EP3550625 - METHOD FOR PRODUCING A FIRST ELECTRODE/ACTIVE LAYER/SECOND ELECTRODE TYPE STACK [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 27.05.2022 Database last updated on 04.11.2024 | |
Former | The patent has been granted Status updated on 18.06.2021 | ||
Former | Grant of patent is intended Status updated on 16.03.2021 | ||
Former | Request for examination was made Status updated on 21.02.2020 | ||
Former | The application has been published Status updated on 06.09.2019 | Most recent event Tooltip | 27.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 30.10.2024 [2024/44] | Applicant(s) | For all designated states Commissariat à l'Energie Atomique et aux Energies Alternatives Bâtiment "Le Ponant D" 25, Rue Leblanc 75015 Paris / FR | For all designated states ISORG 7 Parvis Louis Néel Bâtiment de Haute Technologie 38000 Grenoble / FR | For all designated states Trixell Z.I. Centr'alp 38430 Moirans / FR | [N/P] |
Former [2019/41] | For all designated states Commissariat à l'Energie Atomique et aux Energies Alternatives Bâtiment "Le Ponant D" 25, rue Leblanc 75015 Paris / FR | ||
For all designated states ISORG 7 Parvis Louis Néel Bâtiment de Haute Technologie 38000 Grenoble / FR | |||
For all designated states Trixell Z.I. Centr'alp 38430 Moirans / FR | Inventor(s) | 01 /
VERILHAC, Jean-Marie 120 Impasse des Gentianes 38500 COUBLEVIE / FR | 02 /
CHARLOT, Simon 4, rue Roger Guigue 38100 GRENOBLE / FR | [2019/41] | Representative(s) | Atout PI Laplace Immeuble Up On 25 Boulevard Romain Rolland CS 40072 75685 Paris Cedex 14 / FR | [N/P] |
Former [2021/29] | Marks & Clerk France Immeuble "Visium" 22, avenue Aristide Briand 94117 Arcueil Cedex / FR | ||
Former [2019/41] | Collet, Alain, et al Marks & Clerk France Conseils en Propriété Industrielle Immeuble Visium 22, Avenue Aristide Briand 94117 Arcueil Cedex / FR | Application number, filing date | 19175695.6 | 16.06.2016 | [2019/41] | Priority number, date | FR20150055480 | 16.06.2015 Original published format: FR 1555480 | [2019/41] | Filing language | FR | Procedural language | FR | Publication | Type: | A1 Application with search report | No.: | EP3550625 | Date: | 09.10.2019 | Language: | FR | [2019/41] | Type: | B1 Patent specification | No.: | EP3550625 | Date: | 21.07.2021 | Language: | FR | [2021/29] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 11.09.2019 | Classification | IPC: | H01L51/44, H01L51/52, H01L51/56 | [2019/41] | CPC: |
H10K30/81 (EP,KR,US);
H10K30/82 (EP,US);
H01L31/022425 (US);
H01L31/022466 (US);
H10K50/11 (EP,KR,US);
H10K50/81 (US);
H10K50/828 (US);
H10K71/00 (EP,KR,US);
H10K71/10 (EP,KR);
H10K71/861 (EP,KR,US);
H01L2031/0344 (KR);
H10K2102/341 (EP,KR,US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/13] |
Former [2019/41] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | VERFAHREN ZUR HERSTELLUNG EINER STAPELANORDNUNG VOM TYP ERSTE ELEKTRODE / AKTIVE SCHICHT / ZWEITE ELEKTRODE | [2019/41] | English: | METHOD FOR PRODUCING A FIRST ELECTRODE/ACTIVE LAYER/SECOND ELECTRODE TYPE STACK | [2019/41] | French: | PROCÉDÉ DE RÉALISATION D'UN EMPILEMENT DU TYPE PREMIÈRE ÉLECTRODE/ COUCHE ACTIVE/ DEUXIÈME ÉLECTRODE | [2019/41] | Examination procedure | 18.02.2020 | Amendment by applicant (claims and/or description) | 18.02.2020 | Examination requested [2020/13] | 18.02.2020 | Date on which the examining division has become responsible | 17.03.2021 | Communication of intention to grant the patent | 10.05.2021 | Fee for grant paid | 10.05.2021 | Fee for publishing/printing paid | 10.05.2021 | Receipt of the translation of the claim(s) | Parent application(s) Tooltip | EP16731102.6 / EP3311428 | Opposition(s) | 22.04.2022 | No opposition filed within time limit [2022/26] | Fees paid | Renewal fee | 21.05.2019 | Renewal fee patent year 03 | 21.05.2019 | Renewal fee patent year 04 | 15.06.2020 | Renewal fee patent year 05 | 14.06.2021 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 16.06.2016 | AL | 21.07.2021 | AT | 21.07.2021 | CY | 21.07.2021 | CZ | 21.07.2021 | DK | 21.07.2021 | EE | 21.07.2021 | ES | 21.07.2021 | FI | 21.07.2021 | HR | 21.07.2021 | IT | 21.07.2021 | LT | 21.07.2021 | LV | 21.07.2021 | MC | 21.07.2021 | MK | 21.07.2021 | MT | 21.07.2021 | PL | 21.07.2021 | RO | 21.07.2021 | RS | 21.07.2021 | SE | 21.07.2021 | SI | 21.07.2021 | SK | 21.07.2021 | SM | 21.07.2021 | BG | 21.10.2021 | NO | 21.10.2021 | GR | 22.10.2021 | IS | 21.11.2021 | PT | 22.11.2021 | [2024/44] |
Former [2024/23] | HU | 16.06.2016 | |
AL | 21.07.2021 | ||
AT | 21.07.2021 | ||
CY | 21.07.2021 | ||
CZ | 21.07.2021 | ||
DK | 21.07.2021 | ||
EE | 21.07.2021 | ||
ES | 21.07.2021 | ||
FI | 21.07.2021 | ||
HR | 21.07.2021 | ||
IT | 21.07.2021 | ||
LT | 21.07.2021 | ||
LV | 21.07.2021 | ||
MC | 21.07.2021 | ||
MK | 21.07.2021 | ||
PL | 21.07.2021 | ||
RO | 21.07.2021 | ||
RS | 21.07.2021 | ||
SE | 21.07.2021 | ||
SI | 21.07.2021 | ||
SK | 21.07.2021 | ||
SM | 21.07.2021 | ||
BG | 21.10.2021 | ||
NO | 21.10.2021 | ||
GR | 22.10.2021 | ||
IS | 21.11.2021 | ||
PT | 22.11.2021 | ||
Former [2024/20] | HU | 16.06.2016 | |
AL | 21.07.2021 | ||
AT | 21.07.2021 | ||
CY | 21.07.2021 | ||
CZ | 21.07.2021 | ||
DK | 21.07.2021 | ||
EE | 21.07.2021 | ||
ES | 21.07.2021 | ||
FI | 21.07.2021 | ||
HR | 21.07.2021 | ||
IT | 21.07.2021 | ||
LT | 21.07.2021 | ||
LV | 21.07.2021 | ||
MC | 21.07.2021 | ||
PL | 21.07.2021 | ||
RO | 21.07.2021 | ||
RS | 21.07.2021 | ||
SE | 21.07.2021 | ||
SI | 21.07.2021 | ||
SK | 21.07.2021 | ||
SM | 21.07.2021 | ||
BG | 21.10.2021 | ||
NO | 21.10.2021 | ||
GR | 22.10.2021 | ||
IS | 21.11.2021 | ||
PT | 22.11.2021 | ||
Former [2024/18] | HU | 16.06.2016 | |
AL | 21.07.2021 | ||
AT | 21.07.2021 | ||
CZ | 21.07.2021 | ||
DK | 21.07.2021 | ||
EE | 21.07.2021 | ||
ES | 21.07.2021 | ||
FI | 21.07.2021 | ||
HR | 21.07.2021 | ||
IT | 21.07.2021 | ||
LT | 21.07.2021 | ||
LV | 21.07.2021 | ||
MC | 21.07.2021 | ||
PL | 21.07.2021 | ||
RO | 21.07.2021 | ||
RS | 21.07.2021 | ||
SE | 21.07.2021 | ||
SI | 21.07.2021 | ||
SK | 21.07.2021 | ||
SM | 21.07.2021 | ||
BG | 21.10.2021 | ||
NO | 21.10.2021 | ||
GR | 22.10.2021 | ||
IS | 21.11.2021 | ||
PT | 22.11.2021 | ||
Former [2023/08] | AL | 21.07.2021 | |
AT | 21.07.2021 | ||
CZ | 21.07.2021 | ||
DK | 21.07.2021 | ||
EE | 21.07.2021 | ||
ES | 21.07.2021 | ||
FI | 21.07.2021 | ||
HR | 21.07.2021 | ||
IT | 21.07.2021 | ||
LT | 21.07.2021 | ||
LV | 21.07.2021 | ||
MC | 21.07.2021 | ||
PL | 21.07.2021 | ||
RO | 21.07.2021 | ||
RS | 21.07.2021 | ||
SE | 21.07.2021 | ||
SI | 21.07.2021 | ||
SK | 21.07.2021 | ||
SM | 21.07.2021 | ||
BG | 21.10.2021 | ||
NO | 21.10.2021 | ||
GR | 22.10.2021 | ||
IS | 21.11.2021 | ||
PT | 22.11.2021 | ||
Former [2022/36] | AL | 21.07.2021 | |
AT | 21.07.2021 | ||
CZ | 21.07.2021 | ||
DK | 21.07.2021 | ||
EE | 21.07.2021 | ||
ES | 21.07.2021 | ||
FI | 21.07.2021 | ||
HR | 21.07.2021 | ||
IT | 21.07.2021 | ||
LT | 21.07.2021 | ||
LV | 21.07.2021 | ||
PL | 21.07.2021 | ||
RO | 21.07.2021 | ||
RS | 21.07.2021 | ||
SE | 21.07.2021 | ||
SI | 21.07.2021 | ||
SK | 21.07.2021 | ||
SM | 21.07.2021 | ||
BG | 21.10.2021 | ||
NO | 21.10.2021 | ||
GR | 22.10.2021 | ||
IS | 21.11.2021 | ||
PT | 22.11.2021 | ||
Former [2022/29] | AL | 21.07.2021 | |
AT | 21.07.2021 | ||
CZ | 21.07.2021 | ||
DK | 21.07.2021 | ||
EE | 21.07.2021 | ||
ES | 21.07.2021 | ||
FI | 21.07.2021 | ||
HR | 21.07.2021 | ||
LT | 21.07.2021 | ||
LV | 21.07.2021 | ||
PL | 21.07.2021 | ||
RO | 21.07.2021 | ||
RS | 21.07.2021 | ||
SE | 21.07.2021 | ||
SI | 21.07.2021 | ||
SK | 21.07.2021 | ||
SM | 21.07.2021 | ||
BG | 21.10.2021 | ||
NO | 21.10.2021 | ||
GR | 22.10.2021 | ||
IS | 21.11.2021 | ||
PT | 22.11.2021 | ||
Former [2022/25] | AT | 21.07.2021 | |
CZ | 21.07.2021 | ||
DK | 21.07.2021 | ||
EE | 21.07.2021 | ||
ES | 21.07.2021 | ||
FI | 21.07.2021 | ||
HR | 21.07.2021 | ||
LT | 21.07.2021 | ||
LV | 21.07.2021 | ||
PL | 21.07.2021 | ||
RO | 21.07.2021 | ||
RS | 21.07.2021 | ||
SE | 21.07.2021 | ||
SK | 21.07.2021 | ||
SM | 21.07.2021 | ||
BG | 21.10.2021 | ||
NO | 21.10.2021 | ||
GR | 22.10.2021 | ||
IS | 21.11.2021 | ||
PT | 22.11.2021 | ||
Former [2022/24] | AT | 21.07.2021 | |
CZ | 21.07.2021 | ||
DK | 21.07.2021 | ||
EE | 21.07.2021 | ||
ES | 21.07.2021 | ||
FI | 21.07.2021 | ||
HR | 21.07.2021 | ||
LT | 21.07.2021 | ||
LV | 21.07.2021 | ||
PL | 21.07.2021 | ||
RO | 21.07.2021 | ||
RS | 21.07.2021 | ||
SE | 21.07.2021 | ||
SK | 21.07.2021 | ||
BG | 21.10.2021 | ||
NO | 21.10.2021 | ||
GR | 22.10.2021 | ||
IS | 21.11.2021 | ||
PT | 22.11.2021 | ||
Former [2022/21] | AT | 21.07.2021 | |
DK | 21.07.2021 | ||
ES | 21.07.2021 | ||
FI | 21.07.2021 | ||
HR | 21.07.2021 | ||
LT | 21.07.2021 | ||
LV | 21.07.2021 | ||
PL | 21.07.2021 | ||
RS | 21.07.2021 | ||
SE | 21.07.2021 | ||
BG | 21.10.2021 | ||
NO | 21.10.2021 | ||
GR | 22.10.2021 | ||
IS | 21.11.2021 | ||
PT | 22.11.2021 | ||
Former [2022/11] | AT | 21.07.2021 | |
ES | 21.07.2021 | ||
FI | 21.07.2021 | ||
HR | 21.07.2021 | ||
LT | 21.07.2021 | ||
LV | 21.07.2021 | ||
PL | 21.07.2021 | ||
RS | 21.07.2021 | ||
SE | 21.07.2021 | ||
BG | 21.10.2021 | ||
NO | 21.10.2021 | ||
GR | 22.10.2021 | ||
IS | 21.11.2021 | ||
PT | 22.11.2021 | ||
Former [2022/09] | AT | 21.07.2021 | |
ES | 21.07.2021 | ||
FI | 21.07.2021 | ||
LT | 21.07.2021 | ||
RS | 21.07.2021 | ||
SE | 21.07.2021 | ||
BG | 21.10.2021 | ||
NO | 21.10.2021 | ||
PT | 22.11.2021 | ||
Former [2022/08] | AT | 21.07.2021 | |
ES | 21.07.2021 | ||
FI | 21.07.2021 | ||
LT | 21.07.2021 | ||
SE | 21.07.2021 | ||
BG | 21.10.2021 | ||
NO | 21.10.2021 | ||
Former [2022/07] | AT | 21.07.2021 | |
LT | 21.07.2021 | ||
NO | 21.10.2021 | Documents cited: | Search | [A]JPH1154286 (PIONEER ELECTRONIC CORP, et al) [A] 1-4* abstract *; | [A]US2011312120 (WEINER KURT H [US], et al) [A] 1-4 * figures 6a-6e * * paragraphs [0074] - [0078] - [0081] , [0083] *; | [A]FR2991505 (COMMISSARIAT ENERGIE ATOMIQUE [FR], et al) [A] 1-4 * pages 1,8,9,10; figures 2,3 * | by applicant | FR2991505 | - GUILLAUME WANTZ et al., Polym Int, (20140000), vol. 63, pages 1346 - 1361 |