blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3640485

EP3640485 - SYSTEM AND METHOD FOR CONNECTING TWO COMPONENTS [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  06.05.2022
Database last updated on 18.11.2024
FormerThe patent has been granted
Status updated on  28.05.2021
FormerGrant of patent is intended
Status updated on  21.04.2021
FormerRequest for examination was made
Status updated on  30.10.2020
FormerThe application has been published
Status updated on  20.03.2020
Most recent event   Tooltip13.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 16.10.2024  [2024/42]
Applicant(s)For all designated states
Airbus Operations GmbH
Kreetslag 10
21129 Hamburg / DE
[2020/17]
Inventor(s)01 / Schulze, Wolfgang
Airbus Operations GmbH
Kreetslag 10
21129 Hamburg / DE
02 / Eberle, Martin
Airbus Operations GmbH
Kreetslag 10
21129 Hamburg / DE
 [2020/17]
Application number, filing date19203994.918.10.2019
[2020/17]
Priority number, dateDE20181012597919.10.2018         Original published format: DE102018125979
[2020/17]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report 
No.:EP3640485
Date:22.04.2020
Language:DE
[2020/17]
Type: B1 Patent specification 
No.:EP3640485
Date:30.06.2021
Language:DE
[2021/26]
Search report(s)(Supplementary) European search report - dispatched on:EP25.03.2020
ClassificationIPC:B64C1/14, B64F5/10, F16B11/00, B29C65/00, B29C65/48, // B29L12/00, B29L31/30, B29L31/00
[2021/15]
CPC:
F16B11/006 (EP,CN); B29C66/721 (EP,US); B29C65/48 (US);
B29C66/81455 (EP,US); B64C1/1484 (EP); B64F5/10 (EP);
B29C65/4835 (EP); B29C66/112 (EP); B29C66/131 (EP);
B29C66/532 (EP); B29C66/61 (EP); B29C66/7392 (EP);
B29C66/742 (EP); B29C66/8223 (EP); B29C66/8242 (EP);
B29C66/9221 (EP); B29C66/9241 (EP); B29C66/961 (EP);
B29L2012/00 (EP); B29L2031/3076 (US); B29L2031/3082 (EP);
B29L2031/778 (EP) (-)
Former IPC [2020/17]F16B11/00, B29C65/48, B29C65/00
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/49]
Former [2020/17]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:VERFAHREN UND SYSTEM ZUM VERBINDEN ZWEIER BAUTEILE[2020/17]
English:SYSTEM AND METHOD FOR CONNECTING TWO COMPONENTS[2020/17]
French:PROCÉDÉ ET SYSTÈME DE RACCORDEMENT DE DEUX COMPOSANTS[2020/17]
Examination procedure19.10.2020Amendment by applicant (claims and/or description)
22.10.2020Examination requested  [2020/49]
22.10.2020Date on which the examining division has become responsible
22.04.2021Communication of intention to grant the patent
20.05.2021Fee for grant paid
20.05.2021Fee for publishing/printing paid
20.05.2021Receipt of the translation of the claim(s)
Opposition(s)31.03.2022No opposition filed within time limit [2022/23]
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU18.10.2019
AL30.06.2021
CY30.06.2021
CZ30.06.2021
DK30.06.2021
EE30.06.2021
ES30.06.2021
FI30.06.2021
HR30.06.2021
IT30.06.2021
LT30.06.2021
LV30.06.2021
MC30.06.2021
MK30.06.2021
MT30.06.2021
NL30.06.2021
PL30.06.2021
RO30.06.2021
RS30.06.2021
SE30.06.2021
SI30.06.2021
SK30.06.2021
SM30.06.2021
TR30.06.2021
BG30.09.2021
NO30.09.2021
GR01.10.2021
IE18.10.2021
LU18.10.2021
IS30.10.2021
BE31.10.2021
PT02.11.2021
[2024/42]
Former [2024/29]HU18.10.2019
AL30.06.2021
CY30.06.2021
CZ30.06.2021
DK30.06.2021
EE30.06.2021
ES30.06.2021
FI30.06.2021
HR30.06.2021
IT30.06.2021
LT30.06.2021
LV30.06.2021
MC30.06.2021
MK30.06.2021
NL30.06.2021
PL30.06.2021
RO30.06.2021
RS30.06.2021
SE30.06.2021
SI30.06.2021
SK30.06.2021
SM30.06.2021
TR30.06.2021
BG30.09.2021
NO30.09.2021
GR01.10.2021
IE18.10.2021
LU18.10.2021
IS30.10.2021
BE31.10.2021
PT02.11.2021
Former [2024/23]HU18.10.2019
AL30.06.2021
CY30.06.2021
CZ30.06.2021
DK30.06.2021
EE30.06.2021
ES30.06.2021
FI30.06.2021
HR30.06.2021
IT30.06.2021
LT30.06.2021
LV30.06.2021
MC30.06.2021
MK30.06.2021
NL30.06.2021
PL30.06.2021
RO30.06.2021
RS30.06.2021
SE30.06.2021
SI30.06.2021
SK30.06.2021
SM30.06.2021
BG30.09.2021
NO30.09.2021
GR01.10.2021
IE18.10.2021
LU18.10.2021
IS30.10.2021
BE31.10.2021
PT02.11.2021
Former [2023/33]HU18.10.2019
AL30.06.2021
CY30.06.2021
CZ30.06.2021
DK30.06.2021
EE30.06.2021
ES30.06.2021
FI30.06.2021
HR30.06.2021
IT30.06.2021
LT30.06.2021
LV30.06.2021
MC30.06.2021
NL30.06.2021
PL30.06.2021
RO30.06.2021
RS30.06.2021
SE30.06.2021
SI30.06.2021
SK30.06.2021
SM30.06.2021
BG30.09.2021
NO30.09.2021
GR01.10.2021
IE18.10.2021
LU18.10.2021
IS30.10.2021
BE31.10.2021
PT02.11.2021
Former [2023/30]AL30.06.2021
CY30.06.2021
CZ30.06.2021
DK30.06.2021
EE30.06.2021
ES30.06.2021
FI30.06.2021
HR30.06.2021
IT30.06.2021
LT30.06.2021
LV30.06.2021
MC30.06.2021
NL30.06.2021
PL30.06.2021
RO30.06.2021
RS30.06.2021
SE30.06.2021
SI30.06.2021
SK30.06.2021
SM30.06.2021
BG30.09.2021
NO30.09.2021
GR01.10.2021
IE18.10.2021
LU18.10.2021
IS30.10.2021
BE31.10.2021
PT02.11.2021
Former [2023/19]AL30.06.2021
CZ30.06.2021
DK30.06.2021
EE30.06.2021
ES30.06.2021
FI30.06.2021
HR30.06.2021
IT30.06.2021
LT30.06.2021
LV30.06.2021
MC30.06.2021
NL30.06.2021
PL30.06.2021
RO30.06.2021
RS30.06.2021
SE30.06.2021
SI30.06.2021
SK30.06.2021
SM30.06.2021
BG30.09.2021
NO30.09.2021
GR01.10.2021
IE18.10.2021
LU18.10.2021
IS30.10.2021
BE31.10.2021
PT02.11.2021
Former [2022/48]AL30.06.2021
CZ30.06.2021
DK30.06.2021
EE30.06.2021
ES30.06.2021
FI30.06.2021
HR30.06.2021
IT30.06.2021
LV30.06.2021
MC30.06.2021
NL30.06.2021
PL30.06.2021
RO30.06.2021
RS30.06.2021
SE30.06.2021
SI30.06.2021
SK30.06.2021
SM30.06.2021
BG30.09.2021
NO30.09.2021
GR01.10.2021
IE18.10.2021
LU18.10.2021
IS30.10.2021
BE31.10.2021
PT02.11.2021
Former [2022/36]AL30.06.2021
CZ30.06.2021
DK30.06.2021
EE30.06.2021
ES30.06.2021
FI30.06.2021
HR30.06.2021
IT30.06.2021
LV30.06.2021
MC30.06.2021
NL30.06.2021
PL30.06.2021
RO30.06.2021
RS30.06.2021
SE30.06.2021
SI30.06.2021
SK30.06.2021
SM30.06.2021
BG30.09.2021
NO30.09.2021
GR01.10.2021
LU18.10.2021
IS30.10.2021
BE31.10.2021
PT02.11.2021
Former [2022/35]AL30.06.2021
CZ30.06.2021
DK30.06.2021
EE30.06.2021
ES30.06.2021
FI30.06.2021
HR30.06.2021
LV30.06.2021
MC30.06.2021
NL30.06.2021
PL30.06.2021
RO30.06.2021
RS30.06.2021
SE30.06.2021
SI30.06.2021
SK30.06.2021
SM30.06.2021
BG30.09.2021
NO30.09.2021
GR01.10.2021
LU18.10.2021
IS30.10.2021
BE31.10.2021
PT02.11.2021
Former [2022/33]AL30.06.2021
CZ30.06.2021
DK30.06.2021
EE30.06.2021
ES30.06.2021
FI30.06.2021
HR30.06.2021
LV30.06.2021
MC30.06.2021
NL30.06.2021
PL30.06.2021
RO30.06.2021
RS30.06.2021
SE30.06.2021
SI30.06.2021
SK30.06.2021
SM30.06.2021
BG30.09.2021
NO30.09.2021
GR01.10.2021
IS30.10.2021
BE31.10.2021
PT02.11.2021
Former [2022/29]AL30.06.2021
CZ30.06.2021
DK30.06.2021
EE30.06.2021
ES30.06.2021
FI30.06.2021
HR30.06.2021
LV30.06.2021
NL30.06.2021
PL30.06.2021
RO30.06.2021
RS30.06.2021
SE30.06.2021
SI30.06.2021
SK30.06.2021
SM30.06.2021
BG30.09.2021
NO30.09.2021
GR01.10.2021
IS30.10.2021
PT02.11.2021
Former [2022/26]AL30.06.2021
CZ30.06.2021
DK30.06.2021
EE30.06.2021
ES30.06.2021
FI30.06.2021
HR30.06.2021
LV30.06.2021
NL30.06.2021
PL30.06.2021
RO30.06.2021
RS30.06.2021
SE30.06.2021
SK30.06.2021
SM30.06.2021
BG30.09.2021
NO30.09.2021
GR01.10.2021
IS30.10.2021
PT02.11.2021
Former [2022/21]CZ30.06.2021
DK30.06.2021
EE30.06.2021
ES30.06.2021
FI30.06.2021
HR30.06.2021
LV30.06.2021
NL30.06.2021
PL30.06.2021
RO30.06.2021
RS30.06.2021
SE30.06.2021
SK30.06.2021
SM30.06.2021
BG30.09.2021
NO30.09.2021
GR01.10.2021
IS30.10.2021
PT02.11.2021
Former [2022/11]CZ30.06.2021
EE30.06.2021
ES30.06.2021
FI30.06.2021
HR30.06.2021
LV30.06.2021
NL30.06.2021
PL30.06.2021
RO30.06.2021
RS30.06.2021
SE30.06.2021
SK30.06.2021
SM30.06.2021
BG30.09.2021
NO30.09.2021
GR01.10.2021
IS30.10.2021
PT02.11.2021
Former [2022/09]CZ30.06.2021
ES30.06.2021
FI30.06.2021
HR30.06.2021
LV30.06.2021
NL30.06.2021
RO30.06.2021
RS30.06.2021
SE30.06.2021
SK30.06.2021
SM30.06.2021
BG30.09.2021
NO30.09.2021
GR01.10.2021
PT02.11.2021
Former [2022/08]CZ30.06.2021
ES30.06.2021
FI30.06.2021
HR30.06.2021
LV30.06.2021
NL30.06.2021
RS30.06.2021
SE30.06.2021
SM30.06.2021
BG30.09.2021
NO30.09.2021
GR01.10.2021
Former [2022/07]FI30.06.2021
HR30.06.2021
LV30.06.2021
NL30.06.2021
RS30.06.2021
SE30.06.2021
SM30.06.2021
BG30.09.2021
NO30.09.2021
GR01.10.2021
Former [2021/51]FI30.06.2021
HR30.06.2021
LV30.06.2021
RS30.06.2021
SE30.06.2021
BG30.09.2021
NO30.09.2021
GR01.10.2021
Former [2021/49]FI30.06.2021
HR30.06.2021
LV30.06.2021
SE30.06.2021
BG30.09.2021
NO30.09.2021
GR01.10.2021
Former [2021/47]FI30.06.2021
BG30.09.2021
Former [2021/46]FI30.06.2021
Documents cited:Search[X]US3950204  (WILLIAMS WARREN D) [X] 1,10 * Anspruch 1; Fig. 1-4 *;
 [Y]US4927480  (VAUGHAN THOMAS L [US]) [Y] 7,8,13,14 * Anspruch 11, 12; Spalte 4; l. 27-37; Fig. 1, 3, 6, 7, 8 *;
 [Y]US6083604  (HARAGA KOSUKE [JP], et al) [Y] 5,6 * Spalte 7, Z. 24-28; Fig. 6, 8 *;
 [Y]EP1484164  (EADS DEUTSCHLAND GMBH [DE]) [Y] 3 * Anspruch 1; Fig. 1 *;
 [XY]DE102006007429  (AIRBUS GMBH [DE]) [X] 1,2,4,10,11 * Anspruch 1; Para. [0018, 0046, 0052]; Fig. 1, 2 * [Y] 3,5-8,12-14;
 [Y]US2008099131  (UMEDA KATSUHIKO [JP], et al) [Y] 7 * Anspruch 1; Fig. 20 *;
 [Y]WO2010122325  (AIRBUS OPERATIONS LTD [GB], et al) [Y] 12 * Fig. 14 *;
 [A]JP2010260174  (TAISEI PLAS CO LTD) [A] 1-14 * Fig. 16 *;
 [Y]WO2015064182  (TOYOTA MOTOR CO LTD [JP]) [Y] 12 * Fig. 7 *;
 [Y]US2015285290  (ROEHRL SABINE [DE], et al) [Y] 5,6 * Anspruch 1; Fig. 3 *;
 [Y]US9713901  (BUTLER GEOFFREY A [US], et al) [Y] 3 * Anspruch 19; Fig. 6, 7 *;
 [Y]EP3249242  (NISSAN MOTOR [JP]) [Y] 12 * Fig. 1 *;
 [A]US2018178460  (PARKES PHILIP NICHOLAS [GB], et al) [A] 1-14* Fig. 1, 2, 4 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.