EP3628915 - SINGLE-PIECE OPTICAL PART MADE OF TRANSPARENT OR TRANSLUCENT MATERIAL WITH INACTIVE SURFACE WITH DIFFUSING PORTION [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 05.05.2023 Database last updated on 12.07.2024 | |
Former | The patent has been granted Status updated on 27.05.2022 | ||
Former | Grant of patent is intended Status updated on 24.01.2022 | ||
Former | Request for examination was made Status updated on 09.10.2020 | ||
Former | The application has been published Status updated on 28.02.2020 | Most recent event Tooltip | 31.05.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 03.07.2024 [2024/27] | Applicant(s) | For all designated states Valeo Vision 34,rue Saint André 93012 Bobigny Cedex / FR | [2020/14] | Inventor(s) | 01 /
GROMFELD, Yves VALEO VISION 26 Boulevard de l'Industrie Zone Industrielle Ecouflant Angers 49000 ANGERS / FR | [2020/14] | Representative(s) | Valeo Visibility Service Propriété Industrielle c/o Valeo Vision 34, rue Saint André 93012 Bobigny / FR | [2022/26] |
Former [2020/14] | Valeo Vision IP Department 34, rue Saint André 93012 Bobigny / FR | Application number, filing date | 19195640.8 | 05.09.2019 | [2020/14] | Priority number, date | FR20180058944 | 28.09.2018 Original published format: FR 1858944 | [2020/14] | Filing language | FR | Procedural language | FR | Publication | Type: | A1 Application with search report | No.: | EP3628915 | Date: | 01.04.2020 | Language: | FR | [2020/14] | Type: | B1 Patent specification | No.: | EP3628915 | Date: | 29.06.2022 | Language: | FR | [2022/26] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 18.02.2020 | Classification | IPC: | F21S41/275, F21S41/147, F21S41/27, F21S41/151, F21S41/148 | [2022/01] | CPC: |
F21S41/275 (EP,US);
F21S41/20 (CN);
F21S41/285 (US);
F21S41/141 (CN);
F21S41/148 (EP);
F21S41/151 (EP);
F21S41/27 (EP);
F21S41/32 (CN);
F21S41/322 (US);
F21S41/365 (US);
F21V5/00 (CN);
F21V5/008 (US);
|
Former IPC [2020/14] | F21S41/275, F21S41/147, F21S41/27 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/46] |
Former [2020/14] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | OPTISCHES MONOBLOCKTEIL AUS DURCHSICHTIGEM ODER LICHTDURCHLÄSSIGEM MATERIAL MIT INAKTIVER OBERFLÄCHE, DIE EINEN LICHTSTREUENDEN ABSCHNITT UMFASST | [2020/14] | English: | SINGLE-PIECE OPTICAL PART MADE OF TRANSPARENT OR TRANSLUCENT MATERIAL WITH INACTIVE SURFACE WITH DIFFUSING PORTION | [2020/14] | French: | PIECE OPTIQUE MONOBLOC EN MATERIAU TRANSPARENT OU TRANSLUCIDE A SURFACE INACTIVE AVEC PORTION DIFFUSANTE | [2020/14] | Examination procedure | 01.10.2020 | Amendment by applicant (claims and/or description) | 01.10.2020 | Examination requested [2020/46] | 01.10.2020 | Date on which the examining division has become responsible | 25.01.2022 | Communication of intention to grant the patent | 19.05.2022 | Fee for grant paid | 19.05.2022 | Fee for publishing/printing paid | 19.05.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 30.03.2023 | No opposition filed within time limit [2023/23] | Fees paid | Renewal fee | 30.08.2021 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 05.09.2019 | AL | 29.06.2022 | AT | 29.06.2022 | CY | 29.06.2022 | CZ | 29.06.2022 | DK | 29.06.2022 | EE | 29.06.2022 | ES | 29.06.2022 | FI | 29.06.2022 | HR | 29.06.2022 | IT | 29.06.2022 | LT | 29.06.2022 | LV | 29.06.2022 | MC | 29.06.2022 | MK | 29.06.2022 | NL | 29.06.2022 | PL | 29.06.2022 | RO | 29.06.2022 | RS | 29.06.2022 | SE | 29.06.2022 | SI | 29.06.2022 | SK | 29.06.2022 | SM | 29.06.2022 | IE | 05.09.2022 | LU | 05.09.2022 | BG | 29.09.2022 | NO | 29.09.2022 | BE | 30.09.2022 | CH | 30.09.2022 | GR | 30.09.2022 | LI | 30.09.2022 | IS | 29.10.2022 | PT | 31.10.2022 | [2024/27] |
Former [2024/21] | HU | 05.09.2019 | |
AL | 29.06.2022 | ||
AT | 29.06.2022 | ||
CY | 29.06.2022 | ||
CZ | 29.06.2022 | ||
DK | 29.06.2022 | ||
EE | 29.06.2022 | ||
ES | 29.06.2022 | ||
FI | 29.06.2022 | ||
HR | 29.06.2022 | ||
IT | 29.06.2022 | ||
LT | 29.06.2022 | ||
LV | 29.06.2022 | ||
MC | 29.06.2022 | ||
NL | 29.06.2022 | ||
PL | 29.06.2022 | ||
RO | 29.06.2022 | ||
RS | 29.06.2022 | ||
SE | 29.06.2022 | ||
SI | 29.06.2022 | ||
SK | 29.06.2022 | ||
SM | 29.06.2022 | ||
IE | 05.09.2022 | ||
LU | 05.09.2022 | ||
BG | 29.09.2022 | ||
NO | 29.09.2022 | ||
BE | 30.09.2022 | ||
CH | 30.09.2022 | ||
GR | 30.09.2022 | ||
LI | 30.09.2022 | ||
IS | 29.10.2022 | ||
PT | 31.10.2022 | ||
Former [2024/18] | HU | 05.09.2019 | |
AL | 29.06.2022 | ||
AT | 29.06.2022 | ||
CZ | 29.06.2022 | ||
DK | 29.06.2022 | ||
EE | 29.06.2022 | ||
ES | 29.06.2022 | ||
FI | 29.06.2022 | ||
HR | 29.06.2022 | ||
IT | 29.06.2022 | ||
LT | 29.06.2022 | ||
LV | 29.06.2022 | ||
MC | 29.06.2022 | ||
NL | 29.06.2022 | ||
PL | 29.06.2022 | ||
RO | 29.06.2022 | ||
RS | 29.06.2022 | ||
SE | 29.06.2022 | ||
SI | 29.06.2022 | ||
SK | 29.06.2022 | ||
SM | 29.06.2022 | ||
IE | 05.09.2022 | ||
LU | 05.09.2022 | ||
BG | 29.09.2022 | ||
NO | 29.09.2022 | ||
BE | 30.09.2022 | ||
CH | 30.09.2022 | ||
GR | 30.09.2022 | ||
LI | 30.09.2022 | ||
IS | 29.10.2022 | ||
PT | 31.10.2022 | ||
Former [2024/11] | AL | 29.06.2022 | |
AT | 29.06.2022 | ||
CZ | 29.06.2022 | ||
DK | 29.06.2022 | ||
EE | 29.06.2022 | ||
ES | 29.06.2022 | ||
FI | 29.06.2022 | ||
HR | 29.06.2022 | ||
IT | 29.06.2022 | ||
LT | 29.06.2022 | ||
LV | 29.06.2022 | ||
MC | 29.06.2022 | ||
NL | 29.06.2022 | ||
PL | 29.06.2022 | ||
RO | 29.06.2022 | ||
RS | 29.06.2022 | ||
SE | 29.06.2022 | ||
SI | 29.06.2022 | ||
SK | 29.06.2022 | ||
SM | 29.06.2022 | ||
IE | 05.09.2022 | ||
LU | 05.09.2022 | ||
BG | 29.09.2022 | ||
NO | 29.09.2022 | ||
BE | 30.09.2022 | ||
CH | 30.09.2022 | ||
GR | 30.09.2022 | ||
LI | 30.09.2022 | ||
IS | 29.10.2022 | ||
PT | 31.10.2022 | ||
Former [2023/42] | AL | 29.06.2022 | |
AT | 29.06.2022 | ||
CZ | 29.06.2022 | ||
DK | 29.06.2022 | ||
EE | 29.06.2022 | ||
ES | 29.06.2022 | ||
FI | 29.06.2022 | ||
HR | 29.06.2022 | ||
LT | 29.06.2022 | ||
LV | 29.06.2022 | ||
MC | 29.06.2022 | ||
NL | 29.06.2022 | ||
PL | 29.06.2022 | ||
RO | 29.06.2022 | ||
RS | 29.06.2022 | ||
SE | 29.06.2022 | ||
SI | 29.06.2022 | ||
SK | 29.06.2022 | ||
SM | 29.06.2022 | ||
IE | 05.09.2022 | ||
LU | 05.09.2022 | ||
BG | 29.09.2022 | ||
NO | 29.09.2022 | ||
BE | 30.09.2022 | ||
CH | 30.09.2022 | ||
GR | 30.09.2022 | ||
LI | 30.09.2022 | ||
IS | 29.10.2022 | ||
PT | 31.10.2022 | ||
Former [2023/37] | AL | 29.06.2022 | |
AT | 29.06.2022 | ||
CZ | 29.06.2022 | ||
DK | 29.06.2022 | ||
EE | 29.06.2022 | ||
ES | 29.06.2022 | ||
FI | 29.06.2022 | ||
HR | 29.06.2022 | ||
LT | 29.06.2022 | ||
LV | 29.06.2022 | ||
MC | 29.06.2022 | ||
NL | 29.06.2022 | ||
PL | 29.06.2022 | ||
RO | 29.06.2022 | ||
RS | 29.06.2022 | ||
SE | 29.06.2022 | ||
SI | 29.06.2022 | ||
SK | 29.06.2022 | ||
SM | 29.06.2022 | ||
IE | 05.09.2022 | ||
LU | 05.09.2022 | ||
BG | 29.09.2022 | ||
NO | 29.09.2022 | ||
CH | 30.09.2022 | ||
GR | 30.09.2022 | ||
LI | 30.09.2022 | ||
IS | 29.10.2022 | ||
PT | 31.10.2022 | ||
Former [2023/35] | AL | 29.06.2022 | |
AT | 29.06.2022 | ||
CZ | 29.06.2022 | ||
DK | 29.06.2022 | ||
EE | 29.06.2022 | ||
ES | 29.06.2022 | ||
FI | 29.06.2022 | ||
HR | 29.06.2022 | ||
LT | 29.06.2022 | ||
LV | 29.06.2022 | ||
MC | 29.06.2022 | ||
NL | 29.06.2022 | ||
PL | 29.06.2022 | ||
RO | 29.06.2022 | ||
RS | 29.06.2022 | ||
SE | 29.06.2022 | ||
SK | 29.06.2022 | ||
SM | 29.06.2022 | ||
IE | 05.09.2022 | ||
LU | 05.09.2022 | ||
BG | 29.09.2022 | ||
NO | 29.09.2022 | ||
CH | 30.09.2022 | ||
GR | 30.09.2022 | ||
LI | 30.09.2022 | ||
IS | 29.10.2022 | ||
PT | 31.10.2022 | ||
Former [2023/33] | AL | 29.06.2022 | |
AT | 29.06.2022 | ||
CZ | 29.06.2022 | ||
DK | 29.06.2022 | ||
EE | 29.06.2022 | ||
ES | 29.06.2022 | ||
FI | 29.06.2022 | ||
HR | 29.06.2022 | ||
LT | 29.06.2022 | ||
LV | 29.06.2022 | ||
MC | 29.06.2022 | ||
NL | 29.06.2022 | ||
PL | 29.06.2022 | ||
RO | 29.06.2022 | ||
RS | 29.06.2022 | ||
SE | 29.06.2022 | ||
SK | 29.06.2022 | ||
SM | 29.06.2022 | ||
IE | 05.09.2022 | ||
LU | 05.09.2022 | ||
BG | 29.09.2022 | ||
NO | 29.09.2022 | ||
GR | 30.09.2022 | ||
IS | 29.10.2022 | ||
PT | 31.10.2022 | ||
Former [2023/30] | AL | 29.06.2022 | |
AT | 29.06.2022 | ||
CZ | 29.06.2022 | ||
DK | 29.06.2022 | ||
EE | 29.06.2022 | ||
ES | 29.06.2022 | ||
FI | 29.06.2022 | ||
HR | 29.06.2022 | ||
LT | 29.06.2022 | ||
LV | 29.06.2022 | ||
MC | 29.06.2022 | ||
NL | 29.06.2022 | ||
PL | 29.06.2022 | ||
RO | 29.06.2022 | ||
RS | 29.06.2022 | ||
SE | 29.06.2022 | ||
SK | 29.06.2022 | ||
SM | 29.06.2022 | ||
LU | 05.09.2022 | ||
BG | 29.09.2022 | ||
NO | 29.09.2022 | ||
GR | 30.09.2022 | ||
IS | 29.10.2022 | ||
PT | 31.10.2022 | ||
Former [2023/22] | AL | 29.06.2022 | |
AT | 29.06.2022 | ||
CZ | 29.06.2022 | ||
DK | 29.06.2022 | ||
EE | 29.06.2022 | ||
ES | 29.06.2022 | ||
FI | 29.06.2022 | ||
HR | 29.06.2022 | ||
LT | 29.06.2022 | ||
LV | 29.06.2022 | ||
MC | 29.06.2022 | ||
NL | 29.06.2022 | ||
PL | 29.06.2022 | ||
RO | 29.06.2022 | ||
RS | 29.06.2022 | ||
SE | 29.06.2022 | ||
SK | 29.06.2022 | ||
SM | 29.06.2022 | ||
BG | 29.09.2022 | ||
NO | 29.09.2022 | ||
GR | 30.09.2022 | ||
IS | 29.10.2022 | ||
PT | 31.10.2022 | ||
Former [2023/21] | AL | 29.06.2022 | |
AT | 29.06.2022 | ||
DK | 29.06.2022 | ||
EE | 29.06.2022 | ||
ES | 29.06.2022 | ||
FI | 29.06.2022 | ||
HR | 29.06.2022 | ||
LT | 29.06.2022 | ||
LV | 29.06.2022 | ||
NL | 29.06.2022 | ||
PL | 29.06.2022 | ||
RO | 29.06.2022 | ||
RS | 29.06.2022 | ||
SE | 29.06.2022 | ||
SK | 29.06.2022 | ||
SM | 29.06.2022 | ||
BG | 29.09.2022 | ||
NO | 29.09.2022 | ||
GR | 30.09.2022 | ||
IS | 29.10.2022 | ||
PT | 31.10.2022 | ||
Former [2023/17] | AL | 29.06.2022 | |
AT | 29.06.2022 | ||
EE | 29.06.2022 | ||
ES | 29.06.2022 | ||
FI | 29.06.2022 | ||
HR | 29.06.2022 | ||
LT | 29.06.2022 | ||
LV | 29.06.2022 | ||
NL | 29.06.2022 | ||
PL | 29.06.2022 | ||
RO | 29.06.2022 | ||
RS | 29.06.2022 | ||
SE | 29.06.2022 | ||
SK | 29.06.2022 | ||
SM | 29.06.2022 | ||
BG | 29.09.2022 | ||
NO | 29.09.2022 | ||
GR | 30.09.2022 | ||
IS | 29.10.2022 | ||
PT | 31.10.2022 | ||
Former [2023/12] | AT | 29.06.2022 | |
EE | 29.06.2022 | ||
ES | 29.06.2022 | ||
FI | 29.06.2022 | ||
HR | 29.06.2022 | ||
LT | 29.06.2022 | ||
LV | 29.06.2022 | ||
NL | 29.06.2022 | ||
PL | 29.06.2022 | ||
RO | 29.06.2022 | ||
RS | 29.06.2022 | ||
SE | 29.06.2022 | ||
SK | 29.06.2022 | ||
SM | 29.06.2022 | ||
BG | 29.09.2022 | ||
NO | 29.09.2022 | ||
GR | 30.09.2022 | ||
IS | 29.10.2022 | ||
PT | 31.10.2022 | ||
Former [2023/11] | AT | 29.06.2022 | |
EE | 29.06.2022 | ||
ES | 29.06.2022 | ||
FI | 29.06.2022 | ||
HR | 29.06.2022 | ||
LT | 29.06.2022 | ||
LV | 29.06.2022 | ||
NL | 29.06.2022 | ||
PL | 29.06.2022 | ||
RO | 29.06.2022 | ||
RS | 29.06.2022 | ||
SE | 29.06.2022 | ||
SK | 29.06.2022 | ||
SM | 29.06.2022 | ||
BG | 29.09.2022 | ||
NO | 29.09.2022 | ||
GR | 30.09.2022 | ||
PT | 31.10.2022 | ||
Former [2023/09] | AT | 29.06.2022 | |
EE | 29.06.2022 | ||
ES | 29.06.2022 | ||
FI | 29.06.2022 | ||
HR | 29.06.2022 | ||
LT | 29.06.2022 | ||
LV | 29.06.2022 | ||
NL | 29.06.2022 | ||
RO | 29.06.2022 | ||
RS | 29.06.2022 | ||
SE | 29.06.2022 | ||
SK | 29.06.2022 | ||
SM | 29.06.2022 | ||
BG | 29.09.2022 | ||
NO | 29.09.2022 | ||
GR | 30.09.2022 | ||
PT | 31.10.2022 | ||
Former [2023/08] | AT | 29.06.2022 | |
ES | 29.06.2022 | ||
FI | 29.06.2022 | ||
HR | 29.06.2022 | ||
LT | 29.06.2022 | ||
LV | 29.06.2022 | ||
NL | 29.06.2022 | ||
RS | 29.06.2022 | ||
SE | 29.06.2022 | ||
BG | 29.09.2022 | ||
NO | 29.09.2022 | ||
GR | 30.09.2022 | ||
Former [2023/07] | AT | 29.06.2022 | |
FI | 29.06.2022 | ||
HR | 29.06.2022 | ||
LT | 29.06.2022 | ||
LV | 29.06.2022 | ||
NL | 29.06.2022 | ||
RS | 29.06.2022 | ||
SE | 29.06.2022 | ||
BG | 29.09.2022 | ||
NO | 29.09.2022 | ||
GR | 30.09.2022 | ||
Former [2023/02] | FI | 29.06.2022 | |
HR | 29.06.2022 | ||
LT | 29.06.2022 | ||
LV | 29.06.2022 | ||
NL | 29.06.2022 | ||
RS | 29.06.2022 | ||
SE | 29.06.2022 | ||
BG | 29.09.2022 | ||
NO | 29.09.2022 | ||
GR | 30.09.2022 | ||
Former [2022/50] | FI | 29.06.2022 | |
HR | 29.06.2022 | ||
LT | 29.06.2022 | ||
LV | 29.06.2022 | ||
RS | 29.06.2022 | ||
SE | 29.06.2022 | ||
BG | 29.09.2022 | ||
NO | 29.09.2022 | ||
GR | 30.09.2022 | ||
Former [2022/49] | FI | 29.06.2022 | |
HR | 29.06.2022 | ||
LT | 29.06.2022 | ||
LV | 29.06.2022 | ||
SE | 29.06.2022 | ||
BG | 29.09.2022 | ||
NO | 29.09.2022 | ||
GR | 30.09.2022 | ||
Former [2022/47] | FI | 29.06.2022 | |
LT | 29.06.2022 | ||
SE | 29.06.2022 | ||
NO | 29.09.2022 | Documents cited: | Search | [X]DE102008003929 (KOITO MFG CO LTD [JP]) [X] 1 * figures 1-3 *; | [X]US2012069576 (CHANG HSIU-PING [TW]) [X] 1 * paragraph [0014]; figures 1,2 *; | [X]JP2014063604 (ICHIKOH INDUSTRIES LTD) [X] 1 * the whole document *; | [XAY]US2014146555 (CHOI KOOK YOUNG [KR], et al) [X] 1-8,11 * paragraph [0032] - paragraph [0060]; figures 1-10 * [A] 10 [Y] 9; | [Y]DE102013002965 (DOCTER OPTICS SE [DE]) [Y] 9* paragraphs [0025] , [0026]; claim 1 *; | [X]DE202018002427U (HYUNDAI MOBIS CO LTD [KR]) [X] 1 * paragraph [0017] - paragraph [0042]; figures 1-6c * | Examination | EP2818792 | DE202018002427U | EP3453951 | by applicant | FR3039883 |