EP3667677 - NUCLEAR REACTOR COOLING CIRCUIT WITH DEPRESSURISATION VALVE [Right-click to bookmark this link] | |||
Former [2020/25] | DEPRESSURISATION VALVE | ||
[2021/25] | Status | No opposition filed within time limit Status updated on 08.07.2022 Database last updated on 12.10.2024 | |
Former | The patent has been granted Status updated on 30.07.2021 | ||
Former | Grant of patent is intended Status updated on 27.06.2021 | ||
Former | Request for examination was made Status updated on 18.12.2020 | ||
Former | The application has been published Status updated on 15.05.2020 | Most recent event Tooltip | 13.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 16.10.2024 [2024/42] | Applicant(s) | For all designated states Rolls-Royce plc Kings Place 90 York Way London N1 9FX / GB | For all designated states Rolls-Royce Power Engineering PLC Moor Lane Derby DE24 8BJ / GB | [2020/25] | Inventor(s) | 01 /
Shearer, Brenton c/o Rolls-Royce plc PO Box 31 Derby, Derbyshire DE24 8BJ / GB | 02 /
Palmer, James c/o Rolls-Royce plc PO Box 31 Derby, Derbyshire DE24 8BJ / GB | 03 /
Ireland, Benjamin c/o Rolls-Royce plc PO Box 31 Derby, Derbyshire DE24 8BJ / GB | [2020/25] | Representative(s) | Rolls-Royce plc Moor Lane (ML-9) PO Box 31 Derby DE24 8BJ / GB | [N/P] |
Former [2020/25] | Rolls-Royce plc Intellectual Property Dept SinA-48 PO Box 31 Derby DE24 8BJ / GB | Application number, filing date | 19209340.9 | 15.11.2019 | [2020/25] | Priority number, date | GB20180020328 | 13.12.2018 Original published format: GB 201820328 | [2020/25] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3667677 | Date: | 17.06.2020 | Language: | EN | [2020/25] | Type: | B1 Patent specification | No.: | EP3667677 | Date: | 01.09.2021 | Language: | EN | [2021/35] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 31.03.2020 | Classification | IPC: | G21C9/004, G21C13/02, F16K31/08, G21C15/18, F16K31/00 | [2021/25] | CPC: |
G21C9/004 (EP,US);
F16K17/10 (KR);
F16K17/22 (CN);
F16K15/1826 (KR);
F16K17/003 (KR);
F16K17/048 (US);
F16K17/0486 (US);
F16K17/34 (CN);
F16K17/38 (CN);
F16K17/383 (CN);
F16K31/002 (EP);
F16K31/06 (US);
F16K31/084 (EP);
F16K31/383 (CN);
G21C13/02 (EP);
G21C15/18 (EP,CN,KR);
Y02E30/00 (EP);
Y02E30/30 (EP,KR);
Y10T137/7737 (US)
(-)
|
Former IPC [2020/25] | G21C9/004, G21C13/02, F16K31/08, G21C15/18 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2021/03] |
Former [2020/25] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | KERNREAKTORKÜHLKREISLAUF MIT DRUCKENTLASTUNGSVENTIL | [2021/25] | English: | NUCLEAR REACTOR COOLING CIRCUIT WITH DEPRESSURISATION VALVE | [2021/25] | French: | CIRCUIT DE REFROIDISSEMENT DE RÉACTEUR NUCLÉAIRE AVEC SOUPAPE DE DÉPRESSURISATION | [2021/25] |
Former [2020/25] | DRUCKENTLASTUNGSVENTIL | ||
Former [2020/25] | DEPRESSURISATION VALVE | ||
Former [2020/25] | SOUPAPE DE DÉPRESSURISATION | Examination procedure | 16.12.2020 | Amendment by applicant (claims and/or description) | 16.12.2020 | Examination requested [2021/03] | 16.12.2020 | Date on which the examining division has become responsible | 28.06.2021 | Communication of intention to grant the patent | 27.07.2021 | Fee for grant paid | 27.07.2021 | Fee for publishing/printing paid | 27.07.2021 | Receipt of the translation of the claim(s) | Divisional application(s) | EP21187699.0 / EP3937188 | Opposition(s) | 02.06.2022 | No opposition filed within time limit [2022/32] |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AL | 01.09.2021 | AT | 01.09.2021 | CY | 01.09.2021 | DK | 01.09.2021 | EE | 01.09.2021 | ES | 01.09.2021 | FI | 01.09.2021 | HR | 01.09.2021 | IT | 01.09.2021 | LT | 01.09.2021 | LV | 01.09.2021 | MC | 01.09.2021 | MK | 01.09.2021 | MT | 01.09.2021 | NL | 01.09.2021 | RS | 01.09.2021 | SE | 01.09.2021 | SI | 01.09.2021 | SK | 01.09.2021 | SM | 01.09.2021 | IE | 15.11.2021 | LU | 15.11.2021 | BE | 30.11.2021 | BG | 01.12.2021 | NO | 01.12.2021 | GR | 02.12.2021 | IS | 01.01.2022 | PT | 03.01.2022 | [2024/42] |
Former [2024/23] | AL | 01.09.2021 | |
AT | 01.09.2021 | ||
CY | 01.09.2021 | ||
DK | 01.09.2021 | ||
EE | 01.09.2021 | ||
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
IT | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
MC | 01.09.2021 | ||
MK | 01.09.2021 | ||
NL | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
SI | 01.09.2021 | ||
SK | 01.09.2021 | ||
SM | 01.09.2021 | ||
IE | 15.11.2021 | ||
LU | 15.11.2021 | ||
BE | 30.11.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
IS | 01.01.2022 | ||
PT | 03.01.2022 | ||
Former [2023/30] | AL | 01.09.2021 | |
AT | 01.09.2021 | ||
CY | 01.09.2021 | ||
DK | 01.09.2021 | ||
EE | 01.09.2021 | ||
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
IT | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
MC | 01.09.2021 | ||
NL | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
SI | 01.09.2021 | ||
SK | 01.09.2021 | ||
SM | 01.09.2021 | ||
IE | 15.11.2021 | ||
LU | 15.11.2021 | ||
BE | 30.11.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
IS | 01.01.2022 | ||
PT | 03.01.2022 | ||
Former [2022/48] | AL | 01.09.2021 | |
AT | 01.09.2021 | ||
DK | 01.09.2021 | ||
EE | 01.09.2021 | ||
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
IT | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
MC | 01.09.2021 | ||
NL | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
SI | 01.09.2021 | ||
SK | 01.09.2021 | ||
SM | 01.09.2021 | ||
IE | 15.11.2021 | ||
LU | 15.11.2021 | ||
BE | 30.11.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
IS | 01.01.2022 | ||
PT | 03.01.2022 | ||
Former [2022/36] | AL | 01.09.2021 | |
AT | 01.09.2021 | ||
DK | 01.09.2021 | ||
EE | 01.09.2021 | ||
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
IT | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
MC | 01.09.2021 | ||
NL | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
SI | 01.09.2021 | ||
SK | 01.09.2021 | ||
SM | 01.09.2021 | ||
LU | 15.11.2021 | ||
BE | 30.11.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
IS | 01.01.2022 | ||
PT | 03.01.2022 | ||
Former [2022/34] | AL | 01.09.2021 | |
AT | 01.09.2021 | ||
EE | 01.09.2021 | ||
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
MC | 01.09.2021 | ||
NL | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
SK | 01.09.2021 | ||
SM | 01.09.2021 | ||
LU | 15.11.2021 | ||
BE | 30.11.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
IS | 01.01.2022 | ||
PT | 03.01.2022 | ||
Former [2022/33] | AL | 01.09.2021 | |
AT | 01.09.2021 | ||
EE | 01.09.2021 | ||
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
MC | 01.09.2021 | ||
NL | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
SK | 01.09.2021 | ||
SM | 01.09.2021 | ||
BE | 30.11.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
IS | 01.01.2022 | ||
PT | 03.01.2022 | ||
Former [2022/29] | AL | 01.09.2021 | |
AT | 01.09.2021 | ||
EE | 01.09.2021 | ||
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
NL | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
SK | 01.09.2021 | ||
SM | 01.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
IS | 01.01.2022 | ||
PT | 03.01.2022 | ||
Former [2022/25] | AT | 01.09.2021 | |
EE | 01.09.2021 | ||
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
NL | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
SK | 01.09.2021 | ||
SM | 01.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
IS | 01.01.2022 | ||
PT | 03.01.2022 | ||
Former [2022/24] | AT | 01.09.2021 | |
EE | 01.09.2021 | ||
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
NL | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
SK | 01.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
IS | 01.01.2022 | ||
PT | 03.01.2022 | ||
Former [2022/21] | AT | 01.09.2021 | |
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
Former [2022/10] | ES | 01.09.2021 | |
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
Former [2022/09] | ES | 01.09.2021 | |
FI | 01.09.2021 | ||
LT | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
Former [2022/08] | ES | 01.09.2021 | |
FI | 01.09.2021 | ||
LT | 01.09.2021 | ||
SE | 01.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
Former [2022/07] | LT | 01.09.2021 | |
NO | 01.12.2021 | Documents cited: | Search | [A]EP0197291 (DRUKIER ANDRZEJ KAMIL); | [XY]WO9524719 (FINMECCANICA SPA [IT], et al); | [XY]WO2008132426 (ROLLS ROYCE PLC [GB], et al); | [XA]US2015194225 (WATSON RONALD C [US], et al) |