI | 30.06.2021 | ||
| HR | 30.06.2021 | ||
| LV | 30.06.2021 | ||
| NL | 30.06.2021 | ||
| PL | 30.06.2021 | ||
| RO | 30.06.2021 | ||
| RS | 30.06.2021 | ||
| SE | 30.06.2021 | ||
| SK | 30.06.2021 | ||
| SM | 30.06.2021 | ||
| BG | 30.09.2021 | ||
| NO | 30.09.2021 | ||
| GR | 01.10.2021 | ||
| IS | 30.10.2021 | ||
| PT | 02.11.2021 | ||
| Former [2022/21] | AT | 30.06.2021 | |
| CZ | 30.06.2021 | ||
| DK | 30.06.2021 | ||
| EE | 30.06.2021 | ||
| ES | 30.06.2021 | ||
| FI | 30.06.2021 | ||
| HR | 30.06.2021 | ||
| LV | 30.06.2021 | ||
| NL | 30.06.2021 | ||
| PL | 30.06.2021 | ||
| RO | 30.06.2021 | ||
| RS | 30.06.2021 | ||
| SE | 30.06.2021 | ||
| SK | 30.06.2021 | ||
| SM | 30.06.2021 | ||
| BG | 30.09.2021 | ||
| NO | 30.09.2021 | ||
| GR | 01.10.2021 | ||
| IS | 30.10.2021 | ||
| PT | 02.11.2021 | ||
| Former [2022/11] | AT | 30.06.2021 | |
| CZ | 30.06.2021 | ||
| EE | 30.06.2021 | ||
| ES | 30.06.2021 | ||
| FI | 30.06.2021 | ||
| HR | 30.06.2021 | ||
| LV | 30.06.2021 | ||
| NL | 30.06.2021 | ||
| PL | 30.06.2021 | ||
| RO | 30.06.2021 | ||
| RS | 30.06.2021 | ||
| SE | 30.06.2021 | ||
| SK | 30.06.2021 | ||
| SM | 30.06.2021 | ||
| BG | 30.09.2021 | ||
| NO | 30.09.2021 | ||
| GR | 01.10.2021 | ||
| IS | 30.10.2021 | ||
| PT | 02.11.2021 | ||
| Former [2022/09] | AT | 30.06.2021 | |
| CZ | 30.06.2021 | ||
| ES | 30.06.2021 | ||
| FI | 30.06.2021 | ||
| HR | 30.06.2021 | ||
| LV | 30.06.2021 | ||
| NL | 30.06.2021 | ||
| RO | 30.06.2021 | ||
| RS | 30.06.2021 | ||
| SE | 30.06.2021 | ||
| SK | 30.06.2021 | ||
| SM | 30.06.2021 | ||
| BG | 30.09.2021 | ||
| NO | 30.09.2021 | ||
| GR | 01.10.2021 | ||
| PT | 02.11.2021 | ||
| Former [2022/08] | AT | 30.06.2021 | |
| CZ | 30.06.2021 | ||
| ES | 30.06.2021 | ||
| FI | 30.06.2021 | ||
| HR | 30.06.2021 | ||
| LV | 30.06.2021 | ||
| NL | 30.06.2021 | ||
| RS | 30.06.2021 | ||
| SE | 30.06.2021 | ||
| SM | 30.06.2021 | ||
| BG | 30.09.2021 | ||
| NO | 30.09.2021 | ||
| GR | 01.10.2021 | ||
| Former [2022/07] | AT | 30.06.2021 | |
| FI | 30.06.2021 | ||
| HR | 30.06.2021 | ||
| LV | 30.06.2021 | ||
| NL | 30.06.2021 | ||
| RS | 30.06.2021 | ||
| SE | 30.06.2021 | ||
| SM | 30.06.2021 | ||
| BG | 30.09.2021 | ||
| NO | 30.09.2021 | ||
| GR | 01.10.2021 | ||
| Former [2021/51] | FI | 30.06.2021 | |
| HR | 30.06.2021 | ||
| LV | 30.06.2021 | ||
| RS | 30.06.2021 | ||
| SE | 30.06.2021 | ||
| BG | 30.09.2021 | ||
| NO | 30.09.2021 | ||
| GR | 01.10.2021 | ||
| Former [2021/49] | FI | 30.06.2021 | |
| HR | 30.06.2021 | ||
| LV | 30.06.2021 | ||
| SE | 30.06.2021 | ||
| BG | 30.09.2021 | ||
| NO | 30.09.2021 | ||
| GR | 01.10.2021 | ||
| Former [2021/47] | FI | 30.06.2021 | |
| BG | 30.09.2021 | ||
| Former [2021/46] | FI | 30.06.2021 | Documents cited: | Search | [XI] JP2011124141 (AUTONETWORKS TECHNOLOGIES LTD et al.) | [X] US2016276768 (SUNAGA TAKAHIRO et al.) | [XI] US2015236439 (OKUBO MASAYUKI et al.) [X] 1,2 * figures 1-8 * * abstract *[I] 3 | [X] JP2015041441 (AUTO NETWORK GIJUTSU KENKYUSHO et al.) [X] 1 * figures 1-8B * * paragraphs [0001] - [0101] * | [X] EP2590268 (SUMITOMO WIRING SYSTEMS et al.) [X] 1 * figures 1-4 * * paragraphs [0001] - [0068] * | [X] JP2016201291 (YAZAKI CORP et al.) [X] 1 * figures 1-3 * | [A] US2004229077 (MORI AKIHITO et al.) [A] 3 * figure 1 * * paragraphs [0039] - [0082] * | by applicant | JP2017162598 | JP2007280825 |