blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3656450

EP3656450 - SUSPENSION ASSEMBLY FOR A SNOW SPORTS BOARD [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  03.06.2022
Database last updated on 02.09.2024
FormerThe patent has been granted
Status updated on  25.06.2021
FormerGrant of patent is intended
Status updated on  11.03.2021
FormerRequest for examination was made
Status updated on  18.09.2020
FormerThe application has been published
Status updated on  24.04.2020
Most recent event   Tooltip14.06.2024Lapse of the patent in a contracting state
New state(s): TR
published on 17.07.2024  [2024/29]
Applicant(s)For all designated states
Yak Board, LLC
2760 Amaranda Court
Naples, FL 34114 / US
[2021/33]
Former [2020/22]For all designated states
Yak Board, LLC.
84 Beech Hill Road
Exeter, New Hampshire 03833 / US
Inventor(s)01 / Thompson, Robert W.
Yak Board LLC
84 Beech Hill Road
Exeter, New Hampshire NH 03833 / US
 [2020/22]
Representative(s)AWA Sweden AB
P.O. Box 11394
404 28 Göteborg / SE
[2020/22]
Application number, filing date19202457.810.10.2019
[2020/22]
Priority number, dateUS201862767739P15.11.2018         Original published format: US 201862767739 P
[2020/22]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3656450
Date:27.05.2020
Language:EN
[2020/22]
Type: B1 Patent specification 
No.:EP3656450
Date:28.07.2021
Language:EN
[2021/30]
Type: B8 Corrected title page of specification 
No.:EP3656450
Date:08.09.2021
[2021/36]
Search report(s)(Supplementary) European search report - dispatched on:EP23.04.2020
ClassificationIPC:A63C5/03, A63C5/075, B62B13/04, B62B17/06
[2021/08]
CPC:
A63C5/03 (EP); A63C5/075 (EP); B62B13/043 (EP);
B62B17/062 (EP); B62B17/067 (EP); A63C2201/10 (EP);
A63C2203/20 (EP) (-)
Former IPC [2020/22]A63C5/03, A63C5/075, B62B13/04
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/43]
Former [2020/22]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:DÄMPFUNGSANORDNUNG FÜR EIN WINTERSPORTBRETT[2020/22]
English:SUSPENSION ASSEMBLY FOR A SNOW SPORTS BOARD[2020/22]
French:ENSEMBLE DE SUSPENSION POUR PLANCHE DE SPORTS D'HIVER[2020/22]
Examination procedure14.09.2020Examination requested  [2020/43]
14.09.2020Date on which the examining division has become responsible
15.09.2020Amendment by applicant (claims and/or description)
12.03.2021Communication of intention to grant the patent
18.06.2021Fee for grant paid
18.06.2021Fee for publishing/printing paid
18.06.2021Receipt of the translation of the claim(s)
Opposition(s)29.04.2022No opposition filed within time limit [2022/27]
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU10.10.2019
AL28.07.2021
CY28.07.2021
CZ28.07.2021
DK28.07.2021
EE28.07.2021
ES28.07.2021
FI28.07.2021
HR28.07.2021
LT28.07.2021
LV28.07.2021
MC28.07.2021
MK28.07.2021
NL28.07.2021
PL28.07.2021
RO28.07.2021
RS28.07.2021
SE28.07.2021
SI28.07.2021
SK28.07.2021
SM28.07.2021
TR28.07.2021
IE10.10.2021
LU10.10.2021
BG28.10.2021
NO28.10.2021
GR29.10.2021
BE31.10.2021
IS28.11.2021
PT29.11.2021
[2024/29]
Former [2024/23]HU10.10.2019
AL28.07.2021
CY28.07.2021
CZ28.07.2021
DK28.07.2021
EE28.07.2021
ES28.07.2021
FI28.07.2021
HR28.07.2021
LT28.07.2021
LV28.07.2021
MC28.07.2021
MK28.07.2021
NL28.07.2021
PL28.07.2021
RO28.07.2021
RS28.07.2021
SE28.07.2021
SI28.07.2021
SK28.07.2021
SM28.07.2021
IE10.10.2021
LU10.10.2021
BG28.10.2021
NO28.10.2021
GR29.10.2021
BE31.10.2021
IS28.11.2021
PT29.11.2021
Former [2023/33]HU10.10.2019
AL28.07.2021
CY28.07.2021
CZ28.07.2021
DK28.07.2021
EE28.07.2021
ES28.07.2021
FI28.07.2021
HR28.07.2021
LT28.07.2021
LV28.07.2021
MC28.07.2021
NL28.07.2021
PL28.07.2021
RO28.07.2021
RS28.07.2021
SE28.07.2021
SI28.07.2021
SK28.07.2021
SM28.07.2021
IE10.10.2021
LU10.10.2021
BG28.10.2021
NO28.10.2021
GR29.10.2021
BE31.10.2021
IS28.11.2021
PT29.11.2021
Former [2023/30]AL28.07.2021
CY28.07.2021
CZ28.07.2021
DK28.07.2021
EE28.07.2021
ES28.07.2021
FI28.07.2021
HR28.07.2021
LT28.07.2021
LV28.07.2021
MC28.07.2021
NL28.07.2021
PL28.07.2021
RO28.07.2021
RS28.07.2021
SE28.07.2021
SI28.07.2021
SK28.07.2021
SM28.07.2021
IE10.10.2021
LU10.10.2021
BG28.10.2021
NO28.10.2021
GR29.10.2021
BE31.10.2021
IS28.11.2021
PT29.11.2021
Former [2022/48]AL28.07.2021
CZ28.07.2021
DK28.07.2021
EE28.07.2021
ES28.07.2021
FI28.07.2021
HR28.07.2021
LT28.07.2021
LV28.07.2021
MC28.07.2021
NL28.07.2021
PL28.07.2021
RO28.07.2021
RS28.07.2021
SE28.07.2021
SI28.07.2021
SK28.07.2021
SM28.07.2021
IE10.10.2021
LU10.10.2021
BG28.10.2021
NO28.10.2021
GR29.10.2021
BE31.10.2021
IS28.11.2021
PT29.11.2021
Former [2022/35]AL28.07.2021
CZ28.07.2021
DK28.07.2021
EE28.07.2021
ES28.07.2021
FI28.07.2021
HR28.07.2021
LT28.07.2021
LV28.07.2021
MC28.07.2021
NL28.07.2021
PL28.07.2021
RO28.07.2021
RS28.07.2021
SE28.07.2021
SI28.07.2021
SK28.07.2021
SM28.07.2021
LU10.10.2021
BG28.10.2021
NO28.10.2021
GR29.10.2021
BE31.10.2021
IS28.11.2021
PT29.11.2021
Former [2022/33]AL28.07.2021
CZ28.07.2021
DK28.07.2021
EE28.07.2021
ES28.07.2021
FI28.07.2021
HR28.07.2021
LT28.07.2021
LV28.07.2021
MC28.07.2021
NL28.07.2021
PL28.07.2021
RO28.07.2021
RS28.07.2021
SE28.07.2021
SI28.07.2021
SK28.07.2021
SM28.07.2021
BG28.10.2021
NO28.10.2021
GR29.10.2021
BE31.10.2021
IS28.11.2021
PT29.11.2021
Former [2022/29]AL28.07.2021
CZ28.07.2021
DK28.07.2021
EE28.07.2021
ES28.07.2021
FI28.07.2021
HR28.07.2021
LT28.07.2021
LV28.07.2021
NL28.07.2021
PL28.07.2021
RO28.07.2021
RS28.07.2021
SE28.07.2021
SI28.07.2021
SK28.07.2021
SM28.07.2021
BG28.10.2021
NO28.10.2021
GR29.10.2021
IS28.11.2021
PT29.11.2021
Former [2022/25]CZ28.07.2021
DK28.07.2021
EE28.07.2021
ES28.07.2021
FI28.07.2021
HR28.07.2021
LT28.07.2021
LV28.07.2021
NL28.07.2021
PL28.07.2021
RO28.07.2021
RS28.07.2021
SE28.07.2021
SK28.07.2021
SM28.07.2021
BG28.10.2021
NO28.10.2021
GR29.10.2021
IS28.11.2021
PT29.11.2021
Former [2022/24]CZ28.07.2021
DK28.07.2021
EE28.07.2021
ES28.07.2021
FI28.07.2021
HR28.07.2021
LT28.07.2021
LV28.07.2021
NL28.07.2021
PL28.07.2021
RO28.07.2021
RS28.07.2021
SE28.07.2021
SK28.07.2021
BG28.10.2021
NO28.10.2021
GR29.10.2021
IS28.11.2021
PT29.11.2021
Former [2022/21]DK28.07.2021
ES28.07.2021
FI28.07.2021
HR28.07.2021
LT28.07.2021
LV28.07.2021
NL28.07.2021
PL28.07.2021
RS28.07.2021
SE28.07.2021
BG28.10.2021
NO28.10.2021
GR29.10.2021
IS28.11.2021
PT29.11.2021
Former [2022/10]ES28.07.2021
FI28.07.2021
HR28.07.2021
LT28.07.2021
LV28.07.2021
NL28.07.2021
PL28.07.2021
RS28.07.2021
SE28.07.2021
BG28.10.2021
NO28.10.2021
GR29.10.2021
IS28.11.2021
PT29.11.2021
Former [2022/09]ES28.07.2021
FI28.07.2021
LT28.07.2021
NL28.07.2021
RS28.07.2021
SE28.07.2021
BG28.10.2021
NO28.10.2021
PT29.11.2021
Former [2022/08]ES28.07.2021
FI28.07.2021
LT28.07.2021
NL28.07.2021
SE28.07.2021
BG28.10.2021
NO28.10.2021
Former [2022/07]LT28.07.2021
NL28.07.2021
NO28.10.2021
Documents cited:Search[XA]WO2018075348  (YAK BOARD LLC [US]) [X] 1,2,4-6,12,13,15 * paragraphs [0081] - [0086]; figures 16,17,18 * [A] 3,7-11,14;
 [A]US2006027982  (SMITH DAVID [US], et al) [A] 10 * paragraphs [0030] - [0034]; figures 2,3 *;
 [A]WO03101554  (GEARY BRAD [US]) [A] 1-15 * page 9, line 22 - page 9, line 30; figures 21,22 *;
 [A]US2009140503  (KOLESAR ROBERT [US], et al) [A] 1-15 * paragraphs [0084] - [0087]; figures 14A, 14B *;
 [A]US2016229442  (RAPP JEFF [US]) [A] 1-15 * paragraphs [0086] - [0091]; figure 10 *;
 [A]FR2813021  (TESSIER PIERRE [FR]) [A] 1-15 * figures 1-4; claim 1 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.