blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3650967

EP3650967 - EDGE DEVICE, CONNECTION ESTABLISHMENT SYSTEM, CONNECTION ESTABLISHMENT METHOD, AND PROGRAM [Right-click to bookmark this link]
StatusThe application is deemed to be withdrawn
Status updated on  29.09.2023
Database last updated on 30.10.2024
FormerExamination is in progress
Status updated on  29.10.2021
FormerRequest for examination was made
Status updated on  20.11.2020
FormerThe application has been published
Status updated on  10.04.2020
Most recent event   Tooltip29.09.2023Application deemed to be withdrawnpublished on 01.11.2023  [2023/44]
Applicant(s)For all designated states
Mitsubishi Heavy Industries, Ltd.
2-3, Marunouchi 3-Chome
Chiyoda-ku
Tokyo 100-8332 / JP
[2020/20]
Inventor(s)01 / Takao, Kenji
c/o MITSUBISHI HEAVY INDUSTRIES, LTD.
2-3, Marunouchi 3-Chome
Chiyoda-ku
Tokyo 100-8332 / JP
02 / Yamashina, Yusuke
c/o MITSUBISHI HEAVY INDUSTRIES, LTD.
2-3, Marunouchi 3-Chome
Chiyoda-ku
Tokyo 100-8332 / JP
 [2020/20]
Representative(s)Henkel & Partner mbB
Patentanwaltskanzlei, Rechtsanwaltskanzlei
Maximiliansplatz 21
80333 München / DE
[2020/20]
Application number, filing date19205386.625.10.2019
[2020/20]
Priority number, dateJP2018021247912.11.2018         Original published format: JP 2018212479
[2020/20]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3650967
Date:13.05.2020
Language:EN
[2020/20]
Search report(s)(Supplementary) European search report - dispatched on:EP03.03.2020
ClassificationIPC:G05B19/05
[2020/20]
CPC:
G05B23/0267 (EP); H04L67/12 (US); G06F11/0754 (US);
H04L67/75 (US); G05B2223/06 (EP); H04L41/16 (US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/52]
Former [2020/20]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
Extension statesBANot yet paid
MENot yet paid
Validation statesKHNot yet paid
MANot yet paid
MDNot yet paid
TNNot yet paid
TitleGerman:KANTENVORRICHTUNG, VERBINDUNGSSYSTEM, VERFAHREN ZUM VERBINDUNGSAUFBAU UND PROGRAMM[2020/20]
English:EDGE DEVICE, CONNECTION ESTABLISHMENT SYSTEM, CONNECTION ESTABLISHMENT METHOD, AND PROGRAM[2020/20]
French:DISPOSITIF PÉRIPHÉRIQUE, SYSTÈME D'ÉTABLISSEMENT DE CONNEXION, PROCÉDÉ D'ÉTABLISSEMENT DE CONNEXION ET PROGRAMME[2020/20]
Examination procedure13.11.2020Amendment by applicant (claims and/or description)
13.11.2020Examination requested  [2020/52]
13.11.2020Date on which the examining division has become responsible
28.10.2021Despatch of a communication from the examining division (Time limit: M04)
01.03.2022Reply to a communication from the examining division
26.01.2023Despatch of a communication from the examining division (Time limit: M04)
27.06.2023Despatch of communication that the application is deemed to be withdrawn, reason: reply to the communication from the examining division not received in time  [2023/44]
26.09.2023Application deemed to be withdrawn, date of legal effect  [2023/44]
Fees paidRenewal fee
18.10.2021Renewal fee patent year 03
21.10.2022Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[X]JP2002006937  (TOKYO ELECTRIC POWER CO);
 [XYI]EP1239434  (AIR LIQUIDE [FR]);
 [X]US2015149617  (LAI WEN-KUO [TW]);
 [A]US2017351241  (BOWERS MATTHEW [US], et al);
 [Y]US2018275642  (TAJIMA YOSHIYUKI [JP], et al)
by applicantJP2018212479
 JP2016034066
 US2016344745
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.