| EP3624415 - A DECENTRALIZED ASSET CUSTODY AND CLEARING PLATFORM SYSTEM [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 15.07.2022 Database last updated on 09.04.2026 | |
| Former | The patent has been granted Status updated on 06.08.2021 | ||
| Former | Grant of patent is intended Status updated on 16.03.2021 | ||
| Former | Request for examination was made Status updated on 11.09.2020 | ||
| Former | The application has been published Status updated on 14.02.2020 | Most recent event Tooltip | 27.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 30.10.2024 [2024/44] | Applicant(s) | For all designated states Blue Helix Room 11191, 11th Floor, A Block Dong San Huan Bei Road Xiaguangli 18 Chagoyang District Beijing / CN | [2021/36] |
| Former [2020/12] | For all designated states Blue Helix Room 11191, 11th Floor, A Block Dong San Huan Bei Road Xiaguangli 18 Chagoyang District Beijing / CN | Inventor(s) | 01 /
JU, Jianhua Room 11191, 11th Floor, A Block Dong San Huan Bei Road Chaoyang District, Beijing Xiaguangli 18 / CN | 02 /
TANG, Fulin Room 11191, 11th Floor, A Block Dong San Huan Bei Road Chaoyang District, Beijing Xiaguangli 18 / CN | 03 /
LIN, Yuqi Room 11191, 11th Floor, A Block Dong San Huan Bei Road Chaoyang District, Beijing Xiaguangli 18 / CN | 04 /
WANG, Boli Room 11191, 11th Floor, A Block Dong San Huan Bei Road Chaoyang District, Beijing Xiaguangli 18 / CN | [2020/12] | Representative(s) | MacDougall, Alan John Shaw, et al Mathys & Squire The Shard 32 London Bridge Street London SE1 9SG / GB | [2021/36] |
| Former [2020/12] | Strachan, Victoria Jane, et al Mathys & Squire LLP The Shard 32 London Bridge Street London SE1 9SG / GB | Application number, filing date | 19184783.9 | 05.07.2019 | [2020/12] | Priority number, date | CN20181155383 | 11.09.2018 Original published format: CN201811055383 | [2020/12] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3624415 | Date: | 18.03.2020 | Language: | EN | [2020/12] | Type: | B1 Patent specification | No.: | EP3624415 | Date: | 08.09.2021 | Language: | EN | [2021/36] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 06.02.2020 | Classification | IPC: | H04L29/06, H04L9/32 | [2021/14] | CPC: |
G06Q40/04 (EP,CN,US);
G06Q40/12 (CN);
G06Q20/389 (US);
H04L63/08 (EP);
H04L63/10 (EP);
H04L9/3239 (EP);
|
| Former IPC [2020/12] | H04L29/06 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/42] |
| Former [2020/12] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | DEZENTRALISIERTES VERMÖGENSBEWAHRUNGS- UND -VERRECHNUNGSPLATTFORMSYSTEM | [2020/12] | English: | A DECENTRALIZED ASSET CUSTODY AND CLEARING PLATFORM SYSTEM | [2020/12] | French: | CONSERVATION DÉCENTRALISÉE D'ACTIFS ET SYSTÈME DE PLATEFORME DE COMPENSATION | [2020/12] | Examination procedure | 04.09.2020 | Amendment by applicant (claims and/or description) | 04.09.2020 | Examination requested [2020/42] | 04.09.2020 | Date on which the examining division has become responsible | 17.03.2021 | Communication of intention to grant the patent | 14.07.2021 | Fee for grant paid | 14.07.2021 | Fee for publishing/printing paid | 14.07.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 09.06.2022 | No opposition filed within time limit [2022/33] | Fees paid | Renewal fee | 28.07.2021 | Renewal fee patent year 03 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 05.07.2019 | AL | 08.09.2021 | AT | 08.09.2021 | CY | 08.09.2021 | CZ | 08.09.2021 | DK | 08.09.2021 | EE | 08.09.2021 | FI | 08.09.2021 | HR | 08.09.2021 | LT | 08.09.2021 | LV | 08.09.2021 | MC | 08.09.2021 | MK | 08.09.2021 | MT | 08.09.2021 | NL | 08.09.2021 | PL | 08.09.2021 | RO | 08.09.2021 | RS | 08.09.2021 | SE | 08.09.2021 | SI | 08.09.2021 | SK | 08.09.2021 | SM | 08.09.2021 | TR | 08.09.2021 | BG | 08.12.2021 | NO | 08.12.2021 | GR | 09.12.2021 | IS | 08.01.2022 | PT | 10.01.2022 | [2024/44] |
| Former [2024/29] | HU | 05.07.2019 | |
| AL | 08.09.2021 | ||
| AT | 08.09.2021 | ||
| CY | 08.09.2021 | ||
| CZ | 08.09.2021 | ||
| DK | 08.09.2021 | ||
| EE | 08.09.2021 | ||
| FI | 08.09.2021 | ||
| HR | 08.09.2021 | ||
| LT | 08.09.2021 | ||
| LV | 08.09.2021 | ||
| MC | 08.09.2021 | ||
| MK | 08.09.2021 | ||
| NL | 08.09.2021 | ||
| PL | 08.09.2021 | ||
| RO | 08.09.2021 | ||
| RS | 08.09.2021 | ||
| SE | 08.09.2021 | ||
| SI | 08.09.2021 | ||
| SK | 08.09.2021 | ||
| SM | 08.09.2021 | ||
| TR | 08.09.2021 | ||
| BG | 08.12.2021 | ||
| NO | 08.12.2021 | ||
| GR | 09.12.2021 | ||
| IS | 08.01.2022 | ||
| PT | 10.01.2022 | ||
| Former [2024/23] | HU | 05.07.2019 | |
| AL | 08.09.2021 | ||
| AT | 08.09.2021 | ||
| CY | 08.09.2021 | ||
| CZ | 08.09.2021 | ||
| DK | 08.09.2021 | ||
| EE | 08.09.2021 | ||
| FI | 08.09.2021 | ||
| HR | 08.09.2021 | ||
| LT | 08.09.2021 | ||
| LV | 08.09.2021 | ||
| MC | 08.09.2021 | ||
| MK | 08.09.2021 | ||
| NL | 08.09.2021 | ||
| PL | 08.09.2021 | ||
| RO | 08.09.2021 | ||
| RS | 08.09.2021 | ||
| SE | 08.09.2021 | ||
| SI | 08.09.2021 | ||
| SK | 08.09.2021 | ||
| SM | 08.09.2021 | ||
| BG | 08.12.2021 | ||
| NO | 08.12.2021 | ||
| GR | 09.12.2021 | ||
| IS | 08.01.2022 | ||
| PT | 10.01.2022 | ||
| Former [2024/20] | HU | 05.07.2019 | |
| AL | 08.09.2021 | ||
| AT | 08.09.2021 | ||
| CY | 08.09.2021 | ||
| CZ | 08.09.2021 | ||
| DK | 08.09.2021 | ||
| EE | 08.09.2021 | ||
| FI | 08.09.2021 | ||
| HR | 08.09.2021 | ||
| LT | 08.09.2021 | ||
| LV | 08.09.2021 | ||
| MC | 08.09.2021 | ||
| NL | 08.09.2021 | ||
| PL | 08.09.2021 | ||
| RO | 08.09.2021 | ||
| RS | 08.09.2021 | ||
| SE | 08.09.2021 | ||
| SI | 08.09.2021 | ||
| SK | 08.09.2021 | ||
| SM | 08.09.2021 | ||
| BG | 08.12.2021 | ||
| NO | 08.12.2021 | ||
| GR | 09.12.2021 | ||
| IS | 08.01.2022 | ||
| PT | 10.01.2022 | ||
| Former [2024/18] | HU | 05.07.2019 | |
| AL | 08.09.2021 | ||
| AT | 08.09.2021 | ||
| CZ | 08.09.2021 | ||
| DK | 08.09.2021 | ||
| EE | 08.09.2021 | ||
| FI | 08.09.2021 | ||
| HR | 08.09.2021 | ||
| LT | 08.09.2021 | ||
| LV | 08.09.2021 | ||
| MC | 08.09.2021 | ||
| NL | 08.09.2021 | ||
| PL | 08.09.2021 | ||
| RO | 08.09.2021 | ||
| RS | 08.09.2021 | ||
| SE | 08.09.2021 | ||
| SI | 08.09.2021 | ||
| SK | 08.09.2021 | ||
| SM | 08.09.2021 | ||
| BG | 08.12.2021 | ||
| NO | 08.12.2021 | ||
| GR | 09.12.2021 | ||
| IS | 08.01.2022 | ||
| PT | 10.01.2022 | ||
| Former [2023/11] | AL | 08.09.2021 | |
| AT | 08.09.2021 | ||
| CZ | 08.09.2021 | ||
| DK | 08.09.2021 | ||
| EE | 08.09.2021 | ||
| FI | 08.09.2021 | ||
| HR | 08.09.2021 | ||
| LT | 08.09.2021 | ||
| LV | 08.09.2021 | ||
| MC | 08.09.2021 | ||
| NL | 08.09.2021 | ||
| PL | 08.09.2021 | ||
| RO | 08.09.2021 | ||
| RS | 08.09.2021 | ||
| SE | 08.09.2021 | ||
| SI | 08.09.2021 | ||
| SK | 08.09.2021 | ||
| SM | 08.09.2021 | ||
| BG | 08.12.2021 | ||
| NO | 08.12.2021 | ||
| GR | 09.12.2021 | ||
| IS | 08.01.2022 | ||
| PT | 10.01.2022 | ||
| Former [2022/36] | AL | 08.09.2021 | |
| AT | 08.09.2021 | ||
| CZ | 08.09.2021 | ||
| DK | 08.09.2021 | ||
| EE | 08.09.2021 | ||
| FI | 08.09.2021 | ||
| HR | 08.09.2021 | ||
| LT | 08.09.2021 | ||
| LV | 08.09.2021 | ||
| NL | 08.09.2021 | ||
| PL | 08.09.2021 | ||
| RO | 08.09.2021 | ||
| RS | 08.09.2021 | ||
| SE | 08.09.2021 | ||
| SI | 08.09.2021 | ||
| SK | 08.09.2021 | ||
| SM | 08.09.2021 | ||
| BG | 08.12.2021 | ||
| NO | 08.12.2021 | ||
| GR | 09.12.2021 | ||
| IS | 08.01.2022 | ||
| PT | 10.01.2022 | ||
| Former [2022/29] | AL | 08.09.2021 | |
| AT | 08.09.2021 | ||
| CZ | 08.09.2021 | ||
| EE | 08.09.2021 | ||
| FI | 08.09.2021 | ||
| HR | 08.09.2021 | ||
| LT | 08.09.2021 | ||
| LV | 08.09.2021 | ||
| NL | 08.09.2021 | ||
| PL | 08.09.2021 | ||
| RO | 08.09.2021 | ||
| RS | 08.09.2021 | ||
| SE | 08.09.2021 | ||
| SK | 08.09.2021 | ||
| SM | 08.09.2021 | ||
| BG | 08.12.2021 | ||
| NO | 08.12.2021 | ||
| GR | 09.12.2021 | ||
| IS | 08.01.2022 | ||
| PT | 10.01.2022 | ||
| Former [2022/25] | AT | 08.09.2021 | |
| CZ | 08.09.2021 | ||
| EE | 08.09.2021 | ||
| FI | 08.09.2021 | ||
| HR | 08.09.2021 | ||
| LT | 08.09.2021 | ||
| LV | 08.09.2021 | ||
| NL | 08.09.2021 | ||
| PL | 08.09.2021 | ||
| RO | 08.09.2021 | ||
| RS | 08.09.2021 | ||
| SE | 08.09.2021 | ||
| SK | 08.09.2021 | ||
| SM | 08.09.2021 | ||
| BG | 08.12.2021 | ||
| NO | 08.12.2021 | ||
| GR | 09.12.2021 | ||
| IS | 08.01.2022 | ||
| PT | 10.01.2022 | ||
| Former [2022/24] | AT | 08.09.2021 | |
| CZ | 08.09.2021 | ||
| EE | 08.09.2021 | ||
| FI | 08.09.2021 | ||
| HR | 08.09.2021 | ||
| LT | 08.09.2021 | ||
| LV | 08.09.2021 | ||
| NL | 08.09.2021 | ||
| PL | 08.09.2021 | ||
| RO | 08.09.2021 | ||
| RS | 08.09.2021 | ||
| SE | 08.09.2021 | ||
| SK | 08.09.2021 | ||
| BG | 08.12.2021 | ||
| NO | 08.12.2021 | ||
| GR | 09.12.2021 | ||
| IS | 08.01.2022 | ||
| PT | 10.01.2022 | ||
| Former [2022/23] | AT | 08.09.2021 | |
| CZ | 08.09.2021 | ||
| EE | 08.09.2021 | ||
| FI | 08.09.2021 | ||
| HR | 08.09.2021 | ||
| LT | 08.09.2021 | ||
| LV | 08.09.2021 | ||
| PL | 08.09.2021 | ||
| RS | 08.09.2021 | ||
| SE | 08.09.2021 | ||
| SK | 08.09.2021 | ||
| BG | 08.12.2021 | ||
| NO | 08.12.2021 | ||
| GR | 09.12.2021 | ||
| PT | 10.01.2022 | ||
| Former [2022/21] | AT | 08.09.2021 | |
| FI | 08.09.2021 | ||
| HR | 08.09.2021 | ||
| LT | 08.09.2021 | ||
| LV | 08.09.2021 | ||
| RS | 08.09.2021 | ||
| SE | 08.09.2021 | ||
| BG | 08.12.2021 | ||
| NO | 08.12.2021 | ||
| GR | 09.12.2021 | ||
| Former [2022/10] | FI | 08.09.2021 | |
| HR | 08.09.2021 | ||
| LT | 08.09.2021 | ||
| LV | 08.09.2021 | ||
| RS | 08.09.2021 | ||
| SE | 08.09.2021 | ||
| BG | 08.12.2021 | ||
| NO | 08.12.2021 | ||
| GR | 09.12.2021 | ||
| Former [2022/09] | FI | 08.09.2021 | |
| LT | 08.09.2021 | ||
| RS | 08.09.2021 | ||
| SE | 08.09.2021 | ||
| BG | 08.12.2021 | ||
| NO | 08.12.2021 | ||
| Former [2022/08] | FI | 08.09.2021 | |
| LT | 08.09.2021 | ||
| SE | 08.09.2021 | ||
| BG | 08.12.2021 | ||
| NO | 08.12.2021 | ||
| Former [2022/07] | LT | 08.09.2021 | |
| NO | 08.12.2021 | Documents cited: | Search | [XI] CN106228446 (BEIJING PEERSAFE TECH CO LTD et al.) [X] 1-4,15 * paragraphs [0011] - [0015] - [0 40] - [0056]; figures 1, 2; claim 1 *[I] 5-14 | [Y] US2016224949 (THOMAS STEFAN et al.) [Y] 1-15 * paragraphs [0014] - [0016]; figures 2-5 * | [Y] US2018089041 (SMITH NED M et al.) [Y] 1-15 * paragraphs [0012] - [0016] - [0 45] - [0048]; figures 5-6 * |