| EP3622850 - BACK-HELD CARRYING DEVICE, IN PARTICULAR FOR A BATTERY PACK [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 05.11.2021 Database last updated on 26.03.2026 | |
| Former | The patent has been granted Status updated on 27.11.2020 | ||
| Former | Grant of patent is intended Status updated on 25.08.2020 | ||
| Former | Request for examination was made Status updated on 19.06.2020 | ||
| Former | The application has been published Status updated on 14.02.2020 | Most recent event Tooltip | 13.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 16.10.2024 [2024/42] | Applicant(s) | For all designated states Andreas Stihl AG & Co. KG Badstrasse 115 71336 Waiblingen / DE | [2020/12] | Inventor(s) | 01 /
NORDMANN, Alexander Fleiner Str. 72 70437 Stuttgart / DE | 02 /
HERRMANN, Markus Zeppelinstr. 28 70736 Fellbach / DE | 03 /
WAGNER, Daniel Im Sterrenberg 2 73650 Winterbach / DE | 04 /
ZELLER, Markus Lilienweg 4 73527 Schwäbisch-Gmünd/Herlikhofen / DE | 05 /
KOLB, Joachim Tilsiter Str. 4 71638 Ludwigsburg / DE | 06 /
PFEIFER, Markus Kopernikusstr. 7 71364 Winnenden / DE | [2020/12] | Representative(s) | Patentanwälte Ruff, Wilhelm, Beier, Dauster & Partner mbB Kronenstraße 30 70174 Stuttgart / DE | [2020/12] | Application number, filing date | 19183590.9 | 01.07.2019 | [2020/12] | Priority number, date | EP20180194891 | 17.09.2018 Original published format: EP 18194891 | [2020/12] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | EP3622850 | Date: | 18.03.2020 | Language: | DE | [2020/12] | Type: | B1 Patent specification | No.: | EP3622850 | Date: | 30.12.2020 | Language: | DE | [2020/53] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 18.02.2020 | Classification | IPC: | A45F3/04, A45F3/08, B25F5/02, H01M2/10 | [2020/12] | CPC: |
B25F5/02 (EP);
A45F3/14 (CN,US);
A45F3/04 (US);
A45F3/08 (EP);
H01M50/247 (EP,CN,US);
H01M50/256 (EP,US);
A45F2003/045 (US);
A45F2003/146 (US);
H01M2220/30 (EP);
Y02E60/10 (EP)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/30] |
| Former [2020/12] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | RÜCKENTRAGVORRICHTUNG, INSBESONDERE FÜR EINEN AKKUPACK | [2020/12] | English: | BACK-HELD CARRYING DEVICE, IN PARTICULAR FOR A BATTERY PACK | [2020/12] | French: | DISPOSITIF DE PORTAGE DERRIÈRE, EN PARTICULIER POUR UN BLOC D'ACCUMULATEUR | [2020/12] | Examination procedure | 15.06.2020 | Examination requested [2020/30] | 15.06.2020 | Date on which the examining division has become responsible | 26.08.2020 | Communication of intention to grant the patent | 18.11.2020 | Fee for grant paid | 18.11.2020 | Fee for publishing/printing paid | 18.11.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 01.10.2021 | No opposition filed within time limit [2021/49] |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 01.07.2019 | AL | 30.12.2020 | CY | 30.12.2020 | CZ | 30.12.2020 | DK | 30.12.2020 | EE | 30.12.2020 | FI | 30.12.2020 | HR | 30.12.2020 | IT | 30.12.2020 | LT | 30.12.2020 | LV | 30.12.2020 | MC | 30.12.2020 | MK | 30.12.2020 | MT | 30.12.2020 | NL | 30.12.2020 | PL | 30.12.2020 | RO | 30.12.2020 | RS | 30.12.2020 | SE | 30.12.2020 | SI | 30.12.2020 | SK | 30.12.2020 | SM | 30.12.2020 | TR | 30.12.2020 | BG | 30.03.2021 | NO | 30.03.2021 | GR | 31.03.2021 | IS | 30.04.2021 | PT | 30.04.2021 | IE | 01.07.2021 | LU | 01.07.2021 | BE | 31.07.2021 | [2024/42] |
| Former [2024/29] | HU | 01.07.2019 | |
| AL | 30.12.2020 | ||
| CY | 30.12.2020 | ||
| CZ | 30.12.2020 | ||
| DK | 30.12.2020 | ||
| EE | 30.12.2020 | ||
| FI | 30.12.2020 | ||
| HR | 30.12.2020 | ||
| IT | 30.12.2020 | ||
| LT | 30.12.2020 | ||
| LV | 30.12.2020 | ||
| MC | 30.12.2020 | ||
| MK | 30.12.2020 | ||
| NL | 30.12.2020 | ||
| PL | 30.12.2020 | ||
| RO | 30.12.2020 | ||
| RS | 30.12.2020 | ||
| SE | 30.12.2020 | ||
| SI | 30.12.2020 | ||
| SK | 30.12.2020 | ||
| SM | 30.12.2020 | ||
| TR | 30.12.2020 | ||
| BG | 30.03.2021 | ||
| NO | 30.03.2021 | ||
| GR | 31.03.2021 | ||
| IS | 30.04.2021 | ||
| PT | 30.04.2021 | ||
| IE | 01.07.2021 | ||
| LU | 01.07.2021 | ||
| BE | 31.07.2021 | ||
| Former [2024/23] | HU | 01.07.2019 | |
| AL | 30.12.2020 | ||
| CY | 30.12.2020 | ||
| CZ | 30.12.2020 | ||
| DK | 30.12.2020 | ||
| EE | 30.12.2020 | ||
| FI | 30.12.2020 | ||
| HR | 30.12.2020 | ||
| IT | 30.12.2020 | ||
| LT | 30.12.2020 | ||
| LV | 30.12.2020 | ||
| MC | 30.12.2020 | ||
| MK | 30.12.2020 | ||
| NL | 30.12.2020 | ||
| PL | 30.12.2020 | ||
| RO | 30.12.2020 | ||
| RS | 30.12.2020 | ||
| SE | 30.12.2020 | ||
| SI | 30.12.2020 | ||
| SK | 30.12.2020 | ||
| SM | 30.12.2020 | ||
| BG | 30.03.2021 | ||
| NO | 30.03.2021 | ||
| GR | 31.03.2021 | ||
| IS | 30.04.2021 | ||
| PT | 30.04.2021 | ||
| IE | 01.07.2021 | ||
| LU | 01.07.2021 | ||
| BE | 31.07.2021 | ||
| Former [2023/33] | HU | 01.07.2019 | |
| AL | 30.12.2020 | ||
| CY | 30.12.2020 | ||
| CZ | 30.12.2020 | ||
| DK | 30.12.2020 | ||
| EE | 30.12.2020 | ||
| FI | 30.12.2020 | ||
| HR | 30.12.2020 | ||
| IT | 30.12.2020 | ||
| LT | 30.12.2020 | ||
| LV | 30.12.2020 | ||
| MC | 30.12.2020 | ||
| NL | 30.12.2020 | ||
| PL | 30.12.2020 | ||
| RO | 30.12.2020 | ||
| RS | 30.12.2020 | ||
| SE | 30.12.2020 | ||
| SI | 30.12.2020 | ||
| SK | 30.12.2020 | ||
| SM | 30.12.2020 | ||
| BG | 30.03.2021 | ||
| NO | 30.03.2021 | ||
| GR | 31.03.2021 | ||
| IS | 30.04.2021 | ||
| PT | 30.04.2021 | ||
| IE | 01.07.2021 | ||
| LU | 01.07.2021 | ||
| BE | 31.07.2021 | ||
| Former [2023/30] | AL | 30.12.2020 | |
| CY | 30.12.2020 | ||
| CZ | 30.12.2020 | ||
| DK | 30.12.2020 | ||
| EE | 30.12.2020 | ||
| FI | 30.12.2020 | ||
| HR | 30.12.2020 | ||
| IT | 30.12.2020 | ||
| LT | 30.12.2020 | ||
| LV | 30.12.2020 | ||
| MC | 30.12.2020 | ||
| NL | 30.12.2020 | ||
| PL | 30.12.2020 | ||
| RO | 30.12.2020 | ||
| RS | 30.12.2020 | ||
| SE | 30.12.2020 | ||
| SI | 30.12.2020 | ||
| SK | 30.12.2020 | ||
| BG | 30.03.2021 | ||
| NO | 30.03.2021 | ||
| GR | 31.03.2021 | ||
| IS | 30.04.2021 | ||
| PT | 30.04.2021 | ||
| IE | 01.07.2021 | ||
| LU | 01.07.2021 | ||
| BE | 31.07.2021 | ||
| Former [2023/29] | AL | 30.12.2020 | |
| CZ | 30.12.2020 | ||
| DK | 30.12.2020 | ||
| EE | 30.12.2020 | ||
| FI | 30.12.2020 | ||
| HR | 30.12.2020 | ||
| IT | 30.12.2020 | ||
| LT | 30.12.2020 | ||
| LV | 30.12.2020 | ||
| MC | 30.12.2020 | ||
| NL | 30.12.2020 | ||
| PL | 30.12.2020 | ||
| RO | 30.12.2020 | ||
| RS | 30.12.2020 | ||
| SE | 30.12.2020 | ||
| SI | 30.12.2020 | ||
| SK | 30.12.2020 | ||
| BG | 30.03.2021 | ||
| NO | 30.03.2021 | ||
| GR | 31.03.2021 | ||
| IS | 30.04.2021 | ||
| PT | 30.04.2021 | ||
| IE | 01.07.2021 | ||
| LU | 01.07.2021 | ||
| BE | 31.07.2021 | ||
| Former [2022/35] | AL | 30.12.2020 | |
| CZ | 30.12.2020 | ||
| DK | 30.12.2020 | ||
| EE | 30.12.2020 | ||
| FI | 30.12.2020 | ||
| HR | 30.12.2020 | ||
| IT | 30.12.2020 | ||
| LT | 30.12.2020 | ||
| LV | 30.12.2020 | ||
| MC | 30.12.2020 | ||
| PL | 30.12.2020 | ||
| RO | 30.12.2020 | ||
| RS | 30.12.2020 | ||
| SE | 30.12.2020 | ||
| SI | 30.12.2020 | ||
| SK | 30.12.2020 | ||
| BG | 30.03.2021 | ||
| NO | 30.03.2021 | ||
| GR | 31.03.2021 | ||
| IS | 30.04.2021 | ||
| PT | 30.04.2021 | ||
| IE | 01.07.2021 | ||
| LU | 01.07.2021 | ||
| BE | 31.07.2021 | ||
| Former [2022/34] | AL | 30.12.2020 | |
| CZ | 30.12.2020 | ||
| DK | 30.12.2020 | ||
| EE | 30.12.2020 | ||
| FI | 30.12.2020 | ||
| HR | 30.12.2020 | ||
| IT | 30.12.2020 | ||
| LT | 30.12.2020 | ||
| LV | 30.12.2020 | ||
| MC | 30.12.2020 | ||
| PL | 30.12.2020 | ||
| RO | 30.12.2020 | ||
| RS | 30.12.2020 | ||
| SE | 30.12.2020 | ||
| SI | 30.12.2020 | ||
| SK | 30.12.2020 | ||
| BG | 30.03.2021 | ||
| NO | 30.03.2021 | ||
| GR | 31.03.2021 | ||
| IS | 30.04.2021 | ||
| PT | 30.04.2021 | ||
| LU | 01.07.2021 | ||
| BE | 31.07.2021 | ||
| Former [2022/23] | AL | 30.12.2020 | |
| CZ | 30.12.2020 | ||
| DK | 30.12.2020 | ||
| EE | 30.12.2020 | ||
| FI | 30.12.2020 | ||
| HR | 30.12.2020 | ||
| IT | 30.12.2020 | ||
| LT | 30.12.2020 | ||
| LV | 30.12.2020 | ||
| MC | 30.12.2020 | ||
| PL | 30.12.2020 | ||
| RO | 30.12.2020 | ||
| RS | 30.12.2020 | ||
| SE | 30.12.2020 | ||
| SI | 30.12.2020 | ||
| SK | 30.12.2020 | ||
| BG | 30.03.2021 | ||
| NO | 30.03.2021 | ||
| GR | 31.03.2021 | ||
| IS | 30.04.2021 | ||
| PT | 30.04.2021 | ||
| LU | 01.07.2021 | ||
| Former [2022/18] | AL | 30.12.2020 | |
| CZ | 30.12.2020 | ||
| DK | 30.12.2020 | ||
| EE | 30.12.2020 | ||
| FI | 30.12.2020 | ||
| HR | 30.12.2020 | ||
| IT | 30.12.2020 | ||
| LT | 30.12.2020 | ||
| LV | 30.12.2020 | ||
| MC | 30.12.2020 | ||
| PL | 30.12.2020 | ||
| RO | 30.12.2020 | ||
| RS | 30.12.2020 | ||
| SE | 30.12.2020 | ||
| SI | 30.12.2020 | ||
| SK | 30.12.2020 | ||
| BG | 30.03.2021 | ||
| NO | 30.03.2021 | ||
| GR | 31.03.2021 | ||
| PT | 30.04.2021 | ||
| Former [2022/13] | AL | 30.12.2020 | |
| CZ | 30.12.2020 | ||
| DK | 30.12.2020 | ||
| EE | 30.12.2020 | ||
| FI | 30.12.2020 | ||
| HR | 30.12.2020 | ||
| IT | 30.12.2020 | ||
| LT | 30.12.2020 | ||
| LV | 30.12.2020 | ||
| PL | 30.12.2020 | ||
| RO | 30.12.2020 | ||
| RS | 30.12.2020 | ||
| SE | 30.12.2020 | ||
| SI | 30.12.2020 | ||
| SK | 30.12.2020 | ||
| BG | 30.03.2021 | ||
| NO | 30.03.2021 | ||
| GR | 31.03.2021 | ||
| PT | 30.04.2021 | ||
| Former [2022/10] | AL | 30.12.2020 | |
| CZ | 30.12.2020 | ||
| DK | 30.12.2020 | ||
| EE | 30.12.2020 | ||
| FI | 30.12.2020 | ||
| HR | 30.12.2020 | ||
| IT | 30.12.2020 | ||
| LT | 30.12.2020 | ||
| LV | 30.12.2020 | ||
| PL | 30.12.2020 | ||
| RO | 30.12.2020 | ||
| RS | 30.12.2020 | ||
| SE | 30.12.2020 | ||
| SK | 30.12.2020 | ||
| BG | 30.03.2021 | ||
| NO | 30.03.2021 | ||
| GR | 31.03.2021 | ||
| PT | 30.04.2021 | ||
| Former [2021/49] | AL | 30.12.2020 | |
| CZ | 30.12.2020 | ||
| DK | 30.12.2020 | ||
| EE | 30.12.2020 | ||
| FI | 30.12.2020 | ||
| HR | 30.12.2020 | ||
| IT | 30.12.2020 | ||
| LT | 30.12.2020 | ||
| LV | 30.12.2020 | ||
| PL | 30.12.2020 | ||
| RO | 30.12.2020 | ||
| RS | 30.12.2020 | ||
| SE | 30.12.2020 | ||
| SK | 30.12.2020 | ||
| BG | 30.03.2021 | ||
| NO | 30.03.2021 | ||
| GR | 31.03.2021 | ||
| IS | 30.04.2021 | ||
| PT | 30.04.2021 | ||
| Former [2021/48] | AL | 30.12.2020 | |
| CZ | 30.12.2020 | ||
| EE | 30.12.2020 | ||
| FI | 30.12.2020 | ||
| HR | 30.12.2020 | ||
| IT | 30.12.2020 | ||
| LT | 30.12.2020 | ||
| LV | 30.12.2020 | ||
| PL | 30.12.2020 | ||
| RO | 30.12.2020 | ||
| RS | 30.12.2020 | ||
| SE | 30.12.2020 | ||
| SK | 30.12.2020 | ||
| BG | 30.03.2021 | ||
| NO | 30.03.2021 | ||
| GR | 31.03.2021 | ||
| IS | 30.04.2021 | ||
| PT | 30.04.2021 | ||
| Former [2021/45] | AL | 30.12.2020 | |
| CZ | 30.12.2020 | ||
| EE | 30.12.2020 | ||
| FI | 30.12.2020 | ||
| HR | 30.12.2020 | ||
| LT | 30.12.2020 | ||
| LV | 30.12.2020 | ||
| PL | 30.12.2020 | ||
| RO | 30.12.2020 | ||
| RS | 30.12.2020 | ||
| SE | 30.12.2020 | ||
| SK | 30.12.2020 | ||
| BG | 30.03.2021 | ||
| NO | 30.03.2021 | ||
| GR | 31.03.2021 | ||
| IS | 30.04.2021 | ||
| PT | 30.04.2021 | ||
| Former [2021/42] | CZ | 30.12.2020 | |
| EE | 30.12.2020 | ||
| FI | 30.12.2020 | ||
| HR | 30.12.2020 | ||
| LT | 30.12.2020 | ||
| LV | 30.12.2020 | ||
| PL | 30.12.2020 | ||
| RO | 30.12.2020 | ||
| RS | 30.12.2020 | ||
| SE | 30.12.2020 | ||
| SK | 30.12.2020 | ||
| BG | 30.03.2021 | ||
| NO | 30.03.2021 | ||
| GR | 31.03.2021 | ||
| IS | 30.04.2021 | ||
| PT | 30.04.2021 | ||
| Former [2021/39] | CZ | 30.12.2020 | |
| EE | 30.12.2020 | ||
| FI | 30.12.2020 | ||
| HR | 30.12.2020 | ||
| LT | 30.12.2020 | ||
| LV | 30.12.2020 | ||
| PL | 30.12.2020 | ||
| RO | 30.12.2020 | ||
| RS | 30.12.2020 | ||
| SE | 30.12.2020 | ||
| SK | 30.12.2020 | ||
| BG | 30.03.2021 | ||
| NO | 30.03.2021 | ||
| GR | 31.03.2021 | ||
| PT | 30.04.2021 | ||
| Former [2021/36] | CZ | 30.12.2020 | |
| EE | 30.12.2020 | ||
| FI | 30.12.2020 | ||
| HR | 30.12.2020 | ||
| LT | 30.12.2020 | ||
| LV | 30.12.2020 | ||
| RO | 30.12.2020 | ||
| RS | 30.12.2020 | ||
| SE | 30.12.2020 | ||
| SK | 30.12.2020 | ||
| BG | 30.03.2021 | ||
| NO | 30.03.2021 | ||
| GR | 31.03.2021 | ||
| PT | 30.04.2021 | ||
| Former [2021/35] | CZ | 30.12.2020 | |
| FI | 30.12.2020 | ||
| HR | 30.12.2020 | ||
| LT | 30.12.2020 | ||
| LV | 30.12.2020 | ||
| RO | 30.12.2020 | ||
| RS | 30.12.2020 | ||
| SE | 30.12.2020 | ||
| SK | 30.12.2020 | ||
| BG | 30.03.2021 | ||
| NO | 30.03.2021 | ||
| GR | 31.03.2021 | ||
| PT | 30.04.2021 | ||
| Former [2021/33] | FI | 30.12.2020 | |
| HR | 30.12.2020 | ||
| LT | 30.12.2020 | ||
| LV | 30.12.2020 | ||
| RS | 30.12.2020 | ||
| SE | 30.12.2020 | ||
| BG | 30.03.2021 | ||
| NO | 30.03.2021 | ||
| GR | 31.03.2021 | ||
| PT | 30.04.2021 | ||
| Former [2021/28] | FI | 30.12.2020 | |
| HR | 30.12.2020 | ||
| LV | 30.12.2020 | ||
| RS | 30.12.2020 | ||
| SE | 30.12.2020 | ||
| BG | 30.03.2021 | ||
| NO | 30.03.2021 | ||
| GR | 31.03.2021 | ||
| Former [2021/23] | FI | 30.12.2020 | |
| LV | 30.12.2020 | ||
| RS | 30.12.2020 | ||
| SE | 30.12.2020 | ||
| BG | 30.03.2021 | ||
| NO | 30.03.2021 | ||
| GR | 31.03.2021 | ||
| Former [2021/22] | FI | 30.12.2020 | |
| RS | 30.12.2020 | ||
| NO | 30.03.2021 | ||
| Former [2021/20] | FI | 30.12.2020 | Documents cited: | Search | [AD] WO2018007111 (HUSQVARNA AB et al.) | [A] EP0887005 (HONDA MOTOR CO LTD et al.) | [A] EP3106565 (CHERVON HK LTD et al.) | [A] US5732867 (PERKINS RICHARD W et al.) | [A] US5954250 (HALL MAURICE VAN et al.) | [A] WO2009157881 (OZTEK TEKSTIL TERBIYE TESISLER et al.) | by applicant | US2016345714 | WO2018007111 | DE202012013284 | DE202013011447 | EP2819207 | DE102015002724 | EP18194901 |