blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3582352

EP3582352 - ELECTRIC INSTALLATION CABINET [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  23.12.2022
Database last updated on 14.09.2024
FormerThe patent has been granted
Status updated on  14.01.2022
FormerGrant of patent is intended
Status updated on  04.10.2021
FormerExamination is in progress
Status updated on  21.08.2020
FormerRequest for examination was made
Status updated on  26.06.2020
FormerThe application has been published
Status updated on  15.11.2019
Most recent event   Tooltip17.05.2024Lapse of the patent in a contracting state
New state(s): HU
published on 19.06.2024  [2024/25]
Applicant(s)For all designated states
Triarca A/S
Bjørnkærvej 3
8783 Hornsyld / DK
[2020/04]
Former [2019/51]For all designated states
Elogic A/S
Bjørnkærvej 3
8783 Hornsyld / DK
Inventor(s)01 / CHRISTIANSEN, Henning
Valmuevej 11
8700 Horsens / DK
 [2019/51]
Representative(s)Patrade A/S
Ceresbyen 75
8000 Aarhus C / DK
[2022/07]
Former [2019/51]Tellefsen, Jens J., et al
Patrade A/S
Ceresbyen 75
8000 Aarhus C / DK
Application number, filing date19180223.014.06.2019
[2019/51]
Priority number, dateDK2018PA7040515.06.2018         Original published format: DK PA201870405
[2019/51]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3582352
Date:18.12.2019
Language:EN
[2019/51]
Type: B1 Patent specification 
No.:EP3582352
Date:16.02.2022
Language:EN
[2022/07]
Search report(s)(Supplementary) European search report - dispatched on:EP05.09.2019
ClassificationIPC:H02G9/10, H02B1/30, H02B1/50, // E02D27/42
[2021/37]
CPC:
H02G9/10 (EP); H02B1/305 (EP); H02B1/50 (EP);
E02D27/42 (EP)
Former IPC [2019/51]H02G9/10, H02B1/30, H02B1/50, E02D27/12
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/31]
Former [2019/51]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:ELEKTROINSTALLATIONSSCHRANK[2019/51]
English:ELECTRIC INSTALLATION CABINET[2019/51]
French:ARMOIRE D'INSTALLATION ÉLECTRIQUE[2019/51]
Examination procedure18.06.2020Amendment by applicant (claims and/or description)
18.06.2020Examination requested  [2020/31]
18.06.2020Date on which the examining division has become responsible
20.08.2020Despatch of a communication from the examining division (Time limit: M04)
08.12.2020Reply to a communication from the examining division
15.02.2021Despatch of a communication from the examining division (Time limit: M02)
16.04.2021Reply to a communication from the examining division
05.10.2021Communication of intention to grant the patent
10.01.2022Fee for grant paid
10.01.2022Fee for publishing/printing paid
10.01.2022Receipt of the translation of the claim(s)
Opposition(s)17.11.2022No opposition filed within time limit [2023/04]
Fees paidRenewal fee
28.06.2021Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU14.06.2019
AL16.02.2022
AT16.02.2022
CY16.02.2022
CZ16.02.2022
EE16.02.2022
ES16.02.2022
HR16.02.2022
IT16.02.2022
LT16.02.2022
LV16.02.2022
MC16.02.2022
MK16.02.2022
NL16.02.2022
PL16.02.2022
RO16.02.2022
RS16.02.2022
SI16.02.2022
SK16.02.2022
SM16.02.2022
BG16.05.2022
GR17.05.2022
IE14.06.2022
LU14.06.2022
PT16.06.2022
IS17.06.2022
BE30.06.2022
CH30.06.2022
FR30.06.2022
LI30.06.2022
[2024/25]
Former [2024/23]AL16.02.2022
AT16.02.2022
CY16.02.2022
CZ16.02.2022
EE16.02.2022
ES16.02.2022
HR16.02.2022
IT16.02.2022
LT16.02.2022
LV16.02.2022
MC16.02.2022
MK16.02.2022
NL16.02.2022
PL16.02.2022
RO16.02.2022
RS16.02.2022
SI16.02.2022
SK16.02.2022
SM16.02.2022
BG16.05.2022
GR17.05.2022
IE14.06.2022
LU14.06.2022
PT16.06.2022
IS17.06.2022
BE30.06.2022
CH30.06.2022
FR30.06.2022
LI30.06.2022
Former [2024/20]AL16.02.2022
AT16.02.2022
CY16.02.2022
CZ16.02.2022
EE16.02.2022
ES16.02.2022
HR16.02.2022
IT16.02.2022
LT16.02.2022
LV16.02.2022
MC16.02.2022
NL16.02.2022
PL16.02.2022
RO16.02.2022
RS16.02.2022
SI16.02.2022
SK16.02.2022
SM16.02.2022
BG16.05.2022
GR17.05.2022
IE14.06.2022
LU14.06.2022
PT16.06.2022
IS17.06.2022
BE30.06.2022
CH30.06.2022
FR30.06.2022
LI30.06.2022
Former [2023/35]AL16.02.2022
AT16.02.2022
CZ16.02.2022
EE16.02.2022
ES16.02.2022
HR16.02.2022
IT16.02.2022
LT16.02.2022
LV16.02.2022
MC16.02.2022
NL16.02.2022
PL16.02.2022
RO16.02.2022
RS16.02.2022
SI16.02.2022
SK16.02.2022
SM16.02.2022
BG16.05.2022
GR17.05.2022
IE14.06.2022
LU14.06.2022
PT16.06.2022
IS17.06.2022
BE30.06.2022
CH30.06.2022
FR30.06.2022
LI30.06.2022
Former [2023/25]AL16.02.2022
AT16.02.2022
CZ16.02.2022
EE16.02.2022
ES16.02.2022
HR16.02.2022
LT16.02.2022
LV16.02.2022
MC16.02.2022
NL16.02.2022
PL16.02.2022
RO16.02.2022
RS16.02.2022
SI16.02.2022
SK16.02.2022
SM16.02.2022
BG16.05.2022
GR17.05.2022
IE14.06.2022
LU14.06.2022
PT16.06.2022
IS17.06.2022
BE30.06.2022
CH30.06.2022
FR30.06.2022
LI30.06.2022
Former [2023/22]AL16.02.2022
AT16.02.2022
CZ16.02.2022
EE16.02.2022
ES16.02.2022
HR16.02.2022
LT16.02.2022
LV16.02.2022
MC16.02.2022
NL16.02.2022
PL16.02.2022
RO16.02.2022
RS16.02.2022
SI16.02.2022
SK16.02.2022
SM16.02.2022
BG16.05.2022
GR17.05.2022
IE14.06.2022
LU14.06.2022
PT16.06.2022
IS17.06.2022
CH30.06.2022
FR30.06.2022
LI30.06.2022
Former [2023/21]AL16.02.2022
AT16.02.2022
CZ16.02.2022
EE16.02.2022
ES16.02.2022
HR16.02.2022
LT16.02.2022
LV16.02.2022
MC16.02.2022
NL16.02.2022
PL16.02.2022
RO16.02.2022
RS16.02.2022
SI16.02.2022
SK16.02.2022
SM16.02.2022
BG16.05.2022
GR17.05.2022
IE14.06.2022
LU14.06.2022
PT16.06.2022
IS17.06.2022
CH30.06.2022
LI30.06.2022
Former [2023/20]AL16.02.2022
AT16.02.2022
CZ16.02.2022
EE16.02.2022
ES16.02.2022
HR16.02.2022
LT16.02.2022
LV16.02.2022
MC16.02.2022
NL16.02.2022
PL16.02.2022
RO16.02.2022
RS16.02.2022
SI16.02.2022
SK16.02.2022
SM16.02.2022
BG16.05.2022
GR17.05.2022
IE14.06.2022
PT16.06.2022
IS17.06.2022
Former [2023/10]AL16.02.2022
AT16.02.2022
CZ16.02.2022
EE16.02.2022
ES16.02.2022
HR16.02.2022
LT16.02.2022
LV16.02.2022
MC16.02.2022
NL16.02.2022
PL16.02.2022
RO16.02.2022
RS16.02.2022
SI16.02.2022
SK16.02.2022
SM16.02.2022
BG16.05.2022
GR17.05.2022
PT16.06.2022
IS17.06.2022
Former [2023/08]AL16.02.2022
AT16.02.2022
CZ16.02.2022
EE16.02.2022
ES16.02.2022
HR16.02.2022
LT16.02.2022
LV16.02.2022
MC16.02.2022
NL16.02.2022
PL16.02.2022
RO16.02.2022
RS16.02.2022
SK16.02.2022
SM16.02.2022
BG16.05.2022
GR17.05.2022
PT16.06.2022
IS17.06.2022
Former [2023/01]AL16.02.2022
AT16.02.2022
CZ16.02.2022
EE16.02.2022
ES16.02.2022
HR16.02.2022
LT16.02.2022
LV16.02.2022
NL16.02.2022
PL16.02.2022
RO16.02.2022
RS16.02.2022
SK16.02.2022
SM16.02.2022
BG16.05.2022
GR17.05.2022
PT16.06.2022
IS17.06.2022
Former [2022/49]AT16.02.2022
CZ16.02.2022
EE16.02.2022
ES16.02.2022
HR16.02.2022
LT16.02.2022
LV16.02.2022
NL16.02.2022
PL16.02.2022
RO16.02.2022
RS16.02.2022
SK16.02.2022
SM16.02.2022
BG16.05.2022
GR17.05.2022
PT16.06.2022
IS17.06.2022
Former [2022/48]AT16.02.2022
CZ16.02.2022
EE16.02.2022
ES16.02.2022
HR16.02.2022
LT16.02.2022
LV16.02.2022
NL16.02.2022
PL16.02.2022
RO16.02.2022
RS16.02.2022
SM16.02.2022
BG16.05.2022
GR17.05.2022
PT16.06.2022
IS17.06.2022
Former [2022/47]AT16.02.2022
ES16.02.2022
HR16.02.2022
LT16.02.2022
LV16.02.2022
NL16.02.2022
PL16.02.2022
RO16.02.2022
RS16.02.2022
SM16.02.2022
BG16.05.2022
GR17.05.2022
PT16.06.2022
IS17.06.2022
Former [2022/42]AT16.02.2022
ES16.02.2022
HR16.02.2022
LT16.02.2022
LV16.02.2022
NL16.02.2022
PL16.02.2022
RS16.02.2022
BG16.05.2022
GR17.05.2022
PT16.06.2022
IS17.06.2022
Former [2022/36]AT16.02.2022
ES16.02.2022
HR16.02.2022
LT16.02.2022
LV16.02.2022
NL16.02.2022
PL16.02.2022
RS16.02.2022
BG16.05.2022
GR17.05.2022
PT16.06.2022
Former [2022/35]ES16.02.2022
HR16.02.2022
LT16.02.2022
NL16.02.2022
RS16.02.2022
BG16.05.2022
PT16.06.2022
Former [2022/34]ES16.02.2022
LT16.02.2022
NL16.02.2022
PT16.06.2022
Former [2022/33]LT16.02.2022
Documents cited:Search[Y]CA1082620  (HANAOKA TADAO, et al) [Y] 1-9 * figure 1 ** page 8, lines 10,11 *;
 [Y]US2009147483  (IRMER GUNTER [DE], et al) [Y] 1-9 * figures 4a, 6c, 9a, 13b, 13d * * paragraphs [0002] , [0 10] , [0 20] , [0 51] , [0 52] , [0 75] *;
 [Y]DE102014003038  (MURRPLASTIK SYSTEMTECHNIK GMBH [DE]) [Y] 1-9 * figures 1, 3 * * paragraph [0014] *
by applicantDE9010988U
 DE19524103
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.