| EP3644552 - MOBILE EDGE COMPUTING MEETS BLOCKCHAIN [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 12.05.2023 Database last updated on 26.03.2026 | |
| Former | The patent has been granted Status updated on 03.06.2022 | ||
| Former | Grant of patent is intended Status updated on 20.04.2022 | ||
| Former | Examination is in progress Status updated on 29.01.2021 | ||
| Former | Request for examination was made Status updated on 16.10.2020 | ||
| Former | The application has been published Status updated on 27.03.2020 | Most recent event Tooltip | 26.12.2025 | Lapse of the patent in a contracting state New state(s): TR | published on 28.01.2026 [2026/05] | Applicant(s) | For all designated states Hewlett Packard Enterprise Development L.P. 11445 Compaq Center Drive West Houston, TX 77070 / US | [2020/18] | Inventor(s) | 01 /
Aiello, Fabio Via Achille Campanile, 85 00144 Rome / IT | 02 /
Iosbaker, Gary Dean 3404 East Harmony Road Fort Collins, CO 80528 / US | [2020/18] | Representative(s) | Howell, Matthew Dafydd Haseltine Lake Kempner LLP One Portwall Square Portwall Lane Bristol BS1 6BH / GB | [N/P] |
| Former [2020/18] | Howell, Matthew Dafydd Haseltine Lake Kempner LLP Redcliff Quay 120 Redcliff Street Bristol BS1 6HU / GB | Application number, filing date | 19204487.3 | 22.10.2019 | [2020/18] | Priority number, date | US201816171759 | 26.10.2018 Original published format: US201816171759 | [2020/18] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3644552 | Date: | 29.04.2020 | Language: | EN | [2020/18] | Type: | B1 Patent specification | No.: | EP3644552 | Date: | 06.07.2022 | Language: | EN | [2022/27] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 25.02.2020 | Classification | IPC: | H04L9/32, // H04W4/24 | [2022/18] | CPC: |
H04L9/3239 (EP);
H04L9/0637 (EP,CN,US);
G06Q20/389 (US);
G06Q20/401 (US);
H04L12/14 (EP);
H04L12/1403 (EP);
H04L63/0807 (CN);
H04L63/0876 (US);
H04L67/10 (EP,CN);
H04L67/1074 (US);
H04L67/1097 (EP,CN);
H04L9/3247 (CN);
H04L9/50 (EP,CN);
H04W12/06 (EP);
H04W4/24 (EP);
G06Q2220/00 (US)
(-)
|
| Former IPC [2020/18] | H04L9/32, H04L29/08, // H04W4/24 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/47] |
| Former [2020/18] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | MOBILE EDGE COMPUTING UND BLOCKKETTE | [2020/18] | English: | MOBILE EDGE COMPUTING MEETS BLOCKCHAIN | [2020/18] | French: | MOBILE EDGE COMPUTING ET CHAINE DE BLOCS | [2020/18] | Examination procedure | 12.10.2020 | Amendment by applicant (claims and/or description) | 12.10.2020 | Examination requested [2020/47] | 12.10.2020 | Date on which the examining division has become responsible | 01.02.2021 | Despatch of a communication from the examining division (Time limit: M04) | 28.05.2021 | Reply to a communication from the examining division | 21.04.2022 | Communication of intention to grant the patent | 25.05.2022 | Fee for grant paid | 25.05.2022 | Fee for publishing/printing paid | 25.05.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 11.04.2023 | No opposition filed within time limit [2023/24] | Fees paid | Renewal fee | 20.10.2021 | Renewal fee patent year 03 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 22.10.2019 | AL | 06.07.2022 | AT | 06.07.2022 | BG | 06.07.2022 | CY | 06.07.2022 | CZ | 06.07.2022 | DK | 06.07.2022 | EE | 06.07.2022 | ES | 06.07.2022 | FI | 06.07.2022 | HR | 06.07.2022 | IT | 06.07.2022 | LT | 06.07.2022 | LV | 06.07.2022 | MC | 06.07.2022 | MK | 06.07.2022 | MT | 06.07.2022 | NL | 06.07.2022 | PL | 06.07.2022 | RO | 06.07.2022 | RS | 06.07.2022 | SE | 06.07.2022 | SI | 06.07.2022 | SK | 06.07.2022 | SM | 06.07.2022 | TR | 06.07.2022 | NO | 06.10.2022 | GR | 07.10.2022 | IE | 22.10.2022 | LU | 22.10.2022 | BE | 31.10.2022 | CH | 31.10.2022 | FR | 31.10.2022 | LI | 31.10.2022 | IS | 06.11.2022 | PT | 07.11.2022 | [2026/05] |
| Former [2024/44] | HU | 22.10.2019 | |
| AL | 06.07.2022 | ||
| AT | 06.07.2022 | ||
| BG | 06.07.2022 | ||
| CY | 06.07.2022 | ||
| CZ | 06.07.2022 | ||
| DK | 06.07.2022 | ||
| EE | 06.07.2022 | ||
| ES | 06.07.2022 | ||
| FI | 06.07.2022 | ||
| HR | 06.07.2022 | ||
| IT | 06.07.2022 | ||
| LT | 06.07.2022 | ||
| LV | 06.07.2022 | ||
| MC | 06.07.2022 | ||
| MK | 06.07.2022 | ||
| MT | 06.07.2022 | ||
| NL | 06.07.2022 | ||
| PL | 06.07.2022 | ||
| RO | 06.07.2022 | ||
| RS | 06.07.2022 | ||
| SE | 06.07.2022 | ||
| SI | 06.07.2022 | ||
| SK | 06.07.2022 | ||
| SM | 06.07.2022 | ||
| NO | 06.10.2022 | ||
| GR | 07.10.2022 | ||
| IE | 22.10.2022 | ||
| LU | 22.10.2022 | ||
| BE | 31.10.2022 | ||
| CH | 31.10.2022 | ||
| FR | 31.10.2022 | ||
| LI | 31.10.2022 | ||
| IS | 06.11.2022 | ||
| PT | 07.11.2022 | ||
| Former [2024/34] | HU | 22.10.2019 | |
| AL | 06.07.2022 | ||
| AT | 06.07.2022 | ||
| BG | 06.07.2022 | ||
| CY | 06.07.2022 | ||
| CZ | 06.07.2022 | ||
| DK | 06.07.2022 | ||
| EE | 06.07.2022 | ||
| ES | 06.07.2022 | ||
| FI | 06.07.2022 | ||
| HR | 06.07.2022 | ||
| IT | 06.07.2022 | ||
| LT | 06.07.2022 | ||
| LV | 06.07.2022 | ||
| MC | 06.07.2022 | ||
| MK | 06.07.2022 | ||
| NL | 06.07.2022 | ||
| PL | 06.07.2022 | ||
| RO | 06.07.2022 | ||
| RS | 06.07.2022 | ||
| SE | 06.07.2022 | ||
| SI | 06.07.2022 | ||
| SK | 06.07.2022 | ||
| SM | 06.07.2022 | ||
| NO | 06.10.2022 | ||
| GR | 07.10.2022 | ||
| IE | 22.10.2022 | ||
| LU | 22.10.2022 | ||
| BE | 31.10.2022 | ||
| CH | 31.10.2022 | ||
| FR | 31.10.2022 | ||
| LI | 31.10.2022 | ||
| IS | 06.11.2022 | ||
| PT | 07.11.2022 | ||
| Former [2024/27] | HU | 22.10.2019 | |
| AL | 06.07.2022 | ||
| AT | 06.07.2022 | ||
| CY | 06.07.2022 | ||
| CZ | 06.07.2022 | ||
| DK | 06.07.2022 | ||
| EE | 06.07.2022 | ||
| ES | 06.07.2022 | ||
| FI | 06.07.2022 | ||
| HR | 06.07.2022 | ||
| IT | 06.07.2022 | ||
| LT | 06.07.2022 | ||
| LV | 06.07.2022 | ||
| MC | 06.07.2022 | ||
| MK | 06.07.2022 | ||
| NL | 06.07.2022 | ||
| PL | 06.07.2022 | ||
| RO | 06.07.2022 | ||
| RS | 06.07.2022 | ||
| SE | 06.07.2022 | ||
| SI | 06.07.2022 | ||
| SK | 06.07.2022 | ||
| SM | 06.07.2022 | ||
| NO | 06.10.2022 | ||
| GR | 07.10.2022 | ||
| IE | 22.10.2022 | ||
| LU | 22.10.2022 | ||
| BE | 31.10.2022 | ||
| CH | 31.10.2022 | ||
| FR | 31.10.2022 | ||
| LI | 31.10.2022 | ||
| IS | 06.11.2022 | ||
| PT | 07.11.2022 | ||
| Former [2024/21] | HU | 22.10.2019 | |
| AL | 06.07.2022 | ||
| AT | 06.07.2022 | ||
| CY | 06.07.2022 | ||
| CZ | 06.07.2022 | ||
| DK | 06.07.2022 | ||
| EE | 06.07.2022 | ||
| ES | 06.07.2022 | ||
| FI | 06.07.2022 | ||
| HR | 06.07.2022 | ||
| IT | 06.07.2022 | ||
| LT | 06.07.2022 | ||
| LV | 06.07.2022 | ||
| MC | 06.07.2022 | ||
| NL | 06.07.2022 | ||
| PL | 06.07.2022 | ||
| RO | 06.07.2022 | ||
| RS | 06.07.2022 | ||
| SE | 06.07.2022 | ||
| SI | 06.07.2022 | ||
| SK | 06.07.2022 | ||
| SM | 06.07.2022 | ||
| NO | 06.10.2022 | ||
| GR | 07.10.2022 | ||
| IE | 22.10.2022 | ||
| LU | 22.10.2022 | ||
| BE | 31.10.2022 | ||
| CH | 31.10.2022 | ||
| FR | 31.10.2022 | ||
| LI | 31.10.2022 | ||
| IS | 06.11.2022 | ||
| PT | 07.11.2022 | ||
| Former [2024/18] | HU | 22.10.2019 | |
| AL | 06.07.2022 | ||
| AT | 06.07.2022 | ||
| CZ | 06.07.2022 | ||
| DK | 06.07.2022 | ||
| EE | 06.07.2022 | ||
| ES | 06.07.2022 | ||
| FI | 06.07.2022 | ||
| HR | 06.07.2022 | ||
| IT | 06.07.2022 | ||
| LT | 06.07.2022 | ||
| LV | 06.07.2022 | ||
| MC | 06.07.2022 | ||
| NL | 06.07.2022 | ||
| PL | 06.07.2022 | ||
| RO | 06.07.2022 | ||
| RS | 06.07.2022 | ||
| SE | 06.07.2022 | ||
| SI | 06.07.2022 | ||
| SK | 06.07.2022 | ||
| SM | 06.07.2022 | ||
| NO | 06.10.2022 | ||
| GR | 07.10.2022 | ||
| IE | 22.10.2022 | ||
| LU | 22.10.2022 | ||
| BE | 31.10.2022 | ||
| CH | 31.10.2022 | ||
| FR | 31.10.2022 | ||
| LI | 31.10.2022 | ||
| IS | 06.11.2022 | ||
| PT | 07.11.2022 | ||
| Former [2024/11] | AL | 06.07.2022 | |
| AT | 06.07.2022 | ||
| CZ | 06.07.2022 | ||
| DK | 06.07.2022 | ||
| EE | 06.07.2022 | ||
| ES | 06.07.2022 | ||
| FI | 06.07.2022 | ||
| HR | 06.07.2022 | ||
| IT | 06.07.2022 | ||
| LT | 06.07.2022 | ||
| LV | 06.07.2022 | ||
| MC | 06.07.2022 | ||
| NL | 06.07.2022 | ||
| PL | 06.07.2022 | ||
| RO | 06.07.2022 | ||
| RS | 06.07.2022 | ||
| SE | 06.07.2022 | ||
| SI | 06.07.2022 | ||
| SK | 06.07.2022 | ||
| SM | 06.07.2022 | ||
| NO | 06.10.2022 | ||
| GR | 07.10.2022 | ||
| IE | 22.10.2022 | ||
| LU | 22.10.2022 | ||
| BE | 31.10.2022 | ||
| CH | 31.10.2022 | ||
| FR | 31.10.2022 | ||
| LI | 31.10.2022 | ||
| IS | 06.11.2022 | ||
| PT | 07.11.2022 | ||
| Former [2023/48] | AL | 06.07.2022 | |
| AT | 06.07.2022 | ||
| CZ | 06.07.2022 | ||
| DK | 06.07.2022 | ||
| EE | 06.07.2022 | ||
| ES | 06.07.2022 | ||
| FI | 06.07.2022 | ||
| HR | 06.07.2022 | ||
| LT | 06.07.2022 | ||
| LV | 06.07.2022 | ||
| MC | 06.07.2022 | ||
| NL | 06.07.2022 | ||
| PL | 06.07.2022 | ||
| RO | 06.07.2022 | ||
| RS | 06.07.2022 | ||
| SE | 06.07.2022 | ||
| SI | 06.07.2022 | ||
| SK | 06.07.2022 | ||
| SM | 06.07.2022 | ||
| NO | 06.10.2022 | ||
| GR | 07.10.2022 | ||
| IE | 22.10.2022 | ||
| LU | 22.10.2022 | ||
| BE | 31.10.2022 | ||
| CH | 31.10.2022 | ||
| FR | 31.10.2022 | ||
| LI | 31.10.2022 | ||
| IS | 06.11.2022 | ||
| PT | 07.11.2022 | ||
| Former [2023/42] | AL | 06.07.2022 | |
| AT | 06.07.2022 | ||
| CZ | 06.07.2022 | ||
| DK | 06.07.2022 | ||
| EE | 06.07.2022 | ||
| ES | 06.07.2022 | ||
| FI | 06.07.2022 | ||
| HR | 06.07.2022 | ||
| LT | 06.07.2022 | ||
| LV | 06.07.2022 | ||
| MC | 06.07.2022 | ||
| NL | 06.07.2022 | ||
| PL | 06.07.2022 | ||
| RO | 06.07.2022 | ||
| RS | 06.07.2022 | ||
| SE | 06.07.2022 | ||
| SI | 06.07.2022 | ||
| SK | 06.07.2022 | ||
| SM | 06.07.2022 | ||
| NO | 06.10.2022 | ||
| GR | 07.10.2022 | ||
| LU | 22.10.2022 | ||
| BE | 31.10.2022 | ||
| CH | 31.10.2022 | ||
| FR | 31.10.2022 | ||
| LI | 31.10.2022 | ||
| IS | 06.11.2022 | ||
| PT | 07.11.2022 | ||
| Former [2023/37] | AL | 06.07.2022 | |
| AT | 06.07.2022 | ||
| CZ | 06.07.2022 | ||
| DK | 06.07.2022 | ||
| EE | 06.07.2022 | ||
| ES | 06.07.2022 | ||
| FI | 06.07.2022 | ||
| HR | 06.07.2022 | ||
| LT | 06.07.2022 | ||
| LV | 06.07.2022 | ||
| MC | 06.07.2022 | ||
| NL | 06.07.2022 | ||
| PL | 06.07.2022 | ||
| RO | 06.07.2022 | ||
| RS | 06.07.2022 | ||
| SE | 06.07.2022 | ||
| SI | 06.07.2022 | ||
| SK | 06.07.2022 | ||
| SM | 06.07.2022 | ||
| NO | 06.10.2022 | ||
| GR | 07.10.2022 | ||
| LU | 22.10.2022 | ||
| CH | 31.10.2022 | ||
| FR | 31.10.2022 | ||
| LI | 31.10.2022 | ||
| IS | 06.11.2022 | ||
| PT | 07.11.2022 | ||
| Former [2023/35] | AL | 06.07.2022 | |
| AT | 06.07.2022 | ||
| CZ | 06.07.2022 | ||
| DK | 06.07.2022 | ||
| EE | 06.07.2022 | ||
| ES | 06.07.2022 | ||
| FI | 06.07.2022 | ||
| HR | 06.07.2022 | ||
| LT | 06.07.2022 | ||
| LV | 06.07.2022 | ||
| MC | 06.07.2022 | ||
| NL | 06.07.2022 | ||
| PL | 06.07.2022 | ||
| RO | 06.07.2022 | ||
| RS | 06.07.2022 | ||
| SE | 06.07.2022 | ||
| SK | 06.07.2022 | ||
| SM | 06.07.2022 | ||
| NO | 06.10.2022 | ||
| GR | 07.10.2022 | ||
| LU | 22.10.2022 | ||
| CH | 31.10.2022 | ||
| FR | 31.10.2022 | ||
| LI | 31.10.2022 | ||
| IS | 06.11.2022 | ||
| PT | 07.11.2022 | ||
| Former [2023/30] | AL | 06.07.2022 | |
| AT | 06.07.2022 | ||
| CZ | 06.07.2022 | ||
| DK | 06.07.2022 | ||
| EE | 06.07.2022 | ||
| ES | 06.07.2022 | ||
| FI | 06.07.2022 | ||
| HR | 06.07.2022 | ||
| LT | 06.07.2022 | ||
| LV | 06.07.2022 | ||
| MC | 06.07.2022 | ||
| NL | 06.07.2022 | ||
| PL | 06.07.2022 | ||
| RO | 06.07.2022 | ||
| RS | 06.07.2022 | ||
| SE | 06.07.2022 | ||
| SK | 06.07.2022 | ||
| SM | 06.07.2022 | ||
| NO | 06.10.2022 | ||
| GR | 07.10.2022 | ||
| LU | 22.10.2022 | ||
| IS | 06.11.2022 | ||
| PT | 07.11.2022 | ||
| Former [2023/29] | AL | 06.07.2022 | |
| AT | 06.07.2022 | ||
| CZ | 06.07.2022 | ||
| DK | 06.07.2022 | ||
| EE | 06.07.2022 | ||
| ES | 06.07.2022 | ||
| FI | 06.07.2022 | ||
| HR | 06.07.2022 | ||
| LT | 06.07.2022 | ||
| LV | 06.07.2022 | ||
| MC | 06.07.2022 | ||
| NL | 06.07.2022 | ||
| PL | 06.07.2022 | ||
| RO | 06.07.2022 | ||
| RS | 06.07.2022 | ||
| SE | 06.07.2022 | ||
| SK | 06.07.2022 | ||
| SM | 06.07.2022 | ||
| NO | 06.10.2022 | ||
| GR | 07.10.2022 | ||
| IS | 06.11.2022 | ||
| PT | 07.11.2022 | ||
| Former [2023/25] | AT | 06.07.2022 | |
| CZ | 06.07.2022 | ||
| DK | 06.07.2022 | ||
| EE | 06.07.2022 | ||
| ES | 06.07.2022 | ||
| FI | 06.07.2022 | ||
| HR | 06.07.2022 | ||
| LT | 06.07.2022 | ||
| LV | 06.07.2022 | ||
| MC | 06.07.2022 | ||
| NL | 06.07.2022 | ||
| PL | 06.07.2022 | ||
| RO | 06.07.2022 | ||
| RS | 06.07.2022 | ||
| SE | 06.07.2022 | ||
| SK | 06.07.2022 | ||
| SM | 06.07.2022 | ||
| NO | 06.10.2022 | ||
| GR | 07.10.2022 | ||
| IS | 06.11.2022 | ||
| PT | 07.11.2022 | ||
| Former [2023/23] | AT | 06.07.2022 | |
| CZ | 06.07.2022 | ||
| DK | 06.07.2022 | ||
| EE | 06.07.2022 | ||
| ES | 06.07.2022 | ||
| FI | 06.07.2022 | ||
| HR | 06.07.2022 | ||
| LT | 06.07.2022 | ||
| LV | 06.07.2022 | ||
| NL | 06.07.2022 | ||
| PL | 06.07.2022 | ||
| RO | 06.07.2022 | ||
| RS | 06.07.2022 | ||
| SE | 06.07.2022 | ||
| SK | 06.07.2022 | ||
| SM | 06.07.2022 | ||
| NO | 06.10.2022 | ||
| GR | 07.10.2022 | ||
| IS | 06.11.2022 | ||
| PT | 07.11.2022 | ||
| Former [2023/22] | AT | 06.07.2022 | |
| CZ | 06.07.2022 | ||
| DK | 06.07.2022 | ||
| ES | 06.07.2022 | ||
| FI | 06.07.2022 | ||
| HR | 06.07.2022 | ||
| LT | 06.07.2022 | ||
| LV | 06.07.2022 | ||
| NL | 06.07.2022 | ||
| PL | 06.07.2022 | ||
| RO | 06.07.2022 | ||
| RS | 06.07.2022 | ||
| SE | 06.07.2022 | ||
| SM | 06.07.2022 | ||
| NO | 06.10.2022 | ||
| GR | 07.10.2022 | ||
| IS | 06.11.2022 | ||
| PT | 07.11.2022 | ||
| Former [2023/21] | DK | 06.07.2022 | |
| ES | 06.07.2022 | ||
| FI | 06.07.2022 | ||
| HR | 06.07.2022 | ||
| LT | 06.07.2022 | ||
| LV | 06.07.2022 | ||
| NL | 06.07.2022 | ||
| PL | 06.07.2022 | ||
| RS | 06.07.2022 | ||
| SE | 06.07.2022 | ||
| SM | 06.07.2022 | ||
| NO | 06.10.2022 | ||
| GR | 07.10.2022 | ||
| IS | 06.11.2022 | ||
| PT | 07.11.2022 | ||
| Former [2023/20] | ES | 06.07.2022 | |
| FI | 06.07.2022 | ||
| HR | 06.07.2022 | ||
| LT | 06.07.2022 | ||
| LV | 06.07.2022 | ||
| NL | 06.07.2022 | ||
| PL | 06.07.2022 | ||
| RS | 06.07.2022 | ||
| SE | 06.07.2022 | ||
| SM | 06.07.2022 | ||
| NO | 06.10.2022 | ||
| GR | 07.10.2022 | ||
| IS | 06.11.2022 | ||
| PT | 07.11.2022 | ||
| Former [2023/12] | ES | 06.07.2022 | |
| FI | 06.07.2022 | ||
| HR | 06.07.2022 | ||
| LT | 06.07.2022 | ||
| LV | 06.07.2022 | ||
| NL | 06.07.2022 | ||
| PL | 06.07.2022 | ||
| RS | 06.07.2022 | ||
| SE | 06.07.2022 | ||
| NO | 06.10.2022 | ||
| GR | 07.10.2022 | ||
| IS | 06.11.2022 | ||
| PT | 07.11.2022 | ||
| Former [2023/11] | ES | 06.07.2022 | |
| FI | 06.07.2022 | ||
| HR | 06.07.2022 | ||
| LT | 06.07.2022 | ||
| LV | 06.07.2022 | ||
| NL | 06.07.2022 | ||
| PL | 06.07.2022 | ||
| RS | 06.07.2022 | ||
| SE | 06.07.2022 | ||
| NO | 06.10.2022 | ||
| GR | 07.10.2022 | ||
| PT | 07.11.2022 | ||
| Former [2023/10] | ES | 06.07.2022 | |
| FI | 06.07.2022 | ||
| HR | 06.07.2022 | ||
| LT | 06.07.2022 | ||
| LV | 06.07.2022 | ||
| NL | 06.07.2022 | ||
| RS | 06.07.2022 | ||
| SE | 06.07.2022 | ||
| NO | 06.10.2022 | ||
| GR | 07.10.2022 | ||
| PT | 07.11.2022 | ||
| Former [2023/09] | ES | 06.07.2022 | |
| FI | 06.07.2022 | ||
| LT | 06.07.2022 | ||
| LV | 06.07.2022 | ||
| NL | 06.07.2022 | ||
| RS | 06.07.2022 | ||
| SE | 06.07.2022 | ||
| NO | 06.10.2022 | ||
| PT | 07.11.2022 | ||
| Former [2023/08] | ES | 06.07.2022 | |
| FI | 06.07.2022 | ||
| LT | 06.07.2022 | ||
| NL | 06.07.2022 | ||
| RS | 06.07.2022 | ||
| SE | 06.07.2022 | ||
| NO | 06.10.2022 | ||
| Former [2023/06] | NL | 06.07.2022 | Documents cited: | Search | [XI] LELIGOU HELEN C ET AL: "Smart Grid: a demanding use case for 5G technologies", 2018 IEEE INTERNATIONAL CONFERENCE ON PERVASIVE COMPUTING AND COMMUNICATIONS WORKSHOPS (PERCOM WORKSHOPS), IEEE, 19 March 2018 (2018-03-19), pages 215 - 220, XP033414145, DOI: 10.1109/PERCOMW.2018.8480296 [X] 1-5,9-14 * abstract * * figure 1 * * sections III,IV * [I] 6-8,15 DOI: http://dx.doi.org/10.1109/PERCOMW.2018.8480296 | [XI] XIONG ZEHUI ET AL: "When Mobile Blockchain Meets Edge Computing", IEEE COMMUNICATIONS MAGAZINE, IEEE SERVICE CENTER, PISCATAWAY, US, vol. 56, no. 8, 1 August 2018 (2018-08-01), pages 33 - 39, XP011688629, ISSN: 0163-6804, [retrieved on 20180813], DOI: 10.1109/MCOM.2018.1701095 [X] 1,2,5,6,14 * abstract * * figure 2 * * sections Introduction, Blockchain architecture, Edge computing services for mobile blockchain, Open issues * [I] 7-13,15 DOI: http://dx.doi.org/10.1109/MCOM.2018.1701095 | [XI] XU FANGMIN ET AL: "Edge Computing and Caching based Blockchain IoT Network", 2018 1ST IEEE INTERNATIONAL CONFERENCE ON HOT INFORMATION-CENTRIC NETWORKING (HOTICN), IEEE, 15 August 2018 (2018-08-15), pages 238 - 239, XP033495090, DOI: 10.1109/HOTICN.2018.8606001 [X] 1,2,5,6,14 * pages 1,2 * [I] 7-13,15 DOI: http://dx.doi.org/10.1109/HOTICN.2018.8606001 | [A] NOVO OSCAR: "Blockchain Meets IoT: An Architecture for Scalable Access Management in IoT", IEEE INTERNET OF THINGS JOURNAL, IEEE, USA, vol. 5, no. 2, 1 April 2018 (2018-04-01), pages 1184 - 1195, XP011680882, DOI: 10.1109/JIOT.2018.2812239 [A] 1-15 * the whole document * DOI: http://dx.doi.org/10.1109/JIOT.2018.2812239 | Examination | WO2019231578 |