EP3567406 - AFTERGLOW DETECTION DEVICE AND AFTERGLOW DETECTION METHOD [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 25.02.2022 Database last updated on 06.07.2024 | |
Former | The patent has been granted Status updated on 19.03.2021 | ||
Former | Grant of patent is intended Status updated on 18.11.2020 | ||
Former | Request for examination was made Status updated on 15.05.2020 | ||
Former | The application has been published Status updated on 11.10.2019 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states Nuctech Company Limited 2nd Floor, Block A TongFang Building Shuangqinglu Haidian District Beijing 100084 / CN | [2019/46] | Inventor(s) | 01 /
LI, Shuwei 2nd Floor, Block A Tongfang Building Shuangqinglu Haidian District Beijing, Beijing 100084 / CN | 02 /
ZHANG, Wenjian 2nd Floor, Block A Tongfang Building Shuangqinglu Haidian District Beijing, Beijing 100084 / CN | 03 /
ZOU, Xiang 2nd Floor, Block A Tongfang Building Shuangqinglu Haidian District Beijing, Beijing 100084 / CN | 04 /
ZHAO, Bozhen 2nd Floor, Block A Tongfang Building Shuangqinglu Haidian District Beijing, Beijing 100084 / CN | 05 /
ZHANG, Qingjun 2nd Floor, Block A Tongfang Building Shuangqinglu Haidian District Beijing, Beijing 100084 / CN | 06 /
HE, Huishao 2nd Floor, Block A Tongfang Building Shuangqinglu Haidian District Beijing, Beijing 100084 / CN | 07 /
WANG, Yongqiang 2nd Floor, Block A Tongfang Building Shuangqinglu Haidian District Beijing, Beijing 100084 / CN | 08 /
WANG, Yanchun 2nd Floor, Block A Tongfang Building Shuangqinglu Haidian District Beijing, Beijing 100084 / CN | [2019/46] | Representative(s) | Held, Stephan Meissner Bolte Patentanwälte Rechtsanwälte Partnerschaft mbB Widenmayerstraße 47 80538 München / DE | [2019/46] | Application number, filing date | 19173337.7 | 08.05.2019 | [2019/46] | Priority number, date | CN201810437201 | 09.05.2018 Original published format: CN201810437201 | [2019/46] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3567406 | Date: | 13.11.2019 | Language: | EN | [2019/46] | Type: | B1 Patent specification | No.: | EP3567406 | Date: | 21.04.2021 | Language: | EN | [2021/16] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 25.09.2019 | Classification | IPC: | G01T1/208 | [2019/46] | CPC: |
G01T1/208 (EP);
G01T7/00 (CN);
G01N23/04 (US);
A61B6/4258 (US);
G01T1/20 (US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/25] |
Former [2019/46] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | NACHLEUCHTERKENNUNGSVORRICHTUNG UND NACHLEUCHTERKENNUNGSVERFAHREN | [2019/46] | English: | AFTERGLOW DETECTION DEVICE AND AFTERGLOW DETECTION METHOD | [2019/46] | French: | DISPOSITIF ET PROCÉDÉ DE DÉTECTION DE LUMINESCENCE RÉSIDUELLE | [2019/46] | Examination procedure | 13.05.2020 | Amendment by applicant (claims and/or description) | 13.05.2020 | Examination requested [2020/25] | 13.05.2020 | Date on which the examining division has become responsible | 19.11.2020 | Communication of intention to grant the patent | 12.03.2021 | Fee for grant paid | 12.03.2021 | Fee for publishing/printing paid | 12.03.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 24.01.2022 | No opposition filed within time limit [2022/13] |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 08.05.2019 | AL | 21.04.2021 | AT | 21.04.2021 | CY | 21.04.2021 | CZ | 21.04.2021 | DK | 21.04.2021 | EE | 21.04.2021 | ES | 21.04.2021 | FI | 21.04.2021 | HR | 21.04.2021 | IT | 21.04.2021 | LT | 21.04.2021 | LV | 21.04.2021 | MC | 21.04.2021 | MK | 21.04.2021 | NL | 21.04.2021 | PL | 21.04.2021 | RO | 21.04.2021 | RS | 21.04.2021 | SE | 21.04.2021 | SI | 21.04.2021 | SK | 21.04.2021 | SM | 21.04.2021 | TR | 21.04.2021 | IE | 08.05.2021 | LU | 08.05.2021 | BE | 31.05.2021 | FR | 21.06.2021 | BG | 21.07.2021 | NO | 21.07.2021 | GR | 22.07.2021 | IS | 21.08.2021 | PT | 23.08.2021 | DE | 01.12.2021 | [2024/29] |
Former [2024/23] | HU | 08.05.2019 | |
AL | 21.04.2021 | ||
AT | 21.04.2021 | ||
CY | 21.04.2021 | ||
CZ | 21.04.2021 | ||
DK | 21.04.2021 | ||
EE | 21.04.2021 | ||
ES | 21.04.2021 | ||
FI | 21.04.2021 | ||
HR | 21.04.2021 | ||
IT | 21.04.2021 | ||
LT | 21.04.2021 | ||
LV | 21.04.2021 | ||
MC | 21.04.2021 | ||
MK | 21.04.2021 | ||
NL | 21.04.2021 | ||
PL | 21.04.2021 | ||
RO | 21.04.2021 | ||
RS | 21.04.2021 | ||
SE | 21.04.2021 | ||
SI | 21.04.2021 | ||
SK | 21.04.2021 | ||
SM | 21.04.2021 | ||
IE | 08.05.2021 | ||
LU | 08.05.2021 | ||
BE | 31.05.2021 | ||
FR | 21.06.2021 | ||
BG | 21.07.2021 | ||
NO | 21.07.2021 | ||
GR | 22.07.2021 | ||
IS | 21.08.2021 | ||
PT | 23.08.2021 | ||
DE | 01.12.2021 | ||
Former [2023/33] | HU | 08.05.2019 | |
AL | 21.04.2021 | ||
AT | 21.04.2021 | ||
CY | 21.04.2021 | ||
CZ | 21.04.2021 | ||
DK | 21.04.2021 | ||
EE | 21.04.2021 | ||
ES | 21.04.2021 | ||
FI | 21.04.2021 | ||
HR | 21.04.2021 | ||
IT | 21.04.2021 | ||
LT | 21.04.2021 | ||
LV | 21.04.2021 | ||
MC | 21.04.2021 | ||
NL | 21.04.2021 | ||
PL | 21.04.2021 | ||
RO | 21.04.2021 | ||
RS | 21.04.2021 | ||
SE | 21.04.2021 | ||
SI | 21.04.2021 | ||
SK | 21.04.2021 | ||
SM | 21.04.2021 | ||
IE | 08.05.2021 | ||
LU | 08.05.2021 | ||
BE | 31.05.2021 | ||
FR | 21.06.2021 | ||
BG | 21.07.2021 | ||
NO | 21.07.2021 | ||
GR | 22.07.2021 | ||
IS | 21.08.2021 | ||
PT | 23.08.2021 | ||
DE | 01.12.2021 | ||
Former [2023/30] | AL | 21.04.2021 | |
AT | 21.04.2021 | ||
CY | 21.04.2021 | ||
CZ | 21.04.2021 | ||
DK | 21.04.2021 | ||
EE | 21.04.2021 | ||
ES | 21.04.2021 | ||
FI | 21.04.2021 | ||
HR | 21.04.2021 | ||
IT | 21.04.2021 | ||
LT | 21.04.2021 | ||
LV | 21.04.2021 | ||
MC | 21.04.2021 | ||
NL | 21.04.2021 | ||
PL | 21.04.2021 | ||
RO | 21.04.2021 | ||
RS | 21.04.2021 | ||
SE | 21.04.2021 | ||
SI | 21.04.2021 | ||
SK | 21.04.2021 | ||
SM | 21.04.2021 | ||
IE | 08.05.2021 | ||
LU | 08.05.2021 | ||
BE | 31.05.2021 | ||
FR | 21.06.2021 | ||
BG | 21.07.2021 | ||
NO | 21.07.2021 | ||
GR | 22.07.2021 | ||
IS | 21.08.2021 | ||
PT | 23.08.2021 | ||
DE | 01.12.2021 | ||
Former [2022/36] | AL | 21.04.2021 | |
AT | 21.04.2021 | ||
CZ | 21.04.2021 | ||
DK | 21.04.2021 | ||
EE | 21.04.2021 | ||
ES | 21.04.2021 | ||
FI | 21.04.2021 | ||
HR | 21.04.2021 | ||
IT | 21.04.2021 | ||
LT | 21.04.2021 | ||
LV | 21.04.2021 | ||
MC | 21.04.2021 | ||
NL | 21.04.2021 | ||
PL | 21.04.2021 | ||
RO | 21.04.2021 | ||
RS | 21.04.2021 | ||
SE | 21.04.2021 | ||
SI | 21.04.2021 | ||
SK | 21.04.2021 | ||
SM | 21.04.2021 | ||
IE | 08.05.2021 | ||
LU | 08.05.2021 | ||
BE | 31.05.2021 | ||
FR | 21.06.2021 | ||
BG | 21.07.2021 | ||
NO | 21.07.2021 | ||
GR | 22.07.2021 | ||
IS | 21.08.2021 | ||
PT | 23.08.2021 | ||
DE | 01.12.2021 | ||
Former [2022/34] | AL | 21.04.2021 | |
AT | 21.04.2021 | ||
CZ | 21.04.2021 | ||
DK | 21.04.2021 | ||
EE | 21.04.2021 | ||
ES | 21.04.2021 | ||
FI | 21.04.2021 | ||
HR | 21.04.2021 | ||
LT | 21.04.2021 | ||
LV | 21.04.2021 | ||
MC | 21.04.2021 | ||
NL | 21.04.2021 | ||
PL | 21.04.2021 | ||
RO | 21.04.2021 | ||
RS | 21.04.2021 | ||
SE | 21.04.2021 | ||
SI | 21.04.2021 | ||
SK | 21.04.2021 | ||
SM | 21.04.2021 | ||
IE | 08.05.2021 | ||
LU | 08.05.2021 | ||
BE | 31.05.2021 | ||
FR | 21.06.2021 | ||
BG | 21.07.2021 | ||
NO | 21.07.2021 | ||
GR | 22.07.2021 | ||
IS | 21.08.2021 | ||
PT | 23.08.2021 | ||
DE | 01.12.2021 | ||
Former [2022/29] | AL | 21.04.2021 | |
AT | 21.04.2021 | ||
CZ | 21.04.2021 | ||
DK | 21.04.2021 | ||
EE | 21.04.2021 | ||
ES | 21.04.2021 | ||
FI | 21.04.2021 | ||
HR | 21.04.2021 | ||
LT | 21.04.2021 | ||
LV | 21.04.2021 | ||
MC | 21.04.2021 | ||
NL | 21.04.2021 | ||
PL | 21.04.2021 | ||
RO | 21.04.2021 | ||
RS | 21.04.2021 | ||
SE | 21.04.2021 | ||
SI | 21.04.2021 | ||
SK | 21.04.2021 | ||
SM | 21.04.2021 | ||
IE | 08.05.2021 | ||
LU | 08.05.2021 | ||
FR | 21.06.2021 | ||
BG | 21.07.2021 | ||
NO | 21.07.2021 | ||
GR | 22.07.2021 | ||
IS | 21.08.2021 | ||
PT | 23.08.2021 | ||
DE | 01.12.2021 | ||
Former [2022/26] | AL | 21.04.2021 | |
AT | 21.04.2021 | ||
CZ | 21.04.2021 | ||
DK | 21.04.2021 | ||
EE | 21.04.2021 | ||
ES | 21.04.2021 | ||
FI | 21.04.2021 | ||
HR | 21.04.2021 | ||
LT | 21.04.2021 | ||
LV | 21.04.2021 | ||
MC | 21.04.2021 | ||
NL | 21.04.2021 | ||
PL | 21.04.2021 | ||
RO | 21.04.2021 | ||
RS | 21.04.2021 | ||
SE | 21.04.2021 | ||
SK | 21.04.2021 | ||
SM | 21.04.2021 | ||
IE | 08.05.2021 | ||
LU | 08.05.2021 | ||
FR | 21.06.2021 | ||
BG | 21.07.2021 | ||
NO | 21.07.2021 | ||
GR | 22.07.2021 | ||
IS | 21.08.2021 | ||
PT | 23.08.2021 | ||
DE | 01.12.2021 | ||
Former [2022/23] | AT | 21.04.2021 | |
CZ | 21.04.2021 | ||
DK | 21.04.2021 | ||
EE | 21.04.2021 | ||
ES | 21.04.2021 | ||
FI | 21.04.2021 | ||
HR | 21.04.2021 | ||
LT | 21.04.2021 | ||
LV | 21.04.2021 | ||
MC | 21.04.2021 | ||
NL | 21.04.2021 | ||
PL | 21.04.2021 | ||
RO | 21.04.2021 | ||
RS | 21.04.2021 | ||
SE | 21.04.2021 | ||
SK | 21.04.2021 | ||
SM | 21.04.2021 | ||
IE | 08.05.2021 | ||
LU | 08.05.2021 | ||
FR | 21.06.2021 | ||
BG | 21.07.2021 | ||
NO | 21.07.2021 | ||
GR | 22.07.2021 | ||
IS | 21.08.2021 | ||
PT | 23.08.2021 | ||
DE | 01.12.2021 | ||
Former [2022/21] | AT | 21.04.2021 | |
CZ | 21.04.2021 | ||
DK | 21.04.2021 | ||
EE | 21.04.2021 | ||
ES | 21.04.2021 | ||
FI | 21.04.2021 | ||
HR | 21.04.2021 | ||
LT | 21.04.2021 | ||
LV | 21.04.2021 | ||
MC | 21.04.2021 | ||
NL | 21.04.2021 | ||
PL | 21.04.2021 | ||
RO | 21.04.2021 | ||
RS | 21.04.2021 | ||
SE | 21.04.2021 | ||
SK | 21.04.2021 | ||
SM | 21.04.2021 | ||
IE | 08.05.2021 | ||
LU | 08.05.2021 | ||
BG | 21.07.2021 | ||
NO | 21.07.2021 | ||
GR | 22.07.2021 | ||
PT | 23.08.2021 | ||
DE | 01.12.2021 | ||
IS | 22.12.2021 | ||
Former [2022/10] | AT | 21.04.2021 | |
CZ | 21.04.2021 | ||
DK | 21.04.2021 | ||
EE | 21.04.2021 | ||
ES | 21.04.2021 | ||
FI | 21.04.2021 | ||
HR | 21.04.2021 | ||
LT | 21.04.2021 | ||
LV | 21.04.2021 | ||
MC | 21.04.2021 | ||
NL | 21.04.2021 | ||
PL | 21.04.2021 | ||
RO | 21.04.2021 | ||
RS | 21.04.2021 | ||
SE | 21.04.2021 | ||
SK | 21.04.2021 | ||
SM | 21.04.2021 | ||
LU | 08.05.2021 | ||
BG | 21.07.2021 | ||
NO | 21.07.2021 | ||
GR | 22.07.2021 | ||
PT | 23.08.2021 | ||
IS | 22.12.2021 | ||
Former [2022/09] | AT | 21.04.2021 | |
CZ | 21.04.2021 | ||
DK | 21.04.2021 | ||
ES | 21.04.2021 | ||
FI | 21.04.2021 | ||
HR | 21.04.2021 | ||
LT | 21.04.2021 | ||
LV | 21.04.2021 | ||
MC | 21.04.2021 | ||
NL | 21.04.2021 | ||
PL | 21.04.2021 | ||
RO | 21.04.2021 | ||
RS | 21.04.2021 | ||
SE | 21.04.2021 | ||
SK | 21.04.2021 | ||
SM | 21.04.2021 | ||
LU | 08.05.2021 | ||
BG | 21.07.2021 | ||
NO | 21.07.2021 | ||
GR | 22.07.2021 | ||
IS | 21.08.2021 | ||
PT | 23.08.2021 | ||
Former [2022/08] | AT | 21.04.2021 | |
CZ | 21.04.2021 | ||
DK | 21.04.2021 | ||
ES | 21.04.2021 | ||
FI | 21.04.2021 | ||
HR | 21.04.2021 | ||
LT | 21.04.2021 | ||
LV | 21.04.2021 | ||
MC | 21.04.2021 | ||
NL | 21.04.2021 | ||
PL | 21.04.2021 | ||
RS | 21.04.2021 | ||
SE | 21.04.2021 | ||
SM | 21.04.2021 | ||
LU | 08.05.2021 | ||
BG | 21.07.2021 | ||
NO | 21.07.2021 | ||
GR | 22.07.2021 | ||
IS | 21.08.2021 | ||
PT | 23.08.2021 | ||
Former [2022/07] | AT | 21.04.2021 | |
FI | 21.04.2021 | ||
HR | 21.04.2021 | ||
LT | 21.04.2021 | ||
LV | 21.04.2021 | ||
MC | 21.04.2021 | ||
NL | 21.04.2021 | ||
PL | 21.04.2021 | ||
RS | 21.04.2021 | ||
SE | 21.04.2021 | ||
SM | 21.04.2021 | ||
BG | 21.07.2021 | ||
NO | 21.07.2021 | ||
GR | 22.07.2021 | ||
IS | 21.08.2021 | ||
PT | 23.08.2021 | ||
Former [2021/52] | AT | 21.04.2021 | |
FI | 21.04.2021 | ||
HR | 21.04.2021 | ||
LT | 21.04.2021 | ||
LV | 21.04.2021 | ||
NL | 21.04.2021 | ||
PL | 21.04.2021 | ||
RS | 21.04.2021 | ||
SE | 21.04.2021 | ||
BG | 21.07.2021 | ||
NO | 21.07.2021 | ||
GR | 22.07.2021 | ||
IS | 21.08.2021 | ||
PT | 23.08.2021 | ||
Former [2021/51] | AT | 21.04.2021 | |
FI | 21.04.2021 | ||
HR | 21.04.2021 | ||
LT | 21.04.2021 | ||
LV | 21.04.2021 | ||
NL | 21.04.2021 | ||
RS | 21.04.2021 | ||
SE | 21.04.2021 | ||
BG | 21.07.2021 | ||
NO | 21.07.2021 | ||
GR | 22.07.2021 | ||
IS | 21.08.2021 | ||
PT | 23.08.2021 | ||
Former [2021/50] | AT | 21.04.2021 | |
FI | 21.04.2021 | ||
HR | 21.04.2021 | ||
LT | 21.04.2021 | ||
LV | 21.04.2021 | ||
NL | 21.04.2021 | ||
SE | 21.04.2021 | ||
BG | 21.07.2021 | ||
NO | 21.07.2021 | ||
GR | 22.07.2021 | ||
PT | 23.08.2021 | ||
Former [2021/49] | AT | 21.04.2021 | |
FI | 21.04.2021 | ||
HR | 21.04.2021 | ||
LT | 21.04.2021 | ||
LV | 21.04.2021 | ||
NL | 21.04.2021 | ||
SE | 21.04.2021 | ||
BG | 21.07.2021 | ||
NO | 21.07.2021 | ||
GR | 22.07.2021 | ||
Former [2021/46] | AT | 21.04.2021 | |
FI | 21.04.2021 | ||
LT | 21.04.2021 | ||
NL | 21.04.2021 | ||
BG | 21.07.2021 | Documents cited: | Search | [XI]WO9923670 (ANALOGIC CORP [US]) [X] 1,2,4,6,7 * figures 1, 11 * * page 10, lines 13-20 * * page 12, lines 25-26 * * page 17, lines 21-25 * * page 18, lines 21-30 * [I] 5,8; | [I]JP2003010159 (HITACHI MEDICAL CORP) [I] 1,2,4-8 * paragraph [0012]; figure 1 *; | [I]WO2010109353 (KONINKL PHILIPS ELECTRONICS NV [NL], et al) [I] 1,2,4-8 * figure 3 * * page 4, lines 18-20 * * page 5, line 28 - page 6, line 6 *; | [I]JP2018002974 (HITACHI METALS LTD) [I] 1,2,4-8* paragraphs [0020] - [0021] * |