blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3772141

EP3772141 - RF CONNECTOR ELEMENTS AND RF CONNECTOR SYSTEM [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  16.06.2023
Database last updated on 12.07.2024
FormerThe patent has been granted
Status updated on  08.07.2022
FormerGrant of patent is intended
Status updated on  20.04.2022
FormerRequest for examination was made
Status updated on  23.04.2021
FormerThe application has been published
Status updated on  01.01.2021
Most recent event   Tooltip24.05.2024Lapse of the patent in a contracting state
New state(s): IT
published on 26.06.2024  [2024/26]
Applicant(s)For all designated states
TE Connectivity Germany GmbH
Ampèrestraße 12-14
64625 Bensheim / DE
For all designated states
TE Connectivity Corporation
1050 Westlakes Drive
Berwyn, PA 19312 / US
[2021/05]
Inventor(s)01 / NIKFAL, Mohammad
Robert Bosch Str. 4
64293 Darmstadt / DE
02 / MANDEL, Christian
Boecklerstrasse 8
64291 Darmstadt / DE
03 / YUN, Hyo Chang
774 Sunset Glen Dr.
San Jose, CA California 95123 / US
04 / KIDANE, Abiel
Gertrud-Baeumer-Str. 51
68169 Mannheim / DE
 [2021/05]
Representative(s)Grünecker Patent- und Rechtsanwälte PartG mbB
Leopoldstraße 4
80802 München / DE
[2021/05]
Application number, filing date19189826.102.08.2019
[2021/05]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3772141
Date:03.02.2021
Language:EN
[2021/05]
Type: B1 Patent specification 
No.:EP3772141
Date:10.08.2022
Language:EN
[2022/32]
Search report(s)(Supplementary) European search report - dispatched on:EP07.02.2020
ClassificationIPC:H01R13/6477, H01R13/405, H01R24/44, H01R24/60
[2021/05]
CPC:
H01R13/6477 (EP,CN); H01R9/0503 (BR); H01R13/40 (CN);
H01R24/40 (US); H01B11/18 (BR); H01R13/02 (CN);
H01R24/38 (BR); H01R24/44 (EP,CN); H01R13/405 (EP);
H01R2103/00 (US); H01R2201/26 (CN); H01R24/60 (EP) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2021/21]
Former [2021/05]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:HF-VERBINDERELEMENTE UND HF-VERBINDERSYSTEM[2021/05]
English:RF CONNECTOR ELEMENTS AND RF CONNECTOR SYSTEM[2021/05]
French:ÉLÉMENTS ET SYSTÈME DE CONNECTEUR RF[2021/05]
Examination procedure16.04.2021Amendment by applicant (claims and/or description)
16.04.2021Examination requested  [2021/21]
16.04.2021Date on which the examining division has become responsible
21.04.2022Communication of intention to grant the patent
29.06.2022Fee for grant paid
29.06.2022Fee for publishing/printing paid
29.06.2022Receipt of the translation of the claim(s)
Opposition(s)11.05.2023No opposition filed within time limit [2023/29]
Fees paidRenewal fee
13.08.2021Renewal fee patent year 03
15.06.2022Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipAL10.08.2022
AT10.08.2022
CZ10.08.2022
DK10.08.2022
EE10.08.2022
ES10.08.2022
FI10.08.2022
HR10.08.2022
IT10.08.2022
LT10.08.2022
LV10.08.2022
MC10.08.2022
NL10.08.2022
PL10.08.2022
RO10.08.2022
RS10.08.2022
SE10.08.2022
SI10.08.2022
SK10.08.2022
SM10.08.2022
NO10.11.2022
GR11.11.2022
IS10.12.2022
PT12.12.2022
[2024/26]
Former [2024/16]AL10.08.2022
AT10.08.2022
CZ10.08.2022
DK10.08.2022
EE10.08.2022
ES10.08.2022
FI10.08.2022
HR10.08.2022
LT10.08.2022
LV10.08.2022
MC10.08.2022
NL10.08.2022
PL10.08.2022
RO10.08.2022
RS10.08.2022
SE10.08.2022
SI10.08.2022
SK10.08.2022
SM10.08.2022
NO10.11.2022
GR11.11.2022
IS10.12.2022
PT12.12.2022
Former [2023/37]AL10.08.2022
AT10.08.2022
CZ10.08.2022
DK10.08.2022
EE10.08.2022
ES10.08.2022
FI10.08.2022
HR10.08.2022
LT10.08.2022
LV10.08.2022
NL10.08.2022
PL10.08.2022
RO10.08.2022
RS10.08.2022
SE10.08.2022
SI10.08.2022
SK10.08.2022
SM10.08.2022
NO10.11.2022
GR11.11.2022
IS10.12.2022
PT12.12.2022
Former [2023/29]AL10.08.2022
AT10.08.2022
CZ10.08.2022
DK10.08.2022
EE10.08.2022
ES10.08.2022
FI10.08.2022
HR10.08.2022
LT10.08.2022
LV10.08.2022
NL10.08.2022
PL10.08.2022
RO10.08.2022
RS10.08.2022
SE10.08.2022
SK10.08.2022
SM10.08.2022
NO10.11.2022
GR11.11.2022
IS10.12.2022
PT12.12.2022
Former [2023/23]AT10.08.2022
CZ10.08.2022
DK10.08.2022
EE10.08.2022
ES10.08.2022
FI10.08.2022
HR10.08.2022
LT10.08.2022
LV10.08.2022
NL10.08.2022
PL10.08.2022
RO10.08.2022
RS10.08.2022
SE10.08.2022
SK10.08.2022
SM10.08.2022
NO10.11.2022
GR11.11.2022
IS10.12.2022
PT12.12.2022
Former [2023/22]AT10.08.2022
CZ10.08.2022
DK10.08.2022
ES10.08.2022
FI10.08.2022
HR10.08.2022
LT10.08.2022
LV10.08.2022
NL10.08.2022
PL10.08.2022
RO10.08.2022
RS10.08.2022
SE10.08.2022
SM10.08.2022
NO10.11.2022
GR11.11.2022
IS10.12.2022
PT12.12.2022
Former [2023/21]DK10.08.2022
FI10.08.2022
HR10.08.2022
LT10.08.2022
LV10.08.2022
NL10.08.2022
PL10.08.2022
RS10.08.2022
SE10.08.2022
SM10.08.2022
NO10.11.2022
GR11.11.2022
IS10.12.2022
PT12.12.2022
Former [2023/20]FI10.08.2022
HR10.08.2022
LT10.08.2022
LV10.08.2022
NL10.08.2022
PL10.08.2022
RS10.08.2022
SE10.08.2022
SM10.08.2022
NO10.11.2022
GR11.11.2022
IS10.12.2022
PT12.12.2022
Former [2023/12]FI10.08.2022
HR10.08.2022
LT10.08.2022
LV10.08.2022
NL10.08.2022
PL10.08.2022
RS10.08.2022
SE10.08.2022
NO10.11.2022
GR11.11.2022
IS10.12.2022
PT12.12.2022
Former [2023/11]FI10.08.2022
HR10.08.2022
LT10.08.2022
LV10.08.2022
NL10.08.2022
PL10.08.2022
RS10.08.2022
SE10.08.2022
NO10.11.2022
GR11.11.2022
PT12.12.2022
Former [2023/10]FI10.08.2022
HR10.08.2022
LT10.08.2022
LV10.08.2022
NL10.08.2022
RS10.08.2022
SE10.08.2022
NO10.11.2022
GR11.11.2022
PT12.12.2022
Former [2023/09]FI10.08.2022
LT10.08.2022
LV10.08.2022
NL10.08.2022
RS10.08.2022
SE10.08.2022
NO10.11.2022
PT12.12.2022
Former [2023/08]FI10.08.2022
LT10.08.2022
NL10.08.2022
RS10.08.2022
SE10.08.2022
NO10.11.2022
Documents cited:Search[Y]WO2007146157  (CLYATT CLARENCE L III [US]) [Y] 1-15 * page 7, line 22 - page 13, line 20; figure 1 *;
 [Y]US2013102187  (CAMELIO DAVID J [US], et al) [Y] 1-15 * paragraph [0031] - paragraph [0039]; figure 3 *;
 [Y]US2015162696  (MORLEY STEPHEN T [US]) [Y] 1-15 * paragraph [0032] - paragraph [0036]; figure 4 ** paragraph [0003] - paragraph [0006] *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.