blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3617075

EP3617075 - LOCALISED LINK DEVICE FOR CONTROLLED SEPARATION COMPRISING A LAYER WITH MULTIDIRECTIONAL LINK [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  04.02.2022
Database last updated on 12.07.2024
FormerThe patent has been granted
Status updated on  26.02.2021
FormerGrant of patent is intended
Status updated on  20.10.2020
FormerRequest for examination was made
Status updated on  11.09.2020
FormerThe application has been published
Status updated on  31.01.2020
Most recent event   Tooltip14.06.2024Lapse of the patent in a contracting state
New state(s): TR
published on 17.07.2024 [2024/29]
Applicant(s)For all designated states
ArianeGroup SAS
Tour Cristal
7-11 quai André Citroën
75015 Paris / FR
[2020/10]
Inventor(s)01 / MEDINA, Felipe
175 Avenue de la République
78500 Sartrouville / FR
02 / GLAVIER, Ludovic
3, rue Paul Doumer
78480 Verneuil sur Seine / FR
 [2020/10]
Representative(s)Brevalex
Tour Trinity
1 B Place de la Défense
92400 Courbevoie / FR
[N/P]
Former [2020/10]Brevalex
95, rue d'Amsterdam
75378 Paris Cedex 8 / FR
Application number, filing date19194488.329.08.2019
[2020/10]
Priority number, dateFR2018005787031.08.2018         Original published format: FR 1857870
[2020/10]
Filing languageFR
Procedural languageFR
PublicationType: A1 Application with search report 
No.:EP3617075
Date:04.03.2020
Language:FR
[2020/10]
Type: B1 Patent specification 
No.:EP3617075
Date:31.03.2021
Language:FR
[2021/13]
Search report(s)(Supplementary) European search report - dispatched on:EP07.01.2020
ClassificationIPC:B64G1/64, F42B15/38
[2020/10]
CPC:
B64G1/641 (EP,US); B64D1/02 (US); B64G1/643 (EP,US);
B64G1/645 (US); B64G1/6455 (EP); F16B5/08 (US);
F42B15/38 (EP) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/42]
Former [2020/10]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:VORRICHTUNG ZUR LOKALISIERTEN VERBINDUNG MIT GESTEUERTER TRENNUNG, DIE EINE MULTIDIREKTIONALE VERBINDUNGSSCHICHT UMFASST[2020/10]
English:LOCALISED LINK DEVICE FOR CONTROLLED SEPARATION COMPRISING A LAYER WITH MULTIDIRECTIONAL LINK[2020/10]
French:DISPOSITIF DE LIAISON LOCALISEE A SEPARATION COMMANDEE COMPRENANT UNE COUCHE DE LIAISON MULTIDIRECTIONNELLE[2020/10]
Examination procedure04.09.2020Examination requested  [2020/42]
04.09.2020Date on which the examining division has become responsible
21.10.2020Communication of intention to grant the patent
19.02.2021Fee for grant paid
19.02.2021Fee for publishing/printing paid
19.02.2021Receipt of the translation of the claim(s)
Opposition(s)04.01.2022No opposition filed within time limit [2022/10]
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU29.08.2019
AL31.03.2021
AT31.03.2021
CY31.03.2021
CZ31.03.2021
DK31.03.2021
EE31.03.2021
FI31.03.2021
GR31.03.2021
HR31.03.2021
IT31.03.2021
LT31.03.2021
LV31.03.2021
MC31.03.2021
MK31.03.2021
NL31.03.2021
PL31.03.2021
RO31.03.2021
RS31.03.2021
SI31.03.2021
SK31.03.2021
SM31.03.2021
TR31.03.2021
BG30.06.2021
NO30.06.2021
IS31.07.2021
PT02.08.2021
IE29.08.2021
LU29.08.2021
BE31.08.2021
[2024/29]
Former [2024/23]HU29.08.2019
AL31.03.2021
AT31.03.2021
CY31.03.2021
CZ31.03.2021
DK31.03.2021
EE31.03.2021
FI31.03.2021
GR31.03.2021
HR31.03.2021
IT31.03.2021
LT31.03.2021
LV31.03.2021
MC31.03.2021
MK31.03.2021
NL31.03.2021
PL31.03.2021
RO31.03.2021
RS31.03.2021
SI31.03.2021
SK31.03.2021
SM31.03.2021
BG30.06.2021
NO30.06.2021
IS31.07.2021
PT02.08.2021
IE29.08.2021
LU29.08.2021
BE31.08.2021
Former [2023/36]HU29.08.2019
AL31.03.2021
AT31.03.2021
CY31.03.2021
CZ31.03.2021
DK31.03.2021
EE31.03.2021
FI31.03.2021
GR31.03.2021
HR31.03.2021
IT31.03.2021
LT31.03.2021
LV31.03.2021
MC31.03.2021
NL31.03.2021
PL31.03.2021
RO31.03.2021
RS31.03.2021
SI31.03.2021
SK31.03.2021
SM31.03.2021
BG30.06.2021
NO30.06.2021
IS31.07.2021
PT02.08.2021
IE29.08.2021
LU29.08.2021
BE31.08.2021
Former [2023/33]HU29.08.2019
AL31.03.2021
AT31.03.2021
CY31.03.2021
CZ31.03.2021
DK31.03.2021
EE31.03.2021
FI31.03.2021
HR31.03.2021
IT31.03.2021
LT31.03.2021
LV31.03.2021
MC31.03.2021
NL31.03.2021
PL31.03.2021
RO31.03.2021
RS31.03.2021
SI31.03.2021
SK31.03.2021
SM31.03.2021
BG30.06.2021
NO30.06.2021
IS31.07.2021
PT02.08.2021
IE29.08.2021
LU29.08.2021
BE31.08.2021
Former [2023/30]AL31.03.2021
AT31.03.2021
CY31.03.2021
CZ31.03.2021
DK31.03.2021
EE31.03.2021
FI31.03.2021
HR31.03.2021
IT31.03.2021
LT31.03.2021
LV31.03.2021
MC31.03.2021
NL31.03.2021
PL31.03.2021
RO31.03.2021
RS31.03.2021
SI31.03.2021
SK31.03.2021
SM31.03.2021
BG30.06.2021
NO30.06.2021
IS31.07.2021
PT02.08.2021
IE29.08.2021
LU29.08.2021
BE31.08.2021
Former [2022/36]AL31.03.2021
AT31.03.2021
CZ31.03.2021
DK31.03.2021
EE31.03.2021
FI31.03.2021
HR31.03.2021
IT31.03.2021
LT31.03.2021
LV31.03.2021
MC31.03.2021
NL31.03.2021
PL31.03.2021
RO31.03.2021
RS31.03.2021
SI31.03.2021
SK31.03.2021
SM31.03.2021
BG30.06.2021
NO30.06.2021
IS31.07.2021
PT02.08.2021
IE29.08.2021
LU29.08.2021
BE31.08.2021
Former [2022/35]AL31.03.2021
AT31.03.2021
CZ31.03.2021
DK31.03.2021
EE31.03.2021
FI31.03.2021
HR31.03.2021
LT31.03.2021
LV31.03.2021
MC31.03.2021
NL31.03.2021
PL31.03.2021
RO31.03.2021
RS31.03.2021
SI31.03.2021
SK31.03.2021
SM31.03.2021
BG30.06.2021
NO30.06.2021
IS31.07.2021
PT02.08.2021
IE29.08.2021
LU29.08.2021
BE31.08.2021
Former [2022/34]AL31.03.2021
AT31.03.2021
CZ31.03.2021
DK31.03.2021
EE31.03.2021
FI31.03.2021
HR31.03.2021
LT31.03.2021
LV31.03.2021
MC31.03.2021
NL31.03.2021
PL31.03.2021
RO31.03.2021
RS31.03.2021
SI31.03.2021
SK31.03.2021
SM31.03.2021
BG30.06.2021
NO30.06.2021
IS31.07.2021
PT02.08.2021
LU29.08.2021
BE31.08.2021
Former [2022/29]AL31.03.2021
AT31.03.2021
CZ31.03.2021
DK31.03.2021
EE31.03.2021
FI31.03.2021
HR31.03.2021
LT31.03.2021
LV31.03.2021
MC31.03.2021
NL31.03.2021
PL31.03.2021
RO31.03.2021
RS31.03.2021
SI31.03.2021
SK31.03.2021
SM31.03.2021
BG30.06.2021
NO30.06.2021
IS31.07.2021
PT02.08.2021
LU29.08.2021
Former [2022/23]AL31.03.2021
AT31.03.2021
CZ31.03.2021
DK31.03.2021
EE31.03.2021
FI31.03.2021
HR31.03.2021
LT31.03.2021
LV31.03.2021
MC31.03.2021
NL31.03.2021
PL31.03.2021
RO31.03.2021
RS31.03.2021
SK31.03.2021
SM31.03.2021
BG30.06.2021
NO30.06.2021
IS31.07.2021
PT02.08.2021
LU29.08.2021
Former [2022/18]AL31.03.2021
AT31.03.2021
CZ31.03.2021
DK31.03.2021
EE31.03.2021
FI31.03.2021
HR31.03.2021
LT31.03.2021
LV31.03.2021
MC31.03.2021
NL31.03.2021
PL31.03.2021
RO31.03.2021
RS31.03.2021
SK31.03.2021
SM31.03.2021
BG30.06.2021
NO30.06.2021
PT02.08.2021
IS24.12.2021
Former [2022/10]AL31.03.2021
AT31.03.2021
CZ31.03.2021
DK31.03.2021
EE31.03.2021
FI31.03.2021
HR31.03.2021
LT31.03.2021
LV31.03.2021
NL31.03.2021
PL31.03.2021
RO31.03.2021
RS31.03.2021
SK31.03.2021
SM31.03.2021
BG30.06.2021
NO30.06.2021
PT02.08.2021
IS24.12.2021
Former [2022/08]AL31.03.2021
AT31.03.2021
CZ31.03.2021
DK31.03.2021
EE31.03.2021
FI31.03.2021
HR31.03.2021
LT31.03.2021
LV31.03.2021
NL31.03.2021
PL31.03.2021
RO31.03.2021
RS31.03.2021
SK31.03.2021
SM31.03.2021
BG30.06.2021
NO30.06.2021
IS31.07.2021
PT02.08.2021
Former [2022/07]AL31.03.2021
AT31.03.2021
CZ31.03.2021
EE31.03.2021
FI31.03.2021
HR31.03.2021
LT31.03.2021
LV31.03.2021
NL31.03.2021
PL31.03.2021
RO31.03.2021
RS31.03.2021
SK31.03.2021
SM31.03.2021
BG30.06.2021
NO30.06.2021
IS31.07.2021
PT02.08.2021
Former [2021/52]AT31.03.2021
CZ31.03.2021
EE31.03.2021
FI31.03.2021
HR31.03.2021
LT31.03.2021
LV31.03.2021
NL31.03.2021
PL31.03.2021
RO31.03.2021
RS31.03.2021
SK31.03.2021
SM31.03.2021
BG30.06.2021
NO30.06.2021
IS31.07.2021
PT02.08.2021
Former [2021/51]AT31.03.2021
CZ31.03.2021
EE31.03.2021
FI31.03.2021
HR31.03.2021
LT31.03.2021
LV31.03.2021
NL31.03.2021
RO31.03.2021
RS31.03.2021
SK31.03.2021
SM31.03.2021
BG30.06.2021
NO30.06.2021
IS31.07.2021
PT02.08.2021
Former [2021/50]AT31.03.2021
CZ31.03.2021
EE31.03.2021
FI31.03.2021
HR31.03.2021
LT31.03.2021
LV31.03.2021
NL31.03.2021
RO31.03.2021
RS31.03.2021
SK31.03.2021
SM31.03.2021
BG30.06.2021
NO30.06.2021
PT02.08.2021
Former [2021/48]AT31.03.2021
CZ31.03.2021
EE31.03.2021
FI31.03.2021
HR31.03.2021
LT31.03.2021
LV31.03.2021
NL31.03.2021
RS31.03.2021
SM31.03.2021
BG30.06.2021
NO30.06.2021
Former [2021/47]AT31.03.2021
CZ31.03.2021
FI31.03.2021
HR31.03.2021
LT31.03.2021
LV31.03.2021
NL31.03.2021
RS31.03.2021
SM31.03.2021
BG30.06.2021
NO30.06.2021
Former [2021/46]AT31.03.2021
FI31.03.2021
HR31.03.2021
LT31.03.2021
LV31.03.2021
RS31.03.2021
SM31.03.2021
BG30.06.2021
NO30.06.2021
Former [2021/37]FI31.03.2021
HR31.03.2021
LV31.03.2021
RS31.03.2021
BG30.06.2021
NO30.06.2021
Former [2021/36]FI31.03.2021
HR31.03.2021
BG30.06.2021
NO30.06.2021
Former [2021/35]FI31.03.2021
HR31.03.2021
NO30.06.2021
Former [2021/33]FI31.03.2021
NO30.06.2021
Documents cited:Search[AD]WO2015014942  (AIRBUS DEFENCE & SPACE SAS [FR]) [AD] 1-12* the whole document *;
 [A]FR3041609  (AIRBUS DEFENCE & SPACE SAS [FR]) [A] 1-12 * the whole document *;
 [A]FR3055887  (AIRBUS SAFRAN LAUNCHERS SAS [FR]) [A] 1-12 * the whole document *
by applicantEP1196326
 WO2015014942
 WO2015014943
 WO2015014941
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.