EP3657108 - STORAGE CONTAINER AND REFRIGERATOR HAVING THE SAME [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 03.05.2024 Database last updated on 16.11.2024 | |
Former | The patent has been granted Status updated on 26.05.2023 | ||
Former | Grant of patent is intended Status updated on 18.04.2023 | ||
Former | Examination is in progress Status updated on 24.03.2023 | ||
Former | Grant of patent is intended Status updated on 11.12.2022 | ||
Former | Examination is in progress Status updated on 30.07.2021 | ||
Former | Request for examination was made Status updated on 24.04.2020 | Most recent event Tooltip | 15.11.2024 | Lapse of the patent in a contracting state New state(s): BG | published on 18.12.2024 [2024/51] | Applicant(s) | For all designated states LG Electronics Inc. 128, Yeouidaero Yeongdeungpogu SEOUL, 07336 / KR | [2020/22] | Inventor(s) | 01 /
JUNG, Hyungi IP Center, LG Electroncis Inc. 51 Gasan digital 1-ro, Geumcheon 08592 Seoul / KR | 02 /
LEE, Sangyong IP Center, LG Electroncis Inc. 51 Gasan digital 1-ro, Geumcheon 08592 Seoul / KR | 03 /
JEONG, Seokjae IP Center, LG Electroncis Inc. 51 Gasan digital 1-ro, Geumcheon 08592 Seoul / KR | [2020/22] | Representative(s) | Ter Meer Steinmeister & Partner Patentanwälte mbB Nymphenburger Straße 4 80335 München / DE | [2020/22] | Application number, filing date | 19209307.8 | 15.11.2019 | [2020/22] | Priority number, date | KR20180145554 | 22.11.2018 Original published format: KR 20180145554 | [2020/22] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3657108 | Date: | 27.05.2020 | Language: | EN | [2020/22] | Type: | B1 Patent specification | No.: | EP3657108 | Date: | 28.06.2023 | Language: | EN | [2023/26] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 26.03.2020 | Classification | IPC: | F25D25/02, B32B15/04, // F25D31/00, A47J47/02 | [2022/51] | CPC: |
B32B15/043 (EP,US);
B65D7/22 (KR);
F25D11/00 (CN);
B32B1/00 (US);
B32B15/017 (US);
B32B15/20 (US);
B65D1/22 (US);
B65D25/14 (KR,US);
B65D25/34 (KR,US);
B65D7/42 (KR);
C09D1/00 (KR);
F25D25/005 (CN,KR);
F25D25/025 (EP,CN);
A47J47/02 (EP);
B32B2255/06 (EP,US);
B32B2255/20 (EP,US);
B32B2255/26 (EP,US);
B32B2439/40 (US);
|
Former IPC [2020/22] | F25D25/02, // F25D31/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/49] |
Former [2020/22] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | LAGERBEHÄLTER UND KÜHLSCHRANK DAMIT | [2020/22] | English: | STORAGE CONTAINER AND REFRIGERATOR HAVING THE SAME | [2020/22] | French: | CONTENEUR DE STOCKAGE ET RÉFRIGÉRATEUR EN DISPOSANT | [2020/22] | Examination procedure | 15.11.2019 | Examination requested [2020/22] | 26.10.2020 | Amendment by applicant (claims and/or description) | 03.08.2021 | Despatch of a communication from the examining division (Time limit: M04) | 16.11.2021 | Reply to a communication from the examining division | 12.12.2022 | Communication of intention to grant the patent | 23.03.2023 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 19.04.2023 | Communication of intention to grant the patent | 24.05.2023 | Fee for grant paid | 24.05.2023 | Fee for publishing/printing paid | 24.05.2023 | Receipt of the translation of the claim(s) | Opposition(s) | 02.04.2024 | No opposition filed within time limit [2024/23] | Fees paid | Renewal fee | 24.11.2021 | Renewal fee patent year 03 | 24.11.2022 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 28.06.2023 | BG | 28.06.2023 | CZ | 28.06.2023 | DK | 28.06.2023 | EE | 28.06.2023 | ES | 28.06.2023 | FI | 28.06.2023 | HR | 28.06.2023 | IT | 28.06.2023 | LT | 28.06.2023 | LV | 28.06.2023 | MC | 28.06.2023 | NL | 28.06.2023 | PL | 28.06.2023 | RO | 28.06.2023 | RS | 28.06.2023 | SE | 28.06.2023 | SI | 28.06.2023 | SK | 28.06.2023 | SM | 28.06.2023 | NO | 28.09.2023 | IS | 28.10.2023 | PT | 30.10.2023 | GB | 15.11.2023 | IE | 15.11.2023 | LU | 15.11.2023 | BE | 30.11.2023 | CH | 30.11.2023 | FR | 30.11.2023 | [2024/51] |
Former [2024/47] | AT | 28.06.2023 | |
CZ | 28.06.2023 | ||
DK | 28.06.2023 | ||
EE | 28.06.2023 | ||
ES | 28.06.2023 | ||
FI | 28.06.2023 | ||
HR | 28.06.2023 | ||
IT | 28.06.2023 | ||
LT | 28.06.2023 | ||
LV | 28.06.2023 | ||
MC | 28.06.2023 | ||
NL | 28.06.2023 | ||
PL | 28.06.2023 | ||
RO | 28.06.2023 | ||
RS | 28.06.2023 | ||
SE | 28.06.2023 | ||
SI | 28.06.2023 | ||
SK | 28.06.2023 | ||
SM | 28.06.2023 | ||
NO | 28.09.2023 | ||
IS | 28.10.2023 | ||
PT | 30.10.2023 | ||
GB | 15.11.2023 | ||
IE | 15.11.2023 | ||
LU | 15.11.2023 | ||
BE | 30.11.2023 | ||
CH | 30.11.2023 | ||
FR | 30.11.2023 | ||
Former [2024/46] | AT | 28.06.2023 | |
CZ | 28.06.2023 | ||
DK | 28.06.2023 | ||
EE | 28.06.2023 | ||
ES | 28.06.2023 | ||
FI | 28.06.2023 | ||
HR | 28.06.2023 | ||
IT | 28.06.2023 | ||
LT | 28.06.2023 | ||
LV | 28.06.2023 | ||
MC | 28.06.2023 | ||
NL | 28.06.2023 | ||
PL | 28.06.2023 | ||
RO | 28.06.2023 | ||
RS | 28.06.2023 | ||
SE | 28.06.2023 | ||
SI | 28.06.2023 | ||
SK | 28.06.2023 | ||
SM | 28.06.2023 | ||
NO | 28.09.2023 | ||
IS | 28.10.2023 | ||
PT | 30.10.2023 | ||
IE | 15.11.2023 | ||
LU | 15.11.2023 | ||
CH | 30.11.2023 | ||
Former [2024/36] | AT | 28.06.2023 | |
CZ | 28.06.2023 | ||
DK | 28.06.2023 | ||
EE | 28.06.2023 | ||
ES | 28.06.2023 | ||
FI | 28.06.2023 | ||
HR | 28.06.2023 | ||
IT | 28.06.2023 | ||
LT | 28.06.2023 | ||
LV | 28.06.2023 | ||
MC | 28.06.2023 | ||
NL | 28.06.2023 | ||
PL | 28.06.2023 | ||
RO | 28.06.2023 | ||
RS | 28.06.2023 | ||
SE | 28.06.2023 | ||
SI | 28.06.2023 | ||
SK | 28.06.2023 | ||
SM | 28.06.2023 | ||
NO | 28.09.2023 | ||
IS | 28.10.2023 | ||
PT | 30.10.2023 | ||
LU | 15.11.2023 | ||
CH | 30.11.2023 | ||
Former [2024/34] | AT | 28.06.2023 | |
CZ | 28.06.2023 | ||
DK | 28.06.2023 | ||
EE | 28.06.2023 | ||
ES | 28.06.2023 | ||
FI | 28.06.2023 | ||
HR | 28.06.2023 | ||
IT | 28.06.2023 | ||
LT | 28.06.2023 | ||
LV | 28.06.2023 | ||
MC | 28.06.2023 | ||
NL | 28.06.2023 | ||
PL | 28.06.2023 | ||
RO | 28.06.2023 | ||
RS | 28.06.2023 | ||
SE | 28.06.2023 | ||
SK | 28.06.2023 | ||
SM | 28.06.2023 | ||
NO | 28.09.2023 | ||
IS | 28.10.2023 | ||
PT | 30.10.2023 | ||
LU | 15.11.2023 | ||
CH | 30.11.2023 | ||
Former [2024/32] | AT | 28.06.2023 | |
CZ | 28.06.2023 | ||
DK | 28.06.2023 | ||
EE | 28.06.2023 | ||
ES | 28.06.2023 | ||
FI | 28.06.2023 | ||
HR | 28.06.2023 | ||
IT | 28.06.2023 | ||
LT | 28.06.2023 | ||
LV | 28.06.2023 | ||
MC | 28.06.2023 | ||
NL | 28.06.2023 | ||
PL | 28.06.2023 | ||
RO | 28.06.2023 | ||
RS | 28.06.2023 | ||
SE | 28.06.2023 | ||
SK | 28.06.2023 | ||
SM | 28.06.2023 | ||
NO | 28.09.2023 | ||
IS | 28.10.2023 | ||
PT | 30.10.2023 | ||
Former [2024/26] | AT | 28.06.2023 | |
CZ | 28.06.2023 | ||
DK | 28.06.2023 | ||
EE | 28.06.2023 | ||
ES | 28.06.2023 | ||
FI | 28.06.2023 | ||
HR | 28.06.2023 | ||
IT | 28.06.2023 | ||
LT | 28.06.2023 | ||
LV | 28.06.2023 | ||
NL | 28.06.2023 | ||
PL | 28.06.2023 | ||
RO | 28.06.2023 | ||
RS | 28.06.2023 | ||
SE | 28.06.2023 | ||
SK | 28.06.2023 | ||
SM | 28.06.2023 | ||
NO | 28.09.2023 | ||
IS | 28.10.2023 | ||
PT | 30.10.2023 | ||
Former [2024/22] | AT | 28.06.2023 | |
CZ | 28.06.2023 | ||
DK | 28.06.2023 | ||
EE | 28.06.2023 | ||
ES | 28.06.2023 | ||
FI | 28.06.2023 | ||
HR | 28.06.2023 | ||
LT | 28.06.2023 | ||
LV | 28.06.2023 | ||
NL | 28.06.2023 | ||
PL | 28.06.2023 | ||
RO | 28.06.2023 | ||
RS | 28.06.2023 | ||
SE | 28.06.2023 | ||
SK | 28.06.2023 | ||
SM | 28.06.2023 | ||
NO | 28.09.2023 | ||
IS | 28.10.2023 | ||
PT | 30.10.2023 | ||
Former [2024/10] | AT | 28.06.2023 | |
CZ | 28.06.2023 | ||
EE | 28.06.2023 | ||
ES | 28.06.2023 | ||
FI | 28.06.2023 | ||
HR | 28.06.2023 | ||
LT | 28.06.2023 | ||
LV | 28.06.2023 | ||
NL | 28.06.2023 | ||
PL | 28.06.2023 | ||
RO | 28.06.2023 | ||
RS | 28.06.2023 | ||
SE | 28.06.2023 | ||
SK | 28.06.2023 | ||
SM | 28.06.2023 | ||
NO | 28.09.2023 | ||
IS | 28.10.2023 | ||
PT | 30.10.2023 | ||
Former [2024/09] | AT | 28.06.2023 | |
CZ | 28.06.2023 | ||
ES | 28.06.2023 | ||
FI | 28.06.2023 | ||
HR | 28.06.2023 | ||
LT | 28.06.2023 | ||
LV | 28.06.2023 | ||
NL | 28.06.2023 | ||
RS | 28.06.2023 | ||
SE | 28.06.2023 | ||
SK | 28.06.2023 | ||
SM | 28.06.2023 | ||
NO | 28.09.2023 | ||
IS | 28.10.2023 | ||
Former [2024/08] | FI | 28.06.2023 | |
HR | 28.06.2023 | ||
LT | 28.06.2023 | ||
LV | 28.06.2023 | ||
NL | 28.06.2023 | ||
RS | 28.06.2023 | ||
SE | 28.06.2023 | ||
SK | 28.06.2023 | ||
SM | 28.06.2023 | ||
NO | 28.09.2023 | ||
Former [2024/03] | FI | 28.06.2023 | |
HR | 28.06.2023 | ||
LT | 28.06.2023 | ||
LV | 28.06.2023 | ||
NL | 28.06.2023 | ||
RS | 28.06.2023 | ||
SE | 28.06.2023 | ||
NO | 28.09.2023 | ||
Former [2024/01] | HR | 28.06.2023 | |
LT | 28.06.2023 | ||
LV | 28.06.2023 | ||
NL | 28.06.2023 | ||
RS | 28.06.2023 | ||
SE | 28.06.2023 | ||
NO | 28.09.2023 | ||
Former [2023/52] | HR | 28.06.2023 | |
NL | 28.06.2023 | ||
RS | 28.06.2023 | ||
SE | 28.06.2023 | ||
NO | 28.09.2023 | ||
Former [2023/51] | HR | 28.06.2023 | |
RS | 28.06.2023 | ||
SE | 28.06.2023 | ||
NO | 28.09.2023 | ||
Former [2023/48] | SE | 28.06.2023 | |
NO | 28.09.2023 | Documents cited: | Search | [A]JPH04147838 (SHOWA ALUMINUM CORP); | [XYI]JPH08198338 (MIYOUDOU KINZOKU KK); | [XY]JP2005053173 (MYODO TAKASHI, et al); | [X]JP4040986B ; | [Y]KR101021417B | Examination | KR100738719B | JP3950904B | by applicant | KR20160024231 |