blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3627602

EP3627602 - FUEL CELL STACK AND METHOD FOR OPERATING THE SAME [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  18.02.2022
Database last updated on 20.09.2024
FormerThe patent has been granted
Status updated on  12.03.2021
FormerGrant of patent is intended
Status updated on  07.02.2021
FormerRequest for examination was made
Status updated on  02.10.2020
FormerThe application has been published
Status updated on  21.02.2020
Most recent event   Tooltip13.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 16.10.2024 [2024/42]
Applicant(s)For all designated states
Ford Global Technologies, LLC
330 Town Center Drive, Suite 800 South
Dearborn, MI 48126 / US
[2020/13]
Inventor(s)01 / Sponheimer, Arnulf
Fuchsweg 5
70806 Kornwestheim / DE
02 / Strahl, Stephan
Blumenstr. 4
92439 Bodenwöhr / DE
03 / Orozco Santos Coy, Julio
Neuhausstr. 16
52078 Aachen / DE
04 / Löffler, Rolf Lorenz
Ludgerring 3
41569 Rommerskirchen / DE
 [2020/13]
Representative(s)Dörfler, Thomas
Ford-Werke GmbH
Abt. NH/364
Henry-Ford-Strasse 1
50735 Köln / DE
[2020/13]
Application number, filing date19193519.626.08.2019
[2020/13]
Priority number, dateDE20181021589219.09.2018         Original published format: DE102018215892
[2020/13]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report 
No.:EP3627602
Date:25.03.2020
Language:DE
[2020/13]
Type: B1 Patent specification 
No.:EP3627602
Date:14.04.2021
Language:DE
[2021/15]
Search report(s)(Supplementary) European search report - dispatched on:EP17.02.2020
ClassificationIPC:H01M8/04007, H01M8/04119, H01M8/04223
[2020/13]
CPC:
H01M8/04156 (EP,US); H01M8/2465 (CN); H01M8/04007 (EP);
H01M8/04225 (CN); H01M8/04253 (EP,CN,US); H01M8/04268 (EP);
H01M8/04291 (CN,US); H01M8/04302 (CN); H01M8/04828 (CN);
H01M8/04843 (US); H01M8/0485 (CN); H01M8/0662 (US);
H01M8/24 (US); Y02E60/50 (EP) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/45]
Former [2020/13]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:BRENNSTOFFZELLENSTAPEL UND VERFAHREN ZU SEINEM BETRIEB[2020/13]
English:FUEL CELL STACK AND METHOD FOR OPERATING THE SAME[2020/13]
French:EMPILEMENT DE PILES À COMBUSTIBLE ET SON PROCÉDÉ DE FONCTIONNEMENT[2020/13]
Examination procedure25.09.2020Examination requested  [2020/45]
25.09.2020Date on which the examining division has become responsible
08.02.2021Communication of intention to grant the patent
05.03.2021Fee for grant paid
05.03.2021Fee for publishing/printing paid
05.03.2021Receipt of the translation of the claim(s)
Opposition(s)17.01.2022No opposition filed within time limit [2022/12]
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU26.08.2019
AL14.04.2021
CY14.04.2021
CZ14.04.2021
DK14.04.2021
EE14.04.2021
ES14.04.2021
FI14.04.2021
HR14.04.2021
IT14.04.2021
LT14.04.2021
LV14.04.2021
MC14.04.2021
MK14.04.2021
MT14.04.2021
NL14.04.2021
PL14.04.2021
RO14.04.2021
RS14.04.2021
SE14.04.2021
SI14.04.2021
SK14.04.2021
SM14.04.2021
BG14.07.2021
NO14.07.2021
GR15.07.2021
IS14.08.2021
PT16.08.2021
IE26.08.2021
LU26.08.2021
BE31.08.2021
[2024/42]
Former [2024/23]HU26.08.2019
AL14.04.2021
CY14.04.2021
CZ14.04.2021
DK14.04.2021
EE14.04.2021
ES14.04.2021
FI14.04.2021
HR14.04.2021
IT14.04.2021
LT14.04.2021
LV14.04.2021
MC14.04.2021
MK14.04.2021
NL14.04.2021
PL14.04.2021
RO14.04.2021
RS14.04.2021
SE14.04.2021
SI14.04.2021
SK14.04.2021
SM14.04.2021
BG14.07.2021
NO14.07.2021
GR15.07.2021
IS14.08.2021
PT16.08.2021
IE26.08.2021
LU26.08.2021
BE31.08.2021
Former [2023/33]HU26.08.2019
AL14.04.2021
CY14.04.2021
CZ14.04.2021
DK14.04.2021
EE14.04.2021
ES14.04.2021
FI14.04.2021
HR14.04.2021
IT14.04.2021
LT14.04.2021
LV14.04.2021
MC14.04.2021
NL14.04.2021
PL14.04.2021
RO14.04.2021
RS14.04.2021
SE14.04.2021
SI14.04.2021
SK14.04.2021
SM14.04.2021
BG14.07.2021
NO14.07.2021
GR15.07.2021
IS14.08.2021
PT16.08.2021
IE26.08.2021
LU26.08.2021
BE31.08.2021
Former [2023/30]AL14.04.2021
CY14.04.2021
CZ14.04.2021
DK14.04.2021
EE14.04.2021
ES14.04.2021
FI14.04.2021
HR14.04.2021
IT14.04.2021
LT14.04.2021
LV14.04.2021
MC14.04.2021
NL14.04.2021
PL14.04.2021
RO14.04.2021
RS14.04.2021
SE14.04.2021
SI14.04.2021
SK14.04.2021
SM14.04.2021
BG14.07.2021
NO14.07.2021
GR15.07.2021
IS14.08.2021
PT16.08.2021
IE26.08.2021
LU26.08.2021
BE31.08.2021
Former [2022/36]AL14.04.2021
CZ14.04.2021
DK14.04.2021
EE14.04.2021
ES14.04.2021
FI14.04.2021
HR14.04.2021
IT14.04.2021
LT14.04.2021
LV14.04.2021
MC14.04.2021
NL14.04.2021
PL14.04.2021
RO14.04.2021
RS14.04.2021
SE14.04.2021
SI14.04.2021
SK14.04.2021
SM14.04.2021
BG14.07.2021
NO14.07.2021
GR15.07.2021
IS14.08.2021
PT16.08.2021
IE26.08.2021
LU26.08.2021
BE31.08.2021
Former [2022/35]AL14.04.2021
CZ14.04.2021
DK14.04.2021
EE14.04.2021
ES14.04.2021
FI14.04.2021
HR14.04.2021
LT14.04.2021
LV14.04.2021
MC14.04.2021
NL14.04.2021
PL14.04.2021
RO14.04.2021
RS14.04.2021
SE14.04.2021
SI14.04.2021
SK14.04.2021
SM14.04.2021
BG14.07.2021
NO14.07.2021
GR15.07.2021
IS14.08.2021
PT16.08.2021
IE26.08.2021
LU26.08.2021
BE31.08.2021
Former [2022/34]AL14.04.2021
CZ14.04.2021
DK14.04.2021
EE14.04.2021
ES14.04.2021
FI14.04.2021
HR14.04.2021
LT14.04.2021
LV14.04.2021
MC14.04.2021
NL14.04.2021
PL14.04.2021
RO14.04.2021
RS14.04.2021
SE14.04.2021
SI14.04.2021
SK14.04.2021
SM14.04.2021
BG14.07.2021
NO14.07.2021
GR15.07.2021
IS14.08.2021
PT16.08.2021
LU26.08.2021
BE31.08.2021
Former [2022/29]AL14.04.2021
CZ14.04.2021
DK14.04.2021
EE14.04.2021
ES14.04.2021
FI14.04.2021
HR14.04.2021
LT14.04.2021
LV14.04.2021
MC14.04.2021
NL14.04.2021
PL14.04.2021
RO14.04.2021
RS14.04.2021
SE14.04.2021
SI14.04.2021
SK14.04.2021
SM14.04.2021
BG14.07.2021
NO14.07.2021
GR15.07.2021
IS14.08.2021
PT16.08.2021
LU26.08.2021
Former [2022/26]AL14.04.2021
CZ14.04.2021
DK14.04.2021
EE14.04.2021
ES14.04.2021
FI14.04.2021
HR14.04.2021
LT14.04.2021
LV14.04.2021
MC14.04.2021
NL14.04.2021
PL14.04.2021
RO14.04.2021
RS14.04.2021
SE14.04.2021
SK14.04.2021
SM14.04.2021
BG14.07.2021
NO14.07.2021
GR15.07.2021
IS14.08.2021
PT16.08.2021
LU26.08.2021
Former [2022/23]CZ14.04.2021
DK14.04.2021
EE14.04.2021
ES14.04.2021
FI14.04.2021
HR14.04.2021
LT14.04.2021
LV14.04.2021
MC14.04.2021
NL14.04.2021
PL14.04.2021
RO14.04.2021
RS14.04.2021
SE14.04.2021
SK14.04.2021
SM14.04.2021
BG14.07.2021
NO14.07.2021
GR15.07.2021
IS14.08.2021
PT16.08.2021
LU26.08.2021
Former [2022/18]CZ14.04.2021
DK14.04.2021
EE14.04.2021
ES14.04.2021
FI14.04.2021
HR14.04.2021
LT14.04.2021
LV14.04.2021
MC14.04.2021
NL14.04.2021
PL14.04.2021
RO14.04.2021
RS14.04.2021
SE14.04.2021
SK14.04.2021
SM14.04.2021
BG14.07.2021
NO14.07.2021
GR15.07.2021
PT16.08.2021
IS29.12.2021
Former [2022/10]CZ14.04.2021
DK14.04.2021
EE14.04.2021
ES14.04.2021
FI14.04.2021
HR14.04.2021
LT14.04.2021
LV14.04.2021
NL14.04.2021
PL14.04.2021
RO14.04.2021
RS14.04.2021
SE14.04.2021
SK14.04.2021
SM14.04.2021
BG14.07.2021
NO14.07.2021
GR15.07.2021
PT16.08.2021
IS29.12.2021
Former [2022/09]CZ14.04.2021
DK14.04.2021
ES14.04.2021
FI14.04.2021
HR14.04.2021
LT14.04.2021
LV14.04.2021
NL14.04.2021
PL14.04.2021
RO14.04.2021
RS14.04.2021
SE14.04.2021
SK14.04.2021
SM14.04.2021
BG14.07.2021
NO14.07.2021
GR15.07.2021
IS14.08.2021
PT16.08.2021
Former [2022/08]CZ14.04.2021
DK14.04.2021
ES14.04.2021
FI14.04.2021
HR14.04.2021
LT14.04.2021
LV14.04.2021
NL14.04.2021
PL14.04.2021
RS14.04.2021
SE14.04.2021
SM14.04.2021
BG14.07.2021
NO14.07.2021
GR15.07.2021
IS14.08.2021
PT16.08.2021
Former [2022/07]FI14.04.2021
HR14.04.2021
LT14.04.2021
LV14.04.2021
NL14.04.2021
PL14.04.2021
RS14.04.2021
SE14.04.2021
SM14.04.2021
BG14.07.2021
NO14.07.2021
GR15.07.2021
IS14.08.2021
PT16.08.2021
Former [2021/52]FI14.04.2021
HR14.04.2021
LT14.04.2021
LV14.04.2021
NL14.04.2021
PL14.04.2021
RS14.04.2021
SE14.04.2021
BG14.07.2021
NO14.07.2021
GR15.07.2021
IS14.08.2021
PT16.08.2021
Former [2021/51]FI14.04.2021
HR14.04.2021
LT14.04.2021
LV14.04.2021
NL14.04.2021
RS14.04.2021
SE14.04.2021
BG14.07.2021
NO14.07.2021
GR15.07.2021
IS14.08.2021
PT16.08.2021
Former [2021/50]FI14.04.2021
HR14.04.2021
LT14.04.2021
LV14.04.2021
NL14.04.2021
SE14.04.2021
BG14.07.2021
NO14.07.2021
GR15.07.2021
PT16.08.2021
Former [2021/49]FI14.04.2021
HR14.04.2021
LT14.04.2021
LV14.04.2021
NL14.04.2021
SE14.04.2021
BG14.07.2021
NO14.07.2021
GR15.07.2021
Former [2021/46]FI14.04.2021
LT14.04.2021
NL14.04.2021
BG14.07.2021
Documents cited:Search[A]WO2015049533  (ISIS INNOVATION [GB]) [A] 1-15 * abstract *;
 [A]GB2469522  (ENERGY CONVERSION TECHNOLOGY AS [NO]) [A] 1-15 * page 12 - page 13; figure 3 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.