EP3651202 - SEMICONDUCTOR DEVICE WITH SUPERJUNCTION AND OXYGEN INSERTED SI-LAYERS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 12.05.2023 Database last updated on 03.04.2025 | |
Former | The patent has been granted Status updated on 03.06.2022 | ||
Former | Grant of patent is intended Status updated on 06.02.2022 | ||
Former | Request for examination was made Status updated on 02.10.2020 | ||
Former | The application has been published Status updated on 10.04.2020 | Most recent event Tooltip | 27.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 30.10.2024 [2024/44] | Applicant(s) | For all designated states Infineon Technologies Austria AG Siemensstr. 2 9500 Villach / AT | [2020/20] | Inventor(s) | 01 /
Poelzl, Martin Alt-Ossiach 65 9570 Ossiach / AT | 02 /
Roesch, Maximilian Schoenfeldweg 8b 9524 St. Magdalen / AT | 03 /
Leomant, Sylvain 10.-Oktober-Strasse 6 9210 Poertschach am Woerthersee / AT | 04 /
Joshi, Ravi Keshav Birkenweg 7 9020 Klagenfurt / AT | 05 /
HAASE, Robert 2225 Grenadier Drive San Pedro 90732 / US | 06 /
HUANG, Xiaoqiu 3601 Ellington Dr Plano 75093 / US | 07 /
MA, Ling 2210 B Pullman Ln Redondo Beach 90278 / US | 08 /
MEISER, Andreas Schelcherweg 25 82054 Sauerlach / DE | [2020/20] | Representative(s) | Szynka Smorodin Patentanwälte Partnerschaft mbB Zielstattstraße 38 81379 München / DE | [N/P] |
Former [2022/27] | König Szynka Tilmann von Renesse Patentanwälte Partnerschaft mbB Zielstattstraße 38 81379 München / DE | ||
Former [2020/20] | König Szynka Tilmann von Renesse Patentanwälte Partnerschaft mbB Machtlfinger Strasse 9 81379 München / DE | Application number, filing date | 19206536.5 | 31.10.2019 | [2020/20] | Priority number, date | US201816185610 | 09.11.2018 Original published format: US201816185610 | [2020/20] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3651202 | Date: | 13.05.2020 | Language: | EN | [2020/20] | Type: | B1 Patent specification | No.: | EP3651202 | Date: | 06.07.2022 | Language: | EN | [2022/27] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 06.04.2020 | Classification | IPC: | H01L29/06, H01L29/417, H01L29/66, H01L29/78 | [2020/20] | CPC: |
H10D62/111 (EP,CN,KR,US);
H01L21/02123 (KR);
H01L21/02293 (KR);
H01L21/31111 (KR);
H01L21/324 (KR);
H01L21/76829 (KR);
H10D12/481 (EP,US);
H10D30/027 (CN);
H10D30/0291 (EP);
H10D30/0297 (EP,US);
H10D30/60 (KR);
H10D30/66 (EP);
H10D30/668 (EP,US);
H10D30/6704 (CN);
H10D62/113 (CN);
H10D62/127 (US);
H10D62/154 (US);
H10D62/158 (US);
H10D62/393 (US);
H10D64/256 (EP);
H10D64/513 (US);
H10D12/441 (EP);
H10D12/461 (EP);
H10D62/107 (EP);
H10D62/115 (EP)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/45] |
Former [2020/20] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | HALBLEITERVORRICHTUNG MIT SUPERJUNCTION- UND SAUERSTOFFEINGEFÜGTEN SI-SCHICHTEN | [2020/20] | English: | SEMICONDUCTOR DEVICE WITH SUPERJUNCTION AND OXYGEN INSERTED SI-LAYERS | [2020/20] | French: | DISPOSITIF À SEMI-CONDUCTEUR À SUPERJONCTION ET COUCHES SI INSÉRÉES DANS DE L'OXYGÈNE | [2020/20] | Examination procedure | 29.09.2020 | Amendment by applicant (claims and/or description) | 29.09.2020 | Examination requested [2020/45] | 29.09.2020 | Date on which the examining division has become responsible | 07.02.2022 | Communication of intention to grant the patent | 27.05.2022 | Fee for grant paid | 27.05.2022 | Fee for publishing/printing paid | 27.05.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 11.04.2023 | No opposition filed within time limit [2023/24] | Fees paid | Renewal fee | 27.10.2021 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 31.10.2019 | AL | 06.07.2022 | AT | 06.07.2022 | BG | 06.07.2022 | CY | 06.07.2022 | CZ | 06.07.2022 | DK | 06.07.2022 | EE | 06.07.2022 | ES | 06.07.2022 | FI | 06.07.2022 | HR | 06.07.2022 | IT | 06.07.2022 | LT | 06.07.2022 | LV | 06.07.2022 | MC | 06.07.2022 | MK | 06.07.2022 | MT | 06.07.2022 | NL | 06.07.2022 | PL | 06.07.2022 | RO | 06.07.2022 | RS | 06.07.2022 | SE | 06.07.2022 | SI | 06.07.2022 | SK | 06.07.2022 | SM | 06.07.2022 | NO | 06.10.2022 | GR | 07.10.2022 | BE | 31.10.2022 | CH | 31.10.2022 | FR | 31.10.2022 | IE | 31.10.2022 | LI | 31.10.2022 | LU | 31.10.2022 | IS | 06.11.2022 | PT | 07.11.2022 | [2024/44] |
Former [2024/34] | HU | 31.10.2019 | |
AL | 06.07.2022 | ||
AT | 06.07.2022 | ||
BG | 06.07.2022 | ||
CY | 06.07.2022 | ||
CZ | 06.07.2022 | ||
DK | 06.07.2022 | ||
EE | 06.07.2022 | ||
ES | 06.07.2022 | ||
FI | 06.07.2022 | ||
HR | 06.07.2022 | ||
IT | 06.07.2022 | ||
LT | 06.07.2022 | ||
LV | 06.07.2022 | ||
MC | 06.07.2022 | ||
MK | 06.07.2022 | ||
NL | 06.07.2022 | ||
PL | 06.07.2022 | ||
RO | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
SI | 06.07.2022 | ||
SK | 06.07.2022 | ||
SM | 06.07.2022 | ||
NO | 06.10.2022 | ||
GR | 07.10.2022 | ||
BE | 31.10.2022 | ||
CH | 31.10.2022 | ||
FR | 31.10.2022 | ||
IE | 31.10.2022 | ||
LI | 31.10.2022 | ||
LU | 31.10.2022 | ||
IS | 06.11.2022 | ||
PT | 07.11.2022 | ||
Former [2024/27] | HU | 31.10.2019 | |
AL | 06.07.2022 | ||
AT | 06.07.2022 | ||
CY | 06.07.2022 | ||
CZ | 06.07.2022 | ||
DK | 06.07.2022 | ||
EE | 06.07.2022 | ||
ES | 06.07.2022 | ||
FI | 06.07.2022 | ||
HR | 06.07.2022 | ||
IT | 06.07.2022 | ||
LT | 06.07.2022 | ||
LV | 06.07.2022 | ||
MC | 06.07.2022 | ||
MK | 06.07.2022 | ||
NL | 06.07.2022 | ||
PL | 06.07.2022 | ||
RO | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
SI | 06.07.2022 | ||
SK | 06.07.2022 | ||
SM | 06.07.2022 | ||
NO | 06.10.2022 | ||
GR | 07.10.2022 | ||
BE | 31.10.2022 | ||
CH | 31.10.2022 | ||
FR | 31.10.2022 | ||
IE | 31.10.2022 | ||
LI | 31.10.2022 | ||
LU | 31.10.2022 | ||
IS | 06.11.2022 | ||
PT | 07.11.2022 | ||
Former [2024/21] | HU | 31.10.2019 | |
AL | 06.07.2022 | ||
AT | 06.07.2022 | ||
CY | 06.07.2022 | ||
CZ | 06.07.2022 | ||
DK | 06.07.2022 | ||
EE | 06.07.2022 | ||
ES | 06.07.2022 | ||
FI | 06.07.2022 | ||
HR | 06.07.2022 | ||
IT | 06.07.2022 | ||
LT | 06.07.2022 | ||
LV | 06.07.2022 | ||
MC | 06.07.2022 | ||
NL | 06.07.2022 | ||
PL | 06.07.2022 | ||
RO | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
SI | 06.07.2022 | ||
SK | 06.07.2022 | ||
SM | 06.07.2022 | ||
NO | 06.10.2022 | ||
GR | 07.10.2022 | ||
BE | 31.10.2022 | ||
CH | 31.10.2022 | ||
FR | 31.10.2022 | ||
IE | 31.10.2022 | ||
LI | 31.10.2022 | ||
LU | 31.10.2022 | ||
IS | 06.11.2022 | ||
PT | 07.11.2022 | ||
Former [2024/18] | HU | 31.10.2019 | |
AL | 06.07.2022 | ||
AT | 06.07.2022 | ||
CZ | 06.07.2022 | ||
DK | 06.07.2022 | ||
EE | 06.07.2022 | ||
ES | 06.07.2022 | ||
FI | 06.07.2022 | ||
HR | 06.07.2022 | ||
IT | 06.07.2022 | ||
LT | 06.07.2022 | ||
LV | 06.07.2022 | ||
MC | 06.07.2022 | ||
NL | 06.07.2022 | ||
PL | 06.07.2022 | ||
RO | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
SI | 06.07.2022 | ||
SK | 06.07.2022 | ||
SM | 06.07.2022 | ||
NO | 06.10.2022 | ||
GR | 07.10.2022 | ||
BE | 31.10.2022 | ||
CH | 31.10.2022 | ||
FR | 31.10.2022 | ||
IE | 31.10.2022 | ||
LI | 31.10.2022 | ||
LU | 31.10.2022 | ||
IS | 06.11.2022 | ||
PT | 07.11.2022 | ||
Former [2024/11] | AL | 06.07.2022 | |
AT | 06.07.2022 | ||
CZ | 06.07.2022 | ||
DK | 06.07.2022 | ||
EE | 06.07.2022 | ||
ES | 06.07.2022 | ||
FI | 06.07.2022 | ||
HR | 06.07.2022 | ||
IT | 06.07.2022 | ||
LT | 06.07.2022 | ||
LV | 06.07.2022 | ||
MC | 06.07.2022 | ||
NL | 06.07.2022 | ||
PL | 06.07.2022 | ||
RO | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
SI | 06.07.2022 | ||
SK | 06.07.2022 | ||
SM | 06.07.2022 | ||
NO | 06.10.2022 | ||
GR | 07.10.2022 | ||
BE | 31.10.2022 | ||
CH | 31.10.2022 | ||
FR | 31.10.2022 | ||
IE | 31.10.2022 | ||
LI | 31.10.2022 | ||
LU | 31.10.2022 | ||
IS | 06.11.2022 | ||
PT | 07.11.2022 | ||
Former [2023/48] | AL | 06.07.2022 | |
AT | 06.07.2022 | ||
CZ | 06.07.2022 | ||
DK | 06.07.2022 | ||
EE | 06.07.2022 | ||
ES | 06.07.2022 | ||
FI | 06.07.2022 | ||
HR | 06.07.2022 | ||
LT | 06.07.2022 | ||
LV | 06.07.2022 | ||
MC | 06.07.2022 | ||
NL | 06.07.2022 | ||
PL | 06.07.2022 | ||
RO | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
SI | 06.07.2022 | ||
SK | 06.07.2022 | ||
SM | 06.07.2022 | ||
NO | 06.10.2022 | ||
GR | 07.10.2022 | ||
BE | 31.10.2022 | ||
CH | 31.10.2022 | ||
FR | 31.10.2022 | ||
IE | 31.10.2022 | ||
LI | 31.10.2022 | ||
LU | 31.10.2022 | ||
IS | 06.11.2022 | ||
PT | 07.11.2022 | ||
Former [2023/42] | AL | 06.07.2022 | |
AT | 06.07.2022 | ||
CZ | 06.07.2022 | ||
DK | 06.07.2022 | ||
EE | 06.07.2022 | ||
ES | 06.07.2022 | ||
FI | 06.07.2022 | ||
HR | 06.07.2022 | ||
LT | 06.07.2022 | ||
LV | 06.07.2022 | ||
MC | 06.07.2022 | ||
NL | 06.07.2022 | ||
PL | 06.07.2022 | ||
RO | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
SI | 06.07.2022 | ||
SK | 06.07.2022 | ||
SM | 06.07.2022 | ||
NO | 06.10.2022 | ||
GR | 07.10.2022 | ||
BE | 31.10.2022 | ||
CH | 31.10.2022 | ||
FR | 31.10.2022 | ||
LI | 31.10.2022 | ||
LU | 31.10.2022 | ||
IS | 06.11.2022 | ||
PT | 07.11.2022 | ||
Former [2023/37] | AL | 06.07.2022 | |
AT | 06.07.2022 | ||
CZ | 06.07.2022 | ||
DK | 06.07.2022 | ||
EE | 06.07.2022 | ||
ES | 06.07.2022 | ||
FI | 06.07.2022 | ||
HR | 06.07.2022 | ||
LT | 06.07.2022 | ||
LV | 06.07.2022 | ||
MC | 06.07.2022 | ||
NL | 06.07.2022 | ||
PL | 06.07.2022 | ||
RO | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
SI | 06.07.2022 | ||
SK | 06.07.2022 | ||
SM | 06.07.2022 | ||
NO | 06.10.2022 | ||
GR | 07.10.2022 | ||
CH | 31.10.2022 | ||
FR | 31.10.2022 | ||
LI | 31.10.2022 | ||
LU | 31.10.2022 | ||
IS | 06.11.2022 | ||
PT | 07.11.2022 | ||
Former [2023/35] | AL | 06.07.2022 | |
AT | 06.07.2022 | ||
CZ | 06.07.2022 | ||
DK | 06.07.2022 | ||
EE | 06.07.2022 | ||
ES | 06.07.2022 | ||
FI | 06.07.2022 | ||
HR | 06.07.2022 | ||
LT | 06.07.2022 | ||
LV | 06.07.2022 | ||
MC | 06.07.2022 | ||
NL | 06.07.2022 | ||
PL | 06.07.2022 | ||
RO | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
SK | 06.07.2022 | ||
SM | 06.07.2022 | ||
NO | 06.10.2022 | ||
GR | 07.10.2022 | ||
CH | 31.10.2022 | ||
FR | 31.10.2022 | ||
LI | 31.10.2022 | ||
LU | 31.10.2022 | ||
IS | 06.11.2022 | ||
PT | 07.11.2022 | ||
Former [2023/30] | AL | 06.07.2022 | |
AT | 06.07.2022 | ||
CZ | 06.07.2022 | ||
DK | 06.07.2022 | ||
EE | 06.07.2022 | ||
ES | 06.07.2022 | ||
FI | 06.07.2022 | ||
HR | 06.07.2022 | ||
LT | 06.07.2022 | ||
LV | 06.07.2022 | ||
MC | 06.07.2022 | ||
NL | 06.07.2022 | ||
PL | 06.07.2022 | ||
RO | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
SK | 06.07.2022 | ||
SM | 06.07.2022 | ||
NO | 06.10.2022 | ||
GR | 07.10.2022 | ||
LU | 31.10.2022 | ||
IS | 06.11.2022 | ||
PT | 07.11.2022 | ||
Former [2023/29] | AL | 06.07.2022 | |
AT | 06.07.2022 | ||
CZ | 06.07.2022 | ||
DK | 06.07.2022 | ||
EE | 06.07.2022 | ||
ES | 06.07.2022 | ||
FI | 06.07.2022 | ||
HR | 06.07.2022 | ||
LT | 06.07.2022 | ||
LV | 06.07.2022 | ||
MC | 06.07.2022 | ||
NL | 06.07.2022 | ||
PL | 06.07.2022 | ||
RO | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
SK | 06.07.2022 | ||
SM | 06.07.2022 | ||
NO | 06.10.2022 | ||
GR | 07.10.2022 | ||
IS | 06.11.2022 | ||
PT | 07.11.2022 | ||
Former [2023/25] | AT | 06.07.2022 | |
CZ | 06.07.2022 | ||
DK | 06.07.2022 | ||
EE | 06.07.2022 | ||
ES | 06.07.2022 | ||
FI | 06.07.2022 | ||
HR | 06.07.2022 | ||
LT | 06.07.2022 | ||
LV | 06.07.2022 | ||
MC | 06.07.2022 | ||
NL | 06.07.2022 | ||
PL | 06.07.2022 | ||
RO | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
SK | 06.07.2022 | ||
SM | 06.07.2022 | ||
NO | 06.10.2022 | ||
GR | 07.10.2022 | ||
IS | 06.11.2022 | ||
PT | 07.11.2022 | ||
Former [2023/23] | AT | 06.07.2022 | |
CZ | 06.07.2022 | ||
DK | 06.07.2022 | ||
EE | 06.07.2022 | ||
ES | 06.07.2022 | ||
FI | 06.07.2022 | ||
HR | 06.07.2022 | ||
LT | 06.07.2022 | ||
LV | 06.07.2022 | ||
NL | 06.07.2022 | ||
PL | 06.07.2022 | ||
RO | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
SK | 06.07.2022 | ||
SM | 06.07.2022 | ||
NO | 06.10.2022 | ||
GR | 07.10.2022 | ||
IS | 06.11.2022 | ||
PT | 07.11.2022 | ||
Former [2023/22] | AT | 06.07.2022 | |
CZ | 06.07.2022 | ||
DK | 06.07.2022 | ||
ES | 06.07.2022 | ||
FI | 06.07.2022 | ||
HR | 06.07.2022 | ||
LT | 06.07.2022 | ||
LV | 06.07.2022 | ||
NL | 06.07.2022 | ||
PL | 06.07.2022 | ||
RO | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
SM | 06.07.2022 | ||
NO | 06.10.2022 | ||
GR | 07.10.2022 | ||
IS | 06.11.2022 | ||
PT | 07.11.2022 | ||
Former [2023/21] | DK | 06.07.2022 | |
ES | 06.07.2022 | ||
FI | 06.07.2022 | ||
HR | 06.07.2022 | ||
LT | 06.07.2022 | ||
LV | 06.07.2022 | ||
NL | 06.07.2022 | ||
PL | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
SM | 06.07.2022 | ||
NO | 06.10.2022 | ||
GR | 07.10.2022 | ||
IS | 06.11.2022 | ||
PT | 07.11.2022 | ||
Former [2023/20] | ES | 06.07.2022 | |
FI | 06.07.2022 | ||
HR | 06.07.2022 | ||
LT | 06.07.2022 | ||
LV | 06.07.2022 | ||
NL | 06.07.2022 | ||
PL | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
SM | 06.07.2022 | ||
NO | 06.10.2022 | ||
GR | 07.10.2022 | ||
IS | 06.11.2022 | ||
PT | 07.11.2022 | ||
Former [2023/12] | ES | 06.07.2022 | |
FI | 06.07.2022 | ||
HR | 06.07.2022 | ||
LT | 06.07.2022 | ||
LV | 06.07.2022 | ||
NL | 06.07.2022 | ||
PL | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
NO | 06.10.2022 | ||
GR | 07.10.2022 | ||
IS | 06.11.2022 | ||
PT | 07.11.2022 | ||
Former [2023/11] | ES | 06.07.2022 | |
FI | 06.07.2022 | ||
HR | 06.07.2022 | ||
LT | 06.07.2022 | ||
LV | 06.07.2022 | ||
NL | 06.07.2022 | ||
PL | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
NO | 06.10.2022 | ||
GR | 07.10.2022 | ||
PT | 07.11.2022 | ||
Former [2023/10] | ES | 06.07.2022 | |
FI | 06.07.2022 | ||
HR | 06.07.2022 | ||
LT | 06.07.2022 | ||
LV | 06.07.2022 | ||
NL | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
NO | 06.10.2022 | ||
GR | 07.10.2022 | ||
PT | 07.11.2022 | ||
Former [2023/09] | ES | 06.07.2022 | |
FI | 06.07.2022 | ||
LT | 06.07.2022 | ||
LV | 06.07.2022 | ||
NL | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
NO | 06.10.2022 | ||
PT | 07.11.2022 | ||
Former [2023/08] | ES | 06.07.2022 | |
FI | 06.07.2022 | ||
LT | 06.07.2022 | ||
NL | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
NO | 06.10.2022 | ||
Former [2023/06] | NL | 06.07.2022 | Documents cited: | Search | [A]US2007249142 (HISANAGA YUKIHIRO [JP]); | [A]DE102007044414 (INFINEON TECHNOLOGIES AUSTRIA [AT]); | [A]WO2009079465 (FAIRCHILD SEMICONDUCTOR [US], et al); | [A]US2013313632 (SCHULZE HANS-JOACHIM [DE], et al) |