EP3588045 - METHOD FOR DETERMINING AN UNBALANCE OF A SHAFT-ELASTIC ROTOR WITH REFERENCE TO THE OUTWARD DEFLECTION [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 25.03.2022 Database last updated on 08.10.2024 | |
Former | The patent has been granted Status updated on 16.04.2021 | ||
Former | Grant of patent is intended Status updated on 10.12.2020 | ||
Former | Request for examination was made Status updated on 03.07.2020 | ||
Former | The application has been published Status updated on 05.12.2019 | Most recent event Tooltip | 13.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 16.10.2024 [2024/42] | Applicant(s) | For all designated states Schenck RoTec GmbH Landwehrstrasse 55 64293 Darmstadt / DE | [2020/01] | Inventor(s) | 01 /
Wanke, Thomas Brunnengasse 9 64823 Groß-Umstadt / DE | 02 /
Hartnagel, Matthias Finkenweg 8 64625 Bensheim / DE | [2020/01] | Representative(s) | Haarpatent Patentanwälte Krämer Meyer Goethestraße 2 61231 Bad Nauheim / DE | [N/P] |
Former [2021/20] | Meyer, Niels Thorben Haarpatent Patentanwälte Krämer Meyer Goethestraße 2 61231 Bad Nauheim / DE | ||
Former [2020/01] | Haarpatent Patentanwälte Krämer Meyer Goethestraße 2 61231 Bad Nauheim / DE | Application number, filing date | 19181158.7 | 19.06.2019 | [2020/01] | Priority number, date | DE201810115363 | 26.06.2018 Original published format: DE102018115363 | [2020/01] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | EP3588045 | Date: | 01.01.2020 | Language: | DE | [2020/01] | Type: | B1 Patent specification | No.: | EP3588045 | Date: | 19.05.2021 | Language: | DE | [2021/20] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 04.12.2019 | Classification | IPC: | G01M1/24, F01D5/02 | [2020/01] | CPC: |
G01M1/24 (EP,CN,US);
F01D5/027 (EP,US);
F04D29/662 (EP);
F16F15/322 (US);
G01M1/28 (US);
F05D2260/12 (EP);
F05D2270/821 (EP)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/32] |
Former [2020/01] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | VERFAHREN ZUR BESTIMMUNG EINER UNWUCHT EINES WELLENELASTISCHEN ROTORS ANHAND DER AUSBIEGUNG | [2020/01] | English: | METHOD FOR DETERMINING AN UNBALANCE OF A SHAFT-ELASTIC ROTOR WITH REFERENCE TO THE OUTWARD DEFLECTION | [2020/01] | French: | PROCÉDÉ DE DÉTERMINATION D'UN DÉSÉQUILIBRE D'UN ROTOR ÉLASTIQUE D'ARBRE EN CE QUI CONCERNE LA FLEXION EXTÉRIEURE | [2020/01] | Examination procedure | 26.06.2020 | Amendment by applicant (claims and/or description) | 26.06.2020 | Examination requested [2020/32] | 26.06.2020 | Date on which the examining division has become responsible | 11.12.2020 | Communication of intention to grant the patent | 13.04.2021 | Fee for grant paid | 13.04.2021 | Fee for publishing/printing paid | 13.04.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 22.02.2022 | No opposition filed within time limit [2022/17] |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 19.06.2019 | AL | 19.05.2021 | CY | 19.05.2021 | CZ | 19.05.2021 | DK | 19.05.2021 | EE | 19.05.2021 | ES | 19.05.2021 | HR | 19.05.2021 | LT | 19.05.2021 | LV | 19.05.2021 | MC | 19.05.2021 | MK | 19.05.2021 | MT | 19.05.2021 | NL | 19.05.2021 | RO | 19.05.2021 | RS | 19.05.2021 | SI | 19.05.2021 | SM | 19.05.2021 | IE | 19.06.2021 | LU | 19.06.2021 | BE | 30.06.2021 | BG | 19.08.2021 | NO | 19.08.2021 | GR | 20.08.2021 | IS | 19.09.2021 | PT | 20.09.2021 | [2024/42] |
Former [2024/23] | HU | 19.06.2019 | |
AL | 19.05.2021 | ||
CY | 19.05.2021 | ||
CZ | 19.05.2021 | ||
DK | 19.05.2021 | ||
EE | 19.05.2021 | ||
ES | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
MC | 19.05.2021 | ||
MK | 19.05.2021 | ||
NL | 19.05.2021 | ||
RO | 19.05.2021 | ||
RS | 19.05.2021 | ||
SI | 19.05.2021 | ||
SM | 19.05.2021 | ||
IE | 19.06.2021 | ||
LU | 19.06.2021 | ||
BE | 30.06.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
IS | 19.09.2021 | ||
PT | 20.09.2021 | ||
Former [2023/33] | HU | 19.06.2019 | |
AL | 19.05.2021 | ||
CY | 19.05.2021 | ||
CZ | 19.05.2021 | ||
DK | 19.05.2021 | ||
EE | 19.05.2021 | ||
ES | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
MC | 19.05.2021 | ||
NL | 19.05.2021 | ||
RO | 19.05.2021 | ||
RS | 19.05.2021 | ||
SI | 19.05.2021 | ||
SM | 19.05.2021 | ||
IE | 19.06.2021 | ||
LU | 19.06.2021 | ||
BE | 30.06.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
IS | 19.09.2021 | ||
PT | 20.09.2021 | ||
Former [2023/30] | AL | 19.05.2021 | |
CY | 19.05.2021 | ||
CZ | 19.05.2021 | ||
DK | 19.05.2021 | ||
EE | 19.05.2021 | ||
ES | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
MC | 19.05.2021 | ||
NL | 19.05.2021 | ||
RO | 19.05.2021 | ||
RS | 19.05.2021 | ||
SI | 19.05.2021 | ||
SM | 19.05.2021 | ||
IE | 19.06.2021 | ||
LU | 19.06.2021 | ||
BE | 30.06.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
IS | 19.09.2021 | ||
PT | 20.09.2021 | ||
Former [2022/34] | AL | 19.05.2021 | |
CZ | 19.05.2021 | ||
DK | 19.05.2021 | ||
EE | 19.05.2021 | ||
ES | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
MC | 19.05.2021 | ||
NL | 19.05.2021 | ||
RO | 19.05.2021 | ||
RS | 19.05.2021 | ||
SI | 19.05.2021 | ||
SM | 19.05.2021 | ||
IE | 19.06.2021 | ||
LU | 19.06.2021 | ||
BE | 30.06.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
IS | 19.09.2021 | ||
PT | 20.09.2021 | ||
Former [2022/29] | AL | 19.05.2021 | |
CZ | 19.05.2021 | ||
DK | 19.05.2021 | ||
EE | 19.05.2021 | ||
ES | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
MC | 19.05.2021 | ||
NL | 19.05.2021 | ||
RO | 19.05.2021 | ||
RS | 19.05.2021 | ||
SI | 19.05.2021 | ||
SM | 19.05.2021 | ||
IE | 19.06.2021 | ||
LU | 19.06.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
IS | 19.09.2021 | ||
PT | 20.09.2021 | ||
Former [2022/26] | AL | 19.05.2021 | |
CZ | 19.05.2021 | ||
DK | 19.05.2021 | ||
EE | 19.05.2021 | ||
ES | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
MC | 19.05.2021 | ||
NL | 19.05.2021 | ||
RO | 19.05.2021 | ||
RS | 19.05.2021 | ||
SM | 19.05.2021 | ||
IE | 19.06.2021 | ||
LU | 19.06.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
IS | 19.09.2021 | ||
PT | 20.09.2021 | ||
Former [2022/23] | CZ | 19.05.2021 | |
DK | 19.05.2021 | ||
EE | 19.05.2021 | ||
ES | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
MC | 19.05.2021 | ||
NL | 19.05.2021 | ||
RO | 19.05.2021 | ||
RS | 19.05.2021 | ||
SM | 19.05.2021 | ||
IE | 19.06.2021 | ||
LU | 19.06.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
IS | 19.09.2021 | ||
PT | 20.09.2021 | ||
Former [2022/21] | CZ | 19.05.2021 | |
DK | 19.05.2021 | ||
EE | 19.05.2021 | ||
ES | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
MC | 19.05.2021 | ||
NL | 19.05.2021 | ||
RO | 19.05.2021 | ||
RS | 19.05.2021 | ||
SM | 19.05.2021 | ||
IE | 19.06.2021 | ||
LU | 19.06.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
PT | 20.09.2021 | ||
IS | 22.12.2021 | ||
Former [2022/18] | CZ | 19.05.2021 | |
DK | 19.05.2021 | ||
EE | 19.05.2021 | ||
ES | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
MC | 19.05.2021 | ||
NL | 19.05.2021 | ||
RO | 19.05.2021 | ||
RS | 19.05.2021 | ||
SM | 19.05.2021 | ||
LU | 19.06.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
PT | 20.09.2021 | ||
IS | 22.12.2021 | ||
Former [2022/10] | CZ | 19.05.2021 | |
DK | 19.05.2021 | ||
EE | 19.05.2021 | ||
ES | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
NL | 19.05.2021 | ||
RO | 19.05.2021 | ||
RS | 19.05.2021 | ||
SM | 19.05.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
PT | 20.09.2021 | ||
IS | 22.12.2021 | ||
Former [2022/09] | CZ | 19.05.2021 | |
DK | 19.05.2021 | ||
ES | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
NL | 19.05.2021 | ||
RO | 19.05.2021 | ||
RS | 19.05.2021 | ||
SM | 19.05.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
IS | 19.09.2021 | ||
PT | 20.09.2021 | ||
Former [2022/08] | CZ | 19.05.2021 | |
DK | 19.05.2021 | ||
ES | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
NL | 19.05.2021 | ||
RS | 19.05.2021 | ||
SM | 19.05.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
IS | 19.09.2021 | ||
PT | 20.09.2021 | ||
Former [2022/07] | HR | 19.05.2021 | |
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
NL | 19.05.2021 | ||
RS | 19.05.2021 | ||
SM | 19.05.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
IS | 19.09.2021 | ||
PT | 20.09.2021 | ||
Former [2022/04] | HR | 19.05.2021 | |
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
NL | 19.05.2021 | ||
RS | 19.05.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
IS | 19.09.2021 | ||
PT | 20.09.2021 | ||
Former [2021/51] | HR | 19.05.2021 | |
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
RS | 19.05.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
IS | 19.09.2021 | ||
PT | 20.09.2021 | ||
Former [2021/50] | HR | 19.05.2021 | |
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
PT | 20.09.2021 | ||
Former [2021/49] | HR | 19.05.2021 | |
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
Former [2021/46] | LT | 19.05.2021 | |
BG | 19.08.2021 | Documents cited: | Search | [AD]DE3044440 (HOFMANN GMBH & CO KG MASCHINEN [DE]) [AD] 4 * abstract ** figure 1 *; | [XI]US5724271 (BANKERT RAYMOND JOHN [US], et al) [X] 1-3 * abstract * * column 6, line 55 - column 9, line 52 * [I] 4-7; | [XI]DE102010063812 (SIEMENS AG [DE]) [X] 1-3 * abstract * * paragraphs [0007] , [ 0010] , [ 0030] , [ 0038] , [ 0041] * * figure 1 * [I] 4-7 | by applicant | DE2407705 | DE4019721 | DE3044440 | - W. KELLENBERGER, Elastisches Wuchten, (19870000), pages 317 - 325 |