EP3640739 - IMAGE FORMING APPARATUS AND IMAGE FORMING METHOD [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 18.03.2022 Database last updated on 16.11.2024 | |
Former | The patent has been granted Status updated on 09.04.2021 | ||
Former | Grant of patent is intended Status updated on 06.12.2020 | ||
Former | Request for examination was made Status updated on 30.10.2020 | ||
Former | The application has been published Status updated on 20.03.2020 | Most recent event Tooltip | 13.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 16.10.2024 [2024/42] | Applicant(s) | For all designated states Toshiba TEC Kabushiki Kaisha 1-11-1, Osaki Shinagawa-ku Tokyo 141-8562 / JP | [2020/17] | Inventor(s) | 01 /
FUKAYA, Hideaki c/o IP Division, Toshiba Tec Kabushiki Kaisha 1-11-1, Osaki Shinagawa-ku, Tokyo 141-8562 / JP | [2020/17] | Representative(s) | Bandpay & Greuter 11 rue Christophe Colomb 75008 Paris / FR | [N/P] |
Former [2020/17] | Bandpay & Greuter 30, rue Notre-Dame des Victoires 75002 Paris / FR | Application number, filing date | 19202575.7 | 10.10.2019 | [2020/17] | Priority number, date | US201816164901 | 19.10.2018 Original published format: US201816164901 | [2020/17] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3640739 | Date: | 22.04.2020 | Language: | EN | [2020/17] | Type: | B1 Patent specification | No.: | EP3640739 | Date: | 12.05.2021 | Language: | EN | [2021/19] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 11.03.2020 | Classification | IPC: | G03G15/00 | [2020/17] | CPC: |
G03G15/502 (EP,US);
G03G15/5016 (CN,US);
G03G15/50 (CN);
G03G15/5029 (US);
G03G15/5066 (US);
G03G2215/00025 (US);
G03G2215/00489 (US)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/49] |
Former [2020/17] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | BILDERZEUGUNGSVORRICHTUNG UND BILDERZEUGUNGSVERFAHREN | [2020/17] | English: | IMAGE FORMING APPARATUS AND IMAGE FORMING METHOD | [2020/17] | French: | APPAREIL DE FORMATION D'IMAGES ET PROCÉDÉ DE FORMATION D'IMAGES | [2020/17] | Examination procedure | 01.10.2020 | Amendment by applicant (claims and/or description) | 22.10.2020 | Examination requested [2020/49] | 22.10.2020 | Date on which the examining division has become responsible | 07.12.2020 | Communication of intention to grant the patent | 06.04.2021 | Fee for grant paid | 06.04.2021 | Fee for publishing/printing paid | 06.04.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 15.02.2022 | No opposition filed within time limit [2022/16] |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 10.10.2019 | AL | 12.05.2021 | AT | 12.05.2021 | CY | 12.05.2021 | CZ | 12.05.2021 | DK | 12.05.2021 | EE | 12.05.2021 | ES | 12.05.2021 | FI | 12.05.2021 | HR | 12.05.2021 | IT | 12.05.2021 | LT | 12.05.2021 | LV | 12.05.2021 | MC | 12.05.2021 | MK | 12.05.2021 | MT | 12.05.2021 | NL | 12.05.2021 | PL | 12.05.2021 | RO | 12.05.2021 | RS | 12.05.2021 | SE | 12.05.2021 | SI | 12.05.2021 | SK | 12.05.2021 | SM | 12.05.2021 | TR | 12.05.2021 | BG | 12.08.2021 | NO | 12.08.2021 | GR | 13.08.2021 | IS | 12.09.2021 | PT | 13.09.2021 | IE | 10.10.2021 | LU | 10.10.2021 | BE | 31.10.2021 | [2024/42] |
Former [2024/29] | HU | 10.10.2019 | |
AL | 12.05.2021 | ||
AT | 12.05.2021 | ||
CY | 12.05.2021 | ||
CZ | 12.05.2021 | ||
DK | 12.05.2021 | ||
EE | 12.05.2021 | ||
ES | 12.05.2021 | ||
FI | 12.05.2021 | ||
HR | 12.05.2021 | ||
IT | 12.05.2021 | ||
LT | 12.05.2021 | ||
LV | 12.05.2021 | ||
MC | 12.05.2021 | ||
MK | 12.05.2021 | ||
NL | 12.05.2021 | ||
PL | 12.05.2021 | ||
RO | 12.05.2021 | ||
RS | 12.05.2021 | ||
SE | 12.05.2021 | ||
SI | 12.05.2021 | ||
SK | 12.05.2021 | ||
SM | 12.05.2021 | ||
TR | 12.05.2021 | ||
BG | 12.08.2021 | ||
NO | 12.08.2021 | ||
GR | 13.08.2021 | ||
IS | 12.09.2021 | ||
PT | 13.09.2021 | ||
IE | 10.10.2021 | ||
LU | 10.10.2021 | ||
BE | 31.10.2021 | ||
Former [2024/23] | HU | 10.10.2019 | |
AL | 12.05.2021 | ||
AT | 12.05.2021 | ||
CY | 12.05.2021 | ||
CZ | 12.05.2021 | ||
DK | 12.05.2021 | ||
EE | 12.05.2021 | ||
ES | 12.05.2021 | ||
FI | 12.05.2021 | ||
HR | 12.05.2021 | ||
IT | 12.05.2021 | ||
LT | 12.05.2021 | ||
LV | 12.05.2021 | ||
MC | 12.05.2021 | ||
MK | 12.05.2021 | ||
NL | 12.05.2021 | ||
PL | 12.05.2021 | ||
RO | 12.05.2021 | ||
RS | 12.05.2021 | ||
SE | 12.05.2021 | ||
SI | 12.05.2021 | ||
SK | 12.05.2021 | ||
SM | 12.05.2021 | ||
BG | 12.08.2021 | ||
NO | 12.08.2021 | ||
GR | 13.08.2021 | ||
IS | 12.09.2021 | ||
PT | 13.09.2021 | ||
IE | 10.10.2021 | ||
LU | 10.10.2021 | ||
BE | 31.10.2021 | ||
Former [2023/33] | HU | 10.10.2019 | |
AL | 12.05.2021 | ||
AT | 12.05.2021 | ||
CY | 12.05.2021 | ||
CZ | 12.05.2021 | ||
DK | 12.05.2021 | ||
EE | 12.05.2021 | ||
ES | 12.05.2021 | ||
FI | 12.05.2021 | ||
HR | 12.05.2021 | ||
IT | 12.05.2021 | ||
LT | 12.05.2021 | ||
LV | 12.05.2021 | ||
MC | 12.05.2021 | ||
NL | 12.05.2021 | ||
PL | 12.05.2021 | ||
RO | 12.05.2021 | ||
RS | 12.05.2021 | ||
SE | 12.05.2021 | ||
SI | 12.05.2021 | ||
SK | 12.05.2021 | ||
SM | 12.05.2021 | ||
BG | 12.08.2021 | ||
NO | 12.08.2021 | ||
GR | 13.08.2021 | ||
IS | 12.09.2021 | ||
PT | 13.09.2021 | ||
IE | 10.10.2021 | ||
LU | 10.10.2021 | ||
BE | 31.10.2021 | ||
Former [2023/30] | AL | 12.05.2021 | |
AT | 12.05.2021 | ||
CY | 12.05.2021 | ||
CZ | 12.05.2021 | ||
DK | 12.05.2021 | ||
EE | 12.05.2021 | ||
ES | 12.05.2021 | ||
FI | 12.05.2021 | ||
HR | 12.05.2021 | ||
IT | 12.05.2021 | ||
LT | 12.05.2021 | ||
LV | 12.05.2021 | ||
MC | 12.05.2021 | ||
NL | 12.05.2021 | ||
PL | 12.05.2021 | ||
RO | 12.05.2021 | ||
RS | 12.05.2021 | ||
SE | 12.05.2021 | ||
SI | 12.05.2021 | ||
SK | 12.05.2021 | ||
SM | 12.05.2021 | ||
BG | 12.08.2021 | ||
NO | 12.08.2021 | ||
GR | 13.08.2021 | ||
IS | 12.09.2021 | ||
PT | 13.09.2021 | ||
IE | 10.10.2021 | ||
LU | 10.10.2021 | ||
BE | 31.10.2021 | ||
Former [2022/48] | AL | 12.05.2021 | |
AT | 12.05.2021 | ||
CZ | 12.05.2021 | ||
DK | 12.05.2021 | ||
EE | 12.05.2021 | ||
ES | 12.05.2021 | ||
FI | 12.05.2021 | ||
HR | 12.05.2021 | ||
IT | 12.05.2021 | ||
LT | 12.05.2021 | ||
LV | 12.05.2021 | ||
MC | 12.05.2021 | ||
NL | 12.05.2021 | ||
PL | 12.05.2021 | ||
RO | 12.05.2021 | ||
RS | 12.05.2021 | ||
SE | 12.05.2021 | ||
SI | 12.05.2021 | ||
SK | 12.05.2021 | ||
SM | 12.05.2021 | ||
BG | 12.08.2021 | ||
NO | 12.08.2021 | ||
GR | 13.08.2021 | ||
IS | 12.09.2021 | ||
PT | 13.09.2021 | ||
IE | 10.10.2021 | ||
LU | 10.10.2021 | ||
BE | 31.10.2021 | ||
Former [2022/36] | AL | 12.05.2021 | |
AT | 12.05.2021 | ||
CZ | 12.05.2021 | ||
DK | 12.05.2021 | ||
EE | 12.05.2021 | ||
ES | 12.05.2021 | ||
FI | 12.05.2021 | ||
HR | 12.05.2021 | ||
IT | 12.05.2021 | ||
LT | 12.05.2021 | ||
LV | 12.05.2021 | ||
MC | 12.05.2021 | ||
NL | 12.05.2021 | ||
PL | 12.05.2021 | ||
RO | 12.05.2021 | ||
RS | 12.05.2021 | ||
SE | 12.05.2021 | ||
SI | 12.05.2021 | ||
SK | 12.05.2021 | ||
SM | 12.05.2021 | ||
BG | 12.08.2021 | ||
NO | 12.08.2021 | ||
GR | 13.08.2021 | ||
IS | 12.09.2021 | ||
PT | 13.09.2021 | ||
LU | 10.10.2021 | ||
BE | 31.10.2021 | ||
Former [2022/35] | AL | 12.05.2021 | |
AT | 12.05.2021 | ||
CZ | 12.05.2021 | ||
DK | 12.05.2021 | ||
EE | 12.05.2021 | ||
ES | 12.05.2021 | ||
FI | 12.05.2021 | ||
HR | 12.05.2021 | ||
LT | 12.05.2021 | ||
LV | 12.05.2021 | ||
MC | 12.05.2021 | ||
NL | 12.05.2021 | ||
PL | 12.05.2021 | ||
RO | 12.05.2021 | ||
RS | 12.05.2021 | ||
SE | 12.05.2021 | ||
SI | 12.05.2021 | ||
SK | 12.05.2021 | ||
SM | 12.05.2021 | ||
BG | 12.08.2021 | ||
NO | 12.08.2021 | ||
GR | 13.08.2021 | ||
IS | 12.09.2021 | ||
PT | 13.09.2021 | ||
LU | 10.10.2021 | ||
BE | 31.10.2021 | ||
Former [2022/33] | AL | 12.05.2021 | |
AT | 12.05.2021 | ||
CZ | 12.05.2021 | ||
DK | 12.05.2021 | ||
EE | 12.05.2021 | ||
ES | 12.05.2021 | ||
FI | 12.05.2021 | ||
HR | 12.05.2021 | ||
LT | 12.05.2021 | ||
LV | 12.05.2021 | ||
MC | 12.05.2021 | ||
NL | 12.05.2021 | ||
PL | 12.05.2021 | ||
RO | 12.05.2021 | ||
RS | 12.05.2021 | ||
SE | 12.05.2021 | ||
SI | 12.05.2021 | ||
SK | 12.05.2021 | ||
SM | 12.05.2021 | ||
BG | 12.08.2021 | ||
NO | 12.08.2021 | ||
GR | 13.08.2021 | ||
IS | 12.09.2021 | ||
PT | 13.09.2021 | ||
BE | 31.10.2021 | ||
Former [2022/29] | AL | 12.05.2021 | |
AT | 12.05.2021 | ||
CZ | 12.05.2021 | ||
DK | 12.05.2021 | ||
EE | 12.05.2021 | ||
ES | 12.05.2021 | ||
FI | 12.05.2021 | ||
HR | 12.05.2021 | ||
LT | 12.05.2021 | ||
LV | 12.05.2021 | ||
NL | 12.05.2021 | ||
PL | 12.05.2021 | ||
RO | 12.05.2021 | ||
RS | 12.05.2021 | ||
SE | 12.05.2021 | ||
SI | 12.05.2021 | ||
SK | 12.05.2021 | ||
SM | 12.05.2021 | ||
BG | 12.08.2021 | ||
NO | 12.08.2021 | ||
GR | 13.08.2021 | ||
IS | 12.09.2021 | ||
PT | 13.09.2021 | ||
Former [2022/26] | AL | 12.05.2021 | |
AT | 12.05.2021 | ||
CZ | 12.05.2021 | ||
DK | 12.05.2021 | ||
EE | 12.05.2021 | ||
ES | 12.05.2021 | ||
FI | 12.05.2021 | ||
HR | 12.05.2021 | ||
LT | 12.05.2021 | ||
LV | 12.05.2021 | ||
NL | 12.05.2021 | ||
PL | 12.05.2021 | ||
RO | 12.05.2021 | ||
RS | 12.05.2021 | ||
SE | 12.05.2021 | ||
SK | 12.05.2021 | ||
SM | 12.05.2021 | ||
BG | 12.08.2021 | ||
NO | 12.08.2021 | ||
GR | 13.08.2021 | ||
IS | 12.09.2021 | ||
PT | 13.09.2021 | ||
Former [2022/23] | AT | 12.05.2021 | |
CZ | 12.05.2021 | ||
DK | 12.05.2021 | ||
EE | 12.05.2021 | ||
ES | 12.05.2021 | ||
FI | 12.05.2021 | ||
HR | 12.05.2021 | ||
LT | 12.05.2021 | ||
LV | 12.05.2021 | ||
NL | 12.05.2021 | ||
PL | 12.05.2021 | ||
RO | 12.05.2021 | ||
RS | 12.05.2021 | ||
SE | 12.05.2021 | ||
SK | 12.05.2021 | ||
SM | 12.05.2021 | ||
BG | 12.08.2021 | ||
NO | 12.08.2021 | ||
GR | 13.08.2021 | ||
IS | 12.09.2021 | ||
PT | 13.09.2021 | ||
Former [2022/10] | AT | 12.05.2021 | |
CZ | 12.05.2021 | ||
DK | 12.05.2021 | ||
EE | 12.05.2021 | ||
ES | 12.05.2021 | ||
FI | 12.05.2021 | ||
HR | 12.05.2021 | ||
LT | 12.05.2021 | ||
LV | 12.05.2021 | ||
NL | 12.05.2021 | ||
PL | 12.05.2021 | ||
RO | 12.05.2021 | ||
RS | 12.05.2021 | ||
SE | 12.05.2021 | ||
SK | 12.05.2021 | ||
SM | 12.05.2021 | ||
BG | 12.08.2021 | ||
NO | 12.08.2021 | ||
GR | 13.08.2021 | ||
PT | 13.09.2021 | ||
IS | 22.12.2021 | ||
Former [2022/09] | AT | 12.05.2021 | |
CZ | 12.05.2021 | ||
DK | 12.05.2021 | ||
ES | 12.05.2021 | ||
FI | 12.05.2021 | ||
HR | 12.05.2021 | ||
LT | 12.05.2021 | ||
LV | 12.05.2021 | ||
NL | 12.05.2021 | ||
PL | 12.05.2021 | ||
RO | 12.05.2021 | ||
RS | 12.05.2021 | ||
SE | 12.05.2021 | ||
SK | 12.05.2021 | ||
SM | 12.05.2021 | ||
BG | 12.08.2021 | ||
NO | 12.08.2021 | ||
GR | 13.08.2021 | ||
IS | 12.09.2021 | ||
PT | 13.09.2021 | ||
Former [2022/08] | AT | 12.05.2021 | |
CZ | 12.05.2021 | ||
DK | 12.05.2021 | ||
ES | 12.05.2021 | ||
FI | 12.05.2021 | ||
HR | 12.05.2021 | ||
LT | 12.05.2021 | ||
LV | 12.05.2021 | ||
NL | 12.05.2021 | ||
PL | 12.05.2021 | ||
RS | 12.05.2021 | ||
SE | 12.05.2021 | ||
SM | 12.05.2021 | ||
BG | 12.08.2021 | ||
NO | 12.08.2021 | ||
GR | 13.08.2021 | ||
IS | 12.09.2021 | ||
PT | 13.09.2021 | ||
Former [2022/07] | AT | 12.05.2021 | |
FI | 12.05.2021 | ||
HR | 12.05.2021 | ||
LT | 12.05.2021 | ||
LV | 12.05.2021 | ||
NL | 12.05.2021 | ||
PL | 12.05.2021 | ||
RS | 12.05.2021 | ||
SE | 12.05.2021 | ||
SM | 12.05.2021 | ||
BG | 12.08.2021 | ||
NO | 12.08.2021 | ||
GR | 13.08.2021 | ||
IS | 12.09.2021 | ||
PT | 13.09.2021 | ||
Former [2022/04] | AT | 12.05.2021 | |
FI | 12.05.2021 | ||
HR | 12.05.2021 | ||
LT | 12.05.2021 | ||
LV | 12.05.2021 | ||
NL | 12.05.2021 | ||
PL | 12.05.2021 | ||
RS | 12.05.2021 | ||
SE | 12.05.2021 | ||
BG | 12.08.2021 | ||
NO | 12.08.2021 | ||
GR | 13.08.2021 | ||
IS | 12.09.2021 | ||
PT | 13.09.2021 | ||
Former [2021/52] | AT | 12.05.2021 | |
FI | 12.05.2021 | ||
HR | 12.05.2021 | ||
LT | 12.05.2021 | ||
LV | 12.05.2021 | ||
PL | 12.05.2021 | ||
RS | 12.05.2021 | ||
SE | 12.05.2021 | ||
BG | 12.08.2021 | ||
NO | 12.08.2021 | ||
GR | 13.08.2021 | ||
IS | 12.09.2021 | ||
PT | 13.09.2021 | ||
Former [2021/51] | AT | 12.05.2021 | |
FI | 12.05.2021 | ||
HR | 12.05.2021 | ||
LT | 12.05.2021 | ||
LV | 12.05.2021 | ||
RS | 12.05.2021 | ||
SE | 12.05.2021 | ||
BG | 12.08.2021 | ||
NO | 12.08.2021 | ||
GR | 13.08.2021 | ||
IS | 12.09.2021 | ||
PT | 13.09.2021 | ||
Former [2021/50] | AT | 12.05.2021 | |
FI | 12.05.2021 | ||
HR | 12.05.2021 | ||
LT | 12.05.2021 | ||
LV | 12.05.2021 | ||
SE | 12.05.2021 | ||
BG | 12.08.2021 | ||
NO | 12.08.2021 | ||
GR | 13.08.2021 | ||
PT | 13.09.2021 | ||
Former [2021/49] | AT | 12.05.2021 | |
FI | 12.05.2021 | ||
HR | 12.05.2021 | ||
LT | 12.05.2021 | ||
LV | 12.05.2021 | ||
SE | 12.05.2021 | ||
BG | 12.08.2021 | ||
NO | 12.08.2021 | ||
GR | 13.08.2021 | ||
Former [2021/47] | AT | 12.05.2021 | |
FI | 12.05.2021 | ||
LT | 12.05.2021 | ||
BG | 12.08.2021 | ||
Former [2021/46] | AT | 12.05.2021 | |
FI | 12.05.2021 | ||
LT | 12.05.2021 | Documents cited: | Search | [XI]JPH09198191 (FUJI XEROX CO LTD) [X] 1,11,14,15 * paragraph [0001] * * abstract * [I] 2-10,12,13; | [A]US2009052930 (YOSHIMURA KAZUTOSHI [JP], et al) [A] 1-15* the whole document *; | [A]EP2105801 (BROTHER IND LTD [JP]) [A] 1-15 * the whole document * |