blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3607816

EP3607816 - ASSEMBLY FOR ROOF GREENING [Right-click to bookmark this link]
Former [2020/07]WATER RETENTION ELEMENT AND ASSEMBLY FOR ROOF GREENING
[2022/38]
StatusNo opposition filed within time limit
Status updated on  12.04.2024
Database last updated on 21.08.2024
FormerThe patent has been granted
Status updated on  05.05.2023
FormerGrant of patent is intended
Status updated on  02.09.2022
FormerExamination is in progress
Status updated on  26.02.2021
FormerRequest for examination was made
Status updated on  17.07.2020
FormerThe application has been published
Status updated on  10.01.2020
Most recent event   Tooltip12.07.2024Lapse of the patent in a contracting state
New state(s): IE
published on 14.08.2024  [2024/33]
Applicant(s)For all designated states
Paul Bauder GmbH & Co. KG
Korntaler Landstrasse 63
70499 Stuttgart / DE
[2020/07]
Inventor(s)01 / Bauder, Tim
Florian-Geyer-Str. 40
70499 Stuttgart / DE
02 / Ruttensperger, Stefan
Breitenstr. 14
71296 Heimsheim / DE
 [2020/07]
Representative(s)Hoeger, Stellrecht & Partner Patentanwälte mbB
Uhlandstrasse 14c
70182 Stuttgart / DE
[2020/07]
Application number, filing date19184169.103.07.2019
[2020/07]
Priority number, dateDE20181011917507.08.2018         Original published format: DE102018119175
[2020/07]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report 
No.:EP3607816
Date:12.02.2020
Language:DE
[2020/07]
Type: B1 Patent specification 
No.:EP3607816
Date:07.06.2023
Language:DE
[2023/23]
Search report(s)(Supplementary) European search report - dispatched on:EP19.12.2019
ClassificationIPC:A01G9/033, E04D11/00
[2020/07]
CPC:
E04D11/002 (EP); A01G9/033 (EP); Y02A30/254 (EP);
Y02B80/32 (EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/34]  
Former [2020/07]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:ANORDNUNG FÜR EINE DACHBEGRÜNUNG[2022/38]
English:ASSEMBLY FOR ROOF GREENING[2022/38]
French:DISPOSITIF POUR UNE TOITURE VÉGÉTALE[2022/38]
Former [2020/07]WASSERRETENTIONSELEMENT UND ANORDNUNG FÜR EINE DACHBEGRÜNUNG
Former [2020/07]WATER RETENTION ELEMENT AND ASSEMBLY FOR ROOF GREENING
Former [2020/07]ÉLÉMENT DE RÉTENTION D'EAU ET DISPOSITIF POUR UNE TOITURE VÉGÉTALE
Examination procedure13.07.2020Amendment by applicant (claims and/or description)
13.07.2020Examination requested  [2020/34]
13.07.2020Date on which the examining division has become responsible
25.02.2021Despatch of a communication from the examining division (Time limit: M04)
23.06.2021Reply to a communication from the examining division
08.10.2021Despatch of a communication from the examining division (Time limit: M04)
10.02.2022Reply to a communication from the examining division
02.09.2022Communication of intention to grant the patent
05.01.2023Fee for grant paid
05.01.2023Fee for publishing/printing paid
05.01.2023Receipt of the translation of the claim(s)
Opposition(s)08.03.2024No opposition filed within time limit [2024/20]
Fees paidRenewal fee
28.07.2021Renewal fee patent year 03
27.07.2022Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipCZ07.06.2023
ES07.06.2023
HR07.06.2023
MC07.06.2023
PL07.06.2023
RO07.06.2023
RS07.06.2023
SK07.06.2023
SM07.06.2023
IE03.07.2023
GR08.09.2023
IS07.10.2023
[2024/33]
Former [2024/16]CZ07.06.2023
ES07.06.2023
HR07.06.2023
MC07.06.2023
PL07.06.2023
RO07.06.2023
RS07.06.2023
SK07.06.2023
SM07.06.2023
GR08.09.2023
IS07.10.2023
Former [2024/10]CZ07.06.2023
ES07.06.2023
HR07.06.2023
PL07.06.2023
RO07.06.2023
RS07.06.2023
SK07.06.2023
SM07.06.2023
GR08.09.2023
IS07.10.2023
Former [2024/09]CZ07.06.2023
ES07.06.2023
HR07.06.2023
RS07.06.2023
SK07.06.2023
SM07.06.2023
GR08.09.2023
IS07.10.2023
Former [2024/08]ES07.06.2023
HR07.06.2023
RS07.06.2023
SK07.06.2023
SM07.06.2023
GR08.09.2023
Former [2023/51]ES07.06.2023
HR07.06.2023
RS07.06.2023
GR08.09.2023
Former [2023/50]ES07.06.2023
GR08.09.2023
Former [2023/46]ES07.06.2023
Documents cited:Search[A]DE3712867  (RIECO BEGRUENUNGSSYSTEME GMBH [DE]) [A] 7* figure 1; claim 7 *;
 [A]FR2703213  (SMAC ACIEROID [FR]) [A] 7 * figure 1 *;
 [X]US5383314  (ROTHBERG HENRY M [US]) [X] 1-15 * figure 4 *;
 [X]JPH1175568  (KYODO KY TEC KK) [X] 1-15 * figures 26a-b *;
 [X]DE19750277  (GUTJAHR WALTER [DE]) [X] 1-15 * figures 1-2 *;
 [X]DE10111413  (GEFINEX GMBH [DE]) [X] 1-15 * paragraphs [0037] - [0039]; figures 1, 4 *;
 [X]GB2484739  (G LTD AB [GB]) [X] 1-15 * page 1, lines 19-22; figures 1-4 * * page 5, line 9 *;
 [X]EP2681989  (LARSEN AS [DK]) [X] 1-15 * column 1, lines 21-22; figures 1-3; claim 9 *;
 [X]WO2017003373  (LIM JEE KENG [SG]) [X] 1-15 * figures 1-6c *
Examination   - Bauder, "Gründach-Systeme Produktübersicht", (20130801), pages 1 - 20, URL: http://www.digdach.at/assets/downloads/Bauder-Gründach_Produktübersicht_0813_DE.pdf, (20210218), XP055777684
    - ZinCo, "Floradrain FD40", ZinCo GmbH - Produktdatenblatt, (20170401), URL: https://www.zinco.de/sites/default/files/products/data_sheets/2017-04/ZinCo_PDB_Floradrain_FD40.pdf, (20200826), XP055725303
by applicantDE19852561
 DE10330318
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.