EP3640485 - SYSTEM AND METHOD FOR CONNECTING TWO COMPONENTS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 06.05.2022 Database last updated on 18.11.2024 | |
Former | The patent has been granted Status updated on 28.05.2021 | ||
Former | Grant of patent is intended Status updated on 21.04.2021 | ||
Former | Request for examination was made Status updated on 30.10.2020 | ||
Former | The application has been published Status updated on 20.03.2020 | Most recent event Tooltip | 13.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 16.10.2024 [2024/42] | Applicant(s) | For all designated states Airbus Operations GmbH Kreetslag 10 21129 Hamburg / DE | [2020/17] | Inventor(s) | 01 /
Schulze, Wolfgang Airbus Operations GmbH Kreetslag 10 21129 Hamburg / DE | 02 /
Eberle, Martin Airbus Operations GmbH Kreetslag 10 21129 Hamburg / DE | [2020/17] | Application number, filing date | 19203994.9 | 18.10.2019 | [2020/17] | Priority number, date | DE201810125979 | 19.10.2018 Original published format: DE102018125979 | [2020/17] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | EP3640485 | Date: | 22.04.2020 | Language: | DE | [2020/17] | Type: | B1 Patent specification | No.: | EP3640485 | Date: | 30.06.2021 | Language: | DE | [2021/26] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 25.03.2020 | Classification | IPC: | B64C1/14, B64F5/10, F16B11/00, B29C65/00, B29C65/48, // B29L12/00, B29L31/30, B29L31/00 | [2021/15] | CPC: |
F16B11/006 (EP,CN);
B29C66/721 (EP,US);
B29C65/48 (US);
B29C66/81455 (EP,US);
B64C1/1484 (EP);
B64F5/10 (EP);
B29C65/4835 (EP);
B29C66/112 (EP);
B29C66/131 (EP);
B29C66/532 (EP);
B29C66/61 (EP);
B29C66/7392 (EP);
B29C66/742 (EP);
B29C66/8223 (EP);
B29C66/8242 (EP);
B29C66/9221 (EP);
B29C66/9241 (EP);
B29C66/961 (EP);
B29L2012/00 (EP);
B29L2031/3076 (US);
B29L2031/3082 (EP);
B29L2031/778 (EP)
(-)
|
Former IPC [2020/17] | F16B11/00, B29C65/48, B29C65/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/49] |
Former [2020/17] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | VERFAHREN UND SYSTEM ZUM VERBINDEN ZWEIER BAUTEILE | [2020/17] | English: | SYSTEM AND METHOD FOR CONNECTING TWO COMPONENTS | [2020/17] | French: | PROCÉDÉ ET SYSTÈME DE RACCORDEMENT DE DEUX COMPOSANTS | [2020/17] | Examination procedure | 19.10.2020 | Amendment by applicant (claims and/or description) | 22.10.2020 | Examination requested [2020/49] | 22.10.2020 | Date on which the examining division has become responsible | 22.04.2021 | Communication of intention to grant the patent | 20.05.2021 | Fee for grant paid | 20.05.2021 | Fee for publishing/printing paid | 20.05.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 31.03.2022 | No opposition filed within time limit [2022/23] |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 18.10.2019 | AL | 30.06.2021 | CY | 30.06.2021 | CZ | 30.06.2021 | DK | 30.06.2021 | EE | 30.06.2021 | ES | 30.06.2021 | FI | 30.06.2021 | HR | 30.06.2021 | IT | 30.06.2021 | LT | 30.06.2021 | LV | 30.06.2021 | MC | 30.06.2021 | MK | 30.06.2021 | MT | 30.06.2021 | NL | 30.06.2021 | PL | 30.06.2021 | RO | 30.06.2021 | RS | 30.06.2021 | SE | 30.06.2021 | SI | 30.06.2021 | SK | 30.06.2021 | SM | 30.06.2021 | TR | 30.06.2021 | BG | 30.09.2021 | NO | 30.09.2021 | GR | 01.10.2021 | IE | 18.10.2021 | LU | 18.10.2021 | IS | 30.10.2021 | BE | 31.10.2021 | PT | 02.11.2021 | [2024/42] |
Former [2024/29] | HU | 18.10.2019 | |
AL | 30.06.2021 | ||
CY | 30.06.2021 | ||
CZ | 30.06.2021 | ||
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
IT | 30.06.2021 | ||
LT | 30.06.2021 | ||
LV | 30.06.2021 | ||
MC | 30.06.2021 | ||
MK | 30.06.2021 | ||
NL | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SI | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
TR | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
IE | 18.10.2021 | ||
LU | 18.10.2021 | ||
IS | 30.10.2021 | ||
BE | 31.10.2021 | ||
PT | 02.11.2021 | ||
Former [2024/23] | HU | 18.10.2019 | |
AL | 30.06.2021 | ||
CY | 30.06.2021 | ||
CZ | 30.06.2021 | ||
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
IT | 30.06.2021 | ||
LT | 30.06.2021 | ||
LV | 30.06.2021 | ||
MC | 30.06.2021 | ||
MK | 30.06.2021 | ||
NL | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SI | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
IE | 18.10.2021 | ||
LU | 18.10.2021 | ||
IS | 30.10.2021 | ||
BE | 31.10.2021 | ||
PT | 02.11.2021 | ||
Former [2023/33] | HU | 18.10.2019 | |
AL | 30.06.2021 | ||
CY | 30.06.2021 | ||
CZ | 30.06.2021 | ||
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
IT | 30.06.2021 | ||
LT | 30.06.2021 | ||
LV | 30.06.2021 | ||
MC | 30.06.2021 | ||
NL | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SI | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
IE | 18.10.2021 | ||
LU | 18.10.2021 | ||
IS | 30.10.2021 | ||
BE | 31.10.2021 | ||
PT | 02.11.2021 | ||
Former [2023/30] | AL | 30.06.2021 | |
CY | 30.06.2021 | ||
CZ | 30.06.2021 | ||
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
IT | 30.06.2021 | ||
LT | 30.06.2021 | ||
LV | 30.06.2021 | ||
MC | 30.06.2021 | ||
NL | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SI | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
IE | 18.10.2021 | ||
LU | 18.10.2021 | ||
IS | 30.10.2021 | ||
BE | 31.10.2021 | ||
PT | 02.11.2021 | ||
Former [2023/19] | AL | 30.06.2021 | |
CZ | 30.06.2021 | ||
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
IT | 30.06.2021 | ||
LT | 30.06.2021 | ||
LV | 30.06.2021 | ||
MC | 30.06.2021 | ||
NL | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SI | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
IE | 18.10.2021 | ||
LU | 18.10.2021 | ||
IS | 30.10.2021 | ||
BE | 31.10.2021 | ||
PT | 02.11.2021 | ||
Former [2022/48] | AL | 30.06.2021 | |
CZ | 30.06.2021 | ||
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
IT | 30.06.2021 | ||
LV | 30.06.2021 | ||
MC | 30.06.2021 | ||
NL | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SI | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
IE | 18.10.2021 | ||
LU | 18.10.2021 | ||
IS | 30.10.2021 | ||
BE | 31.10.2021 | ||
PT | 02.11.2021 | ||
Former [2022/36] | AL | 30.06.2021 | |
CZ | 30.06.2021 | ||
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
IT | 30.06.2021 | ||
LV | 30.06.2021 | ||
MC | 30.06.2021 | ||
NL | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SI | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
LU | 18.10.2021 | ||
IS | 30.10.2021 | ||
BE | 31.10.2021 | ||
PT | 02.11.2021 | ||
Former [2022/35] | AL | 30.06.2021 | |
CZ | 30.06.2021 | ||
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
LV | 30.06.2021 | ||
MC | 30.06.2021 | ||
NL | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SI | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
LU | 18.10.2021 | ||
IS | 30.10.2021 | ||
BE | 31.10.2021 | ||
PT | 02.11.2021 | ||
Former [2022/33] | AL | 30.06.2021 | |
CZ | 30.06.2021 | ||
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
LV | 30.06.2021 | ||
MC | 30.06.2021 | ||
NL | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SI | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
IS | 30.10.2021 | ||
BE | 31.10.2021 | ||
PT | 02.11.2021 | ||
Former [2022/29] | AL | 30.06.2021 | |
CZ | 30.06.2021 | ||
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
LV | 30.06.2021 | ||
NL | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SI | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
Former [2022/26] | AL | 30.06.2021 | |
CZ | 30.06.2021 | ||
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
LV | 30.06.2021 | ||
NL | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
Former [2022/21] | CZ | 30.06.2021 | |
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
LV | 30.06.2021 | ||
NL | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
Former [2022/11] | CZ | 30.06.2021 | |
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
LV | 30.06.2021 | ||
NL | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
Former [2022/09] | CZ | 30.06.2021 | |
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
LV | 30.06.2021 | ||
NL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
PT | 02.11.2021 | ||
Former [2022/08] | CZ | 30.06.2021 | |
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
LV | 30.06.2021 | ||
NL | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
Former [2022/07] | FI | 30.06.2021 | |
HR | 30.06.2021 | ||
LV | 30.06.2021 | ||
NL | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
Former [2021/51] | FI | 30.06.2021 | |
HR | 30.06.2021 | ||
LV | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
Former [2021/49] | FI | 30.06.2021 | |
HR | 30.06.2021 | ||
LV | 30.06.2021 | ||
SE | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
Former [2021/47] | FI | 30.06.2021 | |
BG | 30.09.2021 | ||
Former [2021/46] | FI | 30.06.2021 | Documents cited: | Search | [X]US3950204 (WILLIAMS WARREN D) [X] 1,10 * Anspruch 1; Fig. 1-4 *; | [Y]US4927480 (VAUGHAN THOMAS L [US]) [Y] 7,8,13,14 * Anspruch 11, 12; Spalte 4; l. 27-37; Fig. 1, 3, 6, 7, 8 *; | [Y]US6083604 (HARAGA KOSUKE [JP], et al) [Y] 5,6 * Spalte 7, Z. 24-28; Fig. 6, 8 *; | [Y]EP1484164 (EADS DEUTSCHLAND GMBH [DE]) [Y] 3 * Anspruch 1; Fig. 1 *; | [XY]DE102006007429 (AIRBUS GMBH [DE]) [X] 1,2,4,10,11 * Anspruch 1; Para. [0018, 0046, 0052]; Fig. 1, 2 * [Y] 3,5-8,12-14; | [Y]US2008099131 (UMEDA KATSUHIKO [JP], et al) [Y] 7 * Anspruch 1; Fig. 20 *; | [Y]WO2010122325 (AIRBUS OPERATIONS LTD [GB], et al) [Y] 12 * Fig. 14 *; | [A]JP2010260174 (TAISEI PLAS CO LTD) [A] 1-14 * Fig. 16 *; | [Y]WO2015064182 (TOYOTA MOTOR CO LTD [JP]) [Y] 12 * Fig. 7 *; | [Y]US2015285290 (ROEHRL SABINE [DE], et al) [Y] 5,6 * Anspruch 1; Fig. 3 *; | [Y]US9713901 (BUTLER GEOFFREY A [US], et al) [Y] 3 * Anspruch 19; Fig. 6, 7 *; | [Y]EP3249242 (NISSAN MOTOR [JP]) [Y] 12 * Fig. 1 *; | [A]US2018178460 (PARKES PHILIP NICHOLAS [GB], et al) [A] 1-14* Fig. 1, 2, 4 * |