EP3787237 - METHOD FOR DATA TRANSMISSION IN A REDUNDANTLY OPERABLE COMMUNICATION NETWORK AND COUPLING COMMUNICATION DEVICE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 23.02.2024 Database last updated on 16.07.2024 | |
Former | The patent has been granted Status updated on 17.03.2023 | ||
Former | Grant of patent is intended Status updated on 15.12.2022 | ||
Former | Request for examination was made Status updated on 06.08.2021 | ||
Former | The application has been published Status updated on 29.01.2021 | Most recent event Tooltip | 12.07.2024 | Lapse of the patent in a contracting state New state(s): GB, IE | published on 14.08.2024 [2024/33] | Applicant(s) | For all designated states Siemens Aktiengesellschaft Werner-von-Siemens-Straße 1 80333 München / DE | [2021/09] | Inventor(s) | 01 /
Schlennert, Dieter Lindenweg 43 90587 Obermichelbach / DE | 02 /
Müller, Christian Fabrikstraße 14a 90530 Wendelstein / DE | 03 /
Weichlein, Thomas Liebigstr. 14 91052 Erlangen / DE | [2021/09] | Representative(s) | Siemens Patent Attorneys Postfach 22 16 34 80506 München / DE | [2023/16] | Application number, filing date | 19194686.2 | 30.08.2019 | [2021/09] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | EP3787237 | Date: | 03.03.2021 | Language: | DE | [2021/09] | Type: | B1 Patent specification | No.: | EP3787237 | Date: | 19.04.2023 | Language: | DE | [2023/16] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 06.03.2020 | Classification | IPC: | H04L12/437, // H04L12/42 | [2022/52] | CPC: |
H04L12/437 (EP,US);
H04L12/423 (US);
H04L41/12 (US);
H04L2012/421 (EP,US)
|
Former IPC [2021/09] | H04L12/437 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2021/36] |
Former [2021/09] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | VERFAHREN ZUR DATENÜBERMITTLUNG IN EINEM REDUNDANT BETREIBBAREN KOMMUNIKATIONSNETZ UND KOPPEL-KOMMUNIKATIONSGERÄT | [2021/09] | English: | METHOD FOR DATA TRANSMISSION IN A REDUNDANTLY OPERABLE COMMUNICATION NETWORK AND COUPLING COMMUNICATION DEVICE | [2021/09] | French: | PROCÉDÉ DE TRANSMISSION DE DONNÉES DANS UN RÉSEAU DE COMMUNICATION À FONCTIONNEMENT REDONDANT ET APPAREIL DE COMMUNICATION PAR COUPLAGE | [2021/09] | Examination procedure | 23.07.2021 | Amendment by applicant (claims and/or description) | 03.08.2021 | Examination requested [2021/36] | 03.08.2021 | Date on which the examining division has become responsible | 16.12.2022 | Communication of intention to grant the patent | 09.03.2023 | Receipt of the translation of the claim(s) | 10.03.2023 | Fee for grant paid | 10.03.2023 | Fee for publishing/printing paid | Opposition(s) | 22.01.2024 | No opposition filed within time limit [2024/13] | Fees paid | Renewal fee | 19.08.2021 | Renewal fee patent year 03 | 19.08.2022 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AL | 19.04.2023 | CZ | 19.04.2023 | DK | 19.04.2023 | EE | 19.04.2023 | ES | 19.04.2023 | FI | 19.04.2023 | HR | 19.04.2023 | LT | 19.04.2023 | LV | 19.04.2023 | MC | 19.04.2023 | NL | 19.04.2023 | PL | 19.04.2023 | RO | 19.04.2023 | RS | 19.04.2023 | SE | 19.04.2023 | SI | 19.04.2023 | SK | 19.04.2023 | SM | 19.04.2023 | NO | 19.07.2023 | GR | 20.07.2023 | IS | 19.08.2023 | PT | 21.08.2023 | GB | 30.08.2023 | IE | 30.08.2023 | LU | 30.08.2023 | CH | 31.08.2023 | [2024/33] |
Former [2024/25] | AL | 19.04.2023 | |
CZ | 19.04.2023 | ||
DK | 19.04.2023 | ||
EE | 19.04.2023 | ||
ES | 19.04.2023 | ||
FI | 19.04.2023 | ||
HR | 19.04.2023 | ||
LT | 19.04.2023 | ||
LV | 19.04.2023 | ||
MC | 19.04.2023 | ||
NL | 19.04.2023 | ||
PL | 19.04.2023 | ||
RO | 19.04.2023 | ||
RS | 19.04.2023 | ||
SE | 19.04.2023 | ||
SI | 19.04.2023 | ||
SK | 19.04.2023 | ||
SM | 19.04.2023 | ||
NO | 19.07.2023 | ||
GR | 20.07.2023 | ||
IS | 19.08.2023 | ||
PT | 21.08.2023 | ||
LU | 30.08.2023 | ||
CH | 31.08.2023 | ||
Former [2024/21] | AL | 19.04.2023 | |
CZ | 19.04.2023 | ||
DK | 19.04.2023 | ||
EE | 19.04.2023 | ||
ES | 19.04.2023 | ||
FI | 19.04.2023 | ||
HR | 19.04.2023 | ||
LT | 19.04.2023 | ||
LV | 19.04.2023 | ||
MC | 19.04.2023 | ||
NL | 19.04.2023 | ||
PL | 19.04.2023 | ||
RO | 19.04.2023 | ||
RS | 19.04.2023 | ||
SE | 19.04.2023 | ||
SK | 19.04.2023 | ||
SM | 19.04.2023 | ||
NO | 19.07.2023 | ||
GR | 20.07.2023 | ||
IS | 19.08.2023 | ||
PT | 21.08.2023 | ||
LU | 30.08.2023 | ||
Former [2024/16] | AL | 19.04.2023 | |
CZ | 19.04.2023 | ||
DK | 19.04.2023 | ||
EE | 19.04.2023 | ||
ES | 19.04.2023 | ||
FI | 19.04.2023 | ||
HR | 19.04.2023 | ||
LT | 19.04.2023 | ||
LV | 19.04.2023 | ||
MC | 19.04.2023 | ||
NL | 19.04.2023 | ||
PL | 19.04.2023 | ||
RO | 19.04.2023 | ||
RS | 19.04.2023 | ||
SE | 19.04.2023 | ||
SK | 19.04.2023 | ||
SM | 19.04.2023 | ||
NO | 19.07.2023 | ||
GR | 20.07.2023 | ||
IS | 19.08.2023 | ||
PT | 21.08.2023 | ||
Former [2024/10] | AL | 19.04.2023 | |
CZ | 19.04.2023 | ||
DK | 19.04.2023 | ||
EE | 19.04.2023 | ||
ES | 19.04.2023 | ||
FI | 19.04.2023 | ||
HR | 19.04.2023 | ||
LT | 19.04.2023 | ||
LV | 19.04.2023 | ||
NL | 19.04.2023 | ||
PL | 19.04.2023 | ||
RO | 19.04.2023 | ||
RS | 19.04.2023 | ||
SE | 19.04.2023 | ||
SK | 19.04.2023 | ||
SM | 19.04.2023 | ||
NO | 19.07.2023 | ||
GR | 20.07.2023 | ||
IS | 19.08.2023 | ||
PT | 21.08.2023 | ||
Former [2024/08] | AL | 19.04.2023 | |
ES | 19.04.2023 | ||
FI | 19.04.2023 | ||
HR | 19.04.2023 | ||
LT | 19.04.2023 | ||
LV | 19.04.2023 | ||
NL | 19.04.2023 | ||
PL | 19.04.2023 | ||
RS | 19.04.2023 | ||
SE | 19.04.2023 | ||
SK | 19.04.2023 | ||
SM | 19.04.2023 | ||
NO | 19.07.2023 | ||
GR | 20.07.2023 | ||
IS | 19.08.2023 | ||
PT | 21.08.2023 | ||
Former [2024/03] | AL | 19.04.2023 | |
ES | 19.04.2023 | ||
FI | 19.04.2023 | ||
HR | 19.04.2023 | ||
LT | 19.04.2023 | ||
LV | 19.04.2023 | ||
NL | 19.04.2023 | ||
PL | 19.04.2023 | ||
RS | 19.04.2023 | ||
SE | 19.04.2023 | ||
NO | 19.07.2023 | ||
GR | 20.07.2023 | ||
IS | 19.08.2023 | ||
PT | 21.08.2023 | ||
Former [2024/01] | AL | 19.04.2023 | |
ES | 19.04.2023 | ||
HR | 19.04.2023 | ||
LT | 19.04.2023 | ||
LV | 19.04.2023 | ||
NL | 19.04.2023 | ||
PL | 19.04.2023 | ||
RS | 19.04.2023 | ||
SE | 19.04.2023 | ||
NO | 19.07.2023 | ||
GR | 20.07.2023 | ||
IS | 19.08.2023 | ||
PT | 21.08.2023 | ||
Former [2023/51] | AL | 19.04.2023 | |
ES | 19.04.2023 | ||
HR | 19.04.2023 | ||
NL | 19.04.2023 | ||
PL | 19.04.2023 | ||
RS | 19.04.2023 | ||
SE | 19.04.2023 | ||
NO | 19.07.2023 | ||
GR | 20.07.2023 | ||
IS | 19.08.2023 | ||
PT | 21.08.2023 | ||
Former [2023/50] | AL | 19.04.2023 | |
ES | 19.04.2023 | ||
NL | 19.04.2023 | ||
PL | 19.04.2023 | ||
SE | 19.04.2023 | ||
NO | 19.07.2023 | ||
GR | 20.07.2023 | ||
IS | 19.08.2023 | ||
PT | 21.08.2023 | ||
Former [2023/48] | ES | 19.04.2023 | |
NL | 19.04.2023 | ||
SE | 19.04.2023 | ||
NO | 19.07.2023 | ||
PT | 21.08.2023 | ||
Former [2023/46] | ES | 19.04.2023 | |
NL | 19.04.2023 | ||
PT | 21.08.2023 | ||
Former [2023/43] | NL | 19.04.2023 | Documents cited: | Search | [A]US2009022168 (SAKAUCHI MASAHIRO [JP], et al) [A] 1-14 * figures 1,9-11 * * paragraphs [0144] - [0162] * * paragraphs [0226] - [0233] *; | [A]US2009109841 (NOZAKI SHINJI [JP], et al) [A] 1-14 * figures 3-5 * * paragraphs [0026] - [0037] *; | [AD]EP2854345 (SIEMENS AG [DE]) [AD] 1-14 * figure . ** paragraphs [0021] - [0027] * | by applicant | EP1062787 | EP1476987 | EP1476988 | EP1955480 | EP2413538 | EP2854345 |