EP3594523 - SYSTEMS AND METHOD FOR ALTERNATIVNG MATERIAL BRAKE DISK STACK [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 14.04.2023 Database last updated on 02.11.2024 | |
Former | The patent has been granted Status updated on 06.05.2022 | ||
Former | Grant of patent is intended Status updated on 20.12.2021 | ||
Former | Request for examination was made Status updated on 17.07.2020 | ||
Former | The application has been published Status updated on 13.12.2019 | Most recent event Tooltip | 16.02.2024 | Lapse of the patent in a contracting state New state(s): BE, IT | published on 20.03.2024 [2024/12] | Applicant(s) | For all designated states Goodrich Corporation 4 Coliseum Centre 2730 West Tyvola Road Charlotte, NC 28217-4578 / US | [2020/03] | Inventor(s) | 01 /
KELLER, Steven Thomas 603 Beery Blvd. Union, OH Ohio 45322 / US | 02 /
NIXON, Thomas Dwayne 2449 N.Revere Road Akron, OH Ohio 44333 / US | [2020/03] | Representative(s) | Dehns 10 Old Bailey London EC4M 7NG / GB | [N/P] |
Former [2020/03] | Dehns St. Bride's House 10 Salisbury Square London EC4Y 8JD / GB | Application number, filing date | 19195227.4 | 24.02.2014 | [2020/03] | Priority number, date | US201313791075 | 08.03.2013 Original published format: US201313791075 | [2020/03] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3594523 | Date: | 15.01.2020 | Language: | EN | [2020/03] | Type: | B1 Patent specification | No.: | EP3594523 | Date: | 08.06.2022 | Language: | EN | [2022/23] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 11.10.2019 | Classification | IPC: | F16D55/38 | [2020/03] | CPC: |
F16D55/36 (EP,US);
F16D65/12 (EP,US);
F16D2200/0047 (EP,US);
F16D2200/0052 (EP,US);
Y10T29/49826 (EP,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/34] |
Former [2020/03] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | SYSTEME UND VERFAHREN FÜR BREMSSCHEIBENSTAPEL MIT ALTERNIERENDEM MATERIAL | [2020/03] | English: | SYSTEMS AND METHOD FOR ALTERNATIVNG MATERIAL BRAKE DISK STACK | [2020/03] | French: | SYSTÈMES ET PROCÉDÉ D'EMPILEMENT DE DISQUES DE FREIN EN MATÉRIAU ALTERNATIF | [2020/03] | Examination procedure | 14.07.2020 | Amendment by applicant (claims and/or description) | 14.07.2020 | Examination requested [2020/34] | 14.07.2020 | Date on which the examining division has become responsible | 21.12.2021 | Communication of intention to grant the patent | 28.04.2022 | Fee for grant paid | 28.04.2022 | Fee for publishing/printing paid | 28.04.2022 | Receipt of the translation of the claim(s) | Parent application(s) Tooltip | EP14156389.0 / EP2775161 | Opposition(s) | 10.03.2023 | No opposition filed within time limit [2023/20] | Fees paid | Renewal fee | 03.09.2019 | Renewal fee patent year 03 | 03.09.2019 | Renewal fee patent year 04 | 03.09.2019 | Renewal fee patent year 05 | 03.09.2019 | Renewal fee patent year 06 | 20.02.2020 | Renewal fee patent year 07 | 19.02.2021 | Renewal fee patent year 08 | 17.02.2022 | Renewal fee patent year 09 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AL | 08.06.2022 | AT | 08.06.2022 | CZ | 08.06.2022 | DK | 08.06.2022 | EE | 08.06.2022 | ES | 08.06.2022 | FI | 08.06.2022 | HR | 08.06.2022 | IT | 08.06.2022 | LT | 08.06.2022 | LV | 08.06.2022 | MC | 08.06.2022 | NL | 08.06.2022 | PL | 08.06.2022 | RO | 08.06.2022 | RS | 08.06.2022 | SE | 08.06.2022 | SI | 08.06.2022 | SK | 08.06.2022 | SM | 08.06.2022 | BG | 08.09.2022 | NO | 08.09.2022 | GR | 09.09.2022 | IS | 08.10.2022 | PT | 10.10.2022 | IE | 24.02.2023 | LU | 24.02.2023 | BE | 28.02.2023 | CH | 28.02.2023 | LI | 28.02.2023 | [2024/11] |
Former [2024/08] | AL | 08.06.2022 | |
AT | 08.06.2022 | ||
CZ | 08.06.2022 | ||
DK | 08.06.2022 | ||
EE | 08.06.2022 | ||
ES | 08.06.2022 | ||
FI | 08.06.2022 | ||
HR | 08.06.2022 | ||
LT | 08.06.2022 | ||
LV | 08.06.2022 | ||
MC | 08.06.2022 | ||
NL | 08.06.2022 | ||
PL | 08.06.2022 | ||
RO | 08.06.2022 | ||
RS | 08.06.2022 | ||
SE | 08.06.2022 | ||
SI | 08.06.2022 | ||
SK | 08.06.2022 | ||
SM | 08.06.2022 | ||
BG | 08.09.2022 | ||
NO | 08.09.2022 | ||
GR | 09.09.2022 | ||
IS | 08.10.2022 | ||
PT | 10.10.2022 | ||
IE | 24.02.2023 | ||
LU | 24.02.2023 | ||
CH | 28.02.2023 | ||
LI | 28.02.2023 | ||
Former [2023/49] | AL | 08.06.2022 | |
AT | 08.06.2022 | ||
CZ | 08.06.2022 | ||
DK | 08.06.2022 | ||
EE | 08.06.2022 | ||
ES | 08.06.2022 | ||
FI | 08.06.2022 | ||
HR | 08.06.2022 | ||
LT | 08.06.2022 | ||
LV | 08.06.2022 | ||
MC | 08.06.2022 | ||
NL | 08.06.2022 | ||
PL | 08.06.2022 | ||
RO | 08.06.2022 | ||
RS | 08.06.2022 | ||
SE | 08.06.2022 | ||
SI | 08.06.2022 | ||
SK | 08.06.2022 | ||
SM | 08.06.2022 | ||
BG | 08.09.2022 | ||
NO | 08.09.2022 | ||
GR | 09.09.2022 | ||
IS | 08.10.2022 | ||
PT | 10.10.2022 | ||
LU | 24.02.2023 | ||
CH | 28.02.2023 | ||
LI | 28.02.2023 | ||
Former [2023/48] | AL | 08.06.2022 | |
AT | 08.06.2022 | ||
CZ | 08.06.2022 | ||
DK | 08.06.2022 | ||
EE | 08.06.2022 | ||
ES | 08.06.2022 | ||
FI | 08.06.2022 | ||
HR | 08.06.2022 | ||
LT | 08.06.2022 | ||
LV | 08.06.2022 | ||
MC | 08.06.2022 | ||
NL | 08.06.2022 | ||
PL | 08.06.2022 | ||
RO | 08.06.2022 | ||
RS | 08.06.2022 | ||
SE | 08.06.2022 | ||
SI | 08.06.2022 | ||
SK | 08.06.2022 | ||
SM | 08.06.2022 | ||
BG | 08.09.2022 | ||
NO | 08.09.2022 | ||
GR | 09.09.2022 | ||
IS | 08.10.2022 | ||
PT | 10.10.2022 | ||
CH | 28.02.2023 | ||
LI | 28.02.2023 | ||
Former [2023/44] | AL | 08.06.2022 | |
AT | 08.06.2022 | ||
CZ | 08.06.2022 | ||
DK | 08.06.2022 | ||
EE | 08.06.2022 | ||
ES | 08.06.2022 | ||
FI | 08.06.2022 | ||
HR | 08.06.2022 | ||
LT | 08.06.2022 | ||
LV | 08.06.2022 | ||
MC | 08.06.2022 | ||
NL | 08.06.2022 | ||
PL | 08.06.2022 | ||
RO | 08.06.2022 | ||
RS | 08.06.2022 | ||
SE | 08.06.2022 | ||
SI | 08.06.2022 | ||
SK | 08.06.2022 | ||
SM | 08.06.2022 | ||
BG | 08.09.2022 | ||
NO | 08.09.2022 | ||
GR | 09.09.2022 | ||
IS | 08.10.2022 | ||
PT | 10.10.2022 | ||
Former [2023/25] | AL | 08.06.2022 | |
AT | 08.06.2022 | ||
CZ | 08.06.2022 | ||
DK | 08.06.2022 | ||
EE | 08.06.2022 | ||
ES | 08.06.2022 | ||
FI | 08.06.2022 | ||
HR | 08.06.2022 | ||
LT | 08.06.2022 | ||
LV | 08.06.2022 | ||
NL | 08.06.2022 | ||
PL | 08.06.2022 | ||
RO | 08.06.2022 | ||
RS | 08.06.2022 | ||
SE | 08.06.2022 | ||
SI | 08.06.2022 | ||
SK | 08.06.2022 | ||
SM | 08.06.2022 | ||
BG | 08.09.2022 | ||
NO | 08.09.2022 | ||
GR | 09.09.2022 | ||
IS | 08.10.2022 | ||
PT | 10.10.2022 | ||
Former [2023/21] | AL | 08.06.2022 | |
AT | 08.06.2022 | ||
CZ | 08.06.2022 | ||
DK | 08.06.2022 | ||
EE | 08.06.2022 | ||
ES | 08.06.2022 | ||
FI | 08.06.2022 | ||
HR | 08.06.2022 | ||
LT | 08.06.2022 | ||
LV | 08.06.2022 | ||
NL | 08.06.2022 | ||
PL | 08.06.2022 | ||
RO | 08.06.2022 | ||
RS | 08.06.2022 | ||
SE | 08.06.2022 | ||
SK | 08.06.2022 | ||
SM | 08.06.2022 | ||
BG | 08.09.2022 | ||
NO | 08.09.2022 | ||
GR | 09.09.2022 | ||
IS | 08.10.2022 | ||
PT | 10.10.2022 | ||
Former [2023/17] | AL | 08.06.2022 | |
AT | 08.06.2022 | ||
CZ | 08.06.2022 | ||
EE | 08.06.2022 | ||
ES | 08.06.2022 | ||
FI | 08.06.2022 | ||
HR | 08.06.2022 | ||
LT | 08.06.2022 | ||
LV | 08.06.2022 | ||
NL | 08.06.2022 | ||
PL | 08.06.2022 | ||
RO | 08.06.2022 | ||
RS | 08.06.2022 | ||
SE | 08.06.2022 | ||
SK | 08.06.2022 | ||
SM | 08.06.2022 | ||
BG | 08.09.2022 | ||
NO | 08.09.2022 | ||
GR | 09.09.2022 | ||
IS | 08.10.2022 | ||
PT | 10.10.2022 | ||
Former [2023/12] | AT | 08.06.2022 | |
CZ | 08.06.2022 | ||
EE | 08.06.2022 | ||
ES | 08.06.2022 | ||
FI | 08.06.2022 | ||
HR | 08.06.2022 | ||
LT | 08.06.2022 | ||
LV | 08.06.2022 | ||
NL | 08.06.2022 | ||
PL | 08.06.2022 | ||
RO | 08.06.2022 | ||
RS | 08.06.2022 | ||
SE | 08.06.2022 | ||
SK | 08.06.2022 | ||
SM | 08.06.2022 | ||
BG | 08.09.2022 | ||
NO | 08.09.2022 | ||
GR | 09.09.2022 | ||
IS | 08.10.2022 | ||
PT | 10.10.2022 | ||
Former [2023/11] | AT | 08.06.2022 | |
CZ | 08.06.2022 | ||
EE | 08.06.2022 | ||
ES | 08.06.2022 | ||
FI | 08.06.2022 | ||
HR | 08.06.2022 | ||
LT | 08.06.2022 | ||
LV | 08.06.2022 | ||
NL | 08.06.2022 | ||
PL | 08.06.2022 | ||
RO | 08.06.2022 | ||
RS | 08.06.2022 | ||
SE | 08.06.2022 | ||
SK | 08.06.2022 | ||
SM | 08.06.2022 | ||
BG | 08.09.2022 | ||
NO | 08.09.2022 | ||
GR | 09.09.2022 | ||
PT | 10.10.2022 | ||
Former [2023/09] | AT | 08.06.2022 | |
CZ | 08.06.2022 | ||
EE | 08.06.2022 | ||
ES | 08.06.2022 | ||
FI | 08.06.2022 | ||
HR | 08.06.2022 | ||
LT | 08.06.2022 | ||
LV | 08.06.2022 | ||
NL | 08.06.2022 | ||
RO | 08.06.2022 | ||
RS | 08.06.2022 | ||
SE | 08.06.2022 | ||
SK | 08.06.2022 | ||
SM | 08.06.2022 | ||
BG | 08.09.2022 | ||
NO | 08.09.2022 | ||
GR | 09.09.2022 | ||
PT | 10.10.2022 | ||
Former [2023/07] | AT | 08.06.2022 | |
ES | 08.06.2022 | ||
FI | 08.06.2022 | ||
HR | 08.06.2022 | ||
LT | 08.06.2022 | ||
LV | 08.06.2022 | ||
NL | 08.06.2022 | ||
RS | 08.06.2022 | ||
SE | 08.06.2022 | ||
BG | 08.09.2022 | ||
NO | 08.09.2022 | ||
GR | 09.09.2022 | ||
Former [2023/02] | ES | 08.06.2022 | |
FI | 08.06.2022 | ||
HR | 08.06.2022 | ||
LT | 08.06.2022 | ||
LV | 08.06.2022 | ||
NL | 08.06.2022 | ||
RS | 08.06.2022 | ||
SE | 08.06.2022 | ||
BG | 08.09.2022 | ||
NO | 08.09.2022 | ||
GR | 09.09.2022 | ||
Former [2022/50] | ES | 08.06.2022 | |
FI | 08.06.2022 | ||
HR | 08.06.2022 | ||
LT | 08.06.2022 | ||
LV | 08.06.2022 | ||
RS | 08.06.2022 | ||
SE | 08.06.2022 | ||
BG | 08.09.2022 | ||
NO | 08.09.2022 | ||
GR | 09.09.2022 | ||
Former [2022/49] | ES | 08.06.2022 | |
FI | 08.06.2022 | ||
HR | 08.06.2022 | ||
LT | 08.06.2022 | ||
LV | 08.06.2022 | ||
SE | 08.06.2022 | ||
BG | 08.09.2022 | ||
NO | 08.09.2022 | ||
GR | 09.09.2022 | ||
Former [2022/47] | ES | 08.06.2022 | |
FI | 08.06.2022 | ||
LT | 08.06.2022 | ||
SE | 08.06.2022 | ||
NO | 08.09.2022 | Documents cited: | Search | [X]US5560455 (ATMUR STEVEN D [US], et al) [X] 1,2,4-11,13-15 * column 6, line 1 - line 13; figure 4; claims 1,2 *; | [X]EP1052422 (GOODRICH CO B F [US]) [X] 1-3,7-12,15* paragraph [0027]; figure 1 *; | [XI]EP1930618 (HONEYWELL INT INC [US]) [X] 1-4,6-13,15 * paragraphs [0028] - [0030]; figure 1; claim 1 * [I] 5,14 | Examination | EP1052422 | EP1930618 | by applicant | US6855428 | US7378362 |