EP3828316 - DISTRIBUTION SYSTEM FOR A PROCESS FLUID FOR CHEMICAL AND/OR ELECTROLYTIC SURFACE TREATMENT OF A SUBSTRATE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 19.07.2024 Database last updated on 18.11.2024 | |
Former | The patent has been granted Status updated on 11.08.2023 | ||
Former | Grant of patent is intended Status updated on 23.03.2023 | ||
Former | Examination is in progress Status updated on 30.03.2021 | Most recent event Tooltip | 15.11.2024 | Lapse of the patent in a contracting state New state(s): BG | published on 18.12.2024 [2024/51] | Applicant(s) | For all designated states Semsysco GmbH Karolingerstrasse 7C 5020 Salzburg / AT | [2021/22] | Inventor(s) | 01 /
GLEISSNER, Andreas Steinwandweg 3 9873 Döbriach / AT | 02 /
MODL, Harald Zödl 10 9545 Radenthein / AT | [2021/22] | Representative(s) | Maiwald GmbH Elisenhof Elisenstraße 3 80335 München / DE | [2023/37] |
Former [2021/22] | Maiwald Patent- und Rechtsanwaltsgesellschaft mbH Elisenhof Elisenstraße 3 80335 München / DE | Application number, filing date | 19211636.6 | 26.11.2019 | [2021/22] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3828316 | Date: | 02.06.2021 | Language: | EN | [2021/22] | Type: | B1 Patent specification | No.: | EP3828316 | Date: | 13.09.2023 | Language: | EN | [2023/37] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 28.08.2020 | Classification | IPC: | C25D17/00, C25D17/04, C25D17/06, C25D5/08 | [2021/22] | CPC: |
C25D17/002 (EP,CN,KR);
C25D5/08 (EP,CN,KR);
C25D17/04 (EP,CN,KR,US);
C25D17/007 (US);
C25D17/06 (EP,CN,KR,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2021/22] | Title | German: | PROZESSLÖSUNGSVERTEILERSYSTEM FÜR CHEMISCHE UND/ODER ELEKTROLYTISCHE OBERFLÄCHENBEHANDLUNG EINES SUBSTRATES | [2021/22] | English: | DISTRIBUTION SYSTEM FOR A PROCESS FLUID FOR CHEMICAL AND/OR ELECTROLYTIC SURFACE TREATMENT OF A SUBSTRATE | [2021/22] | French: | SYSTÈME DE REPARTITION D'UN LIQUIDE DE PROCÉDÉ POUR TRAITMENT DE SURFACE CHIMIQUE ET/OU ÉLECTROLYTIQUE D'UN SUBSTRAT | [2021/22] | Examination procedure | 16.10.2020 | Amendment by applicant (claims and/or description) | 16.10.2020 | Examination requested [2021/22] | 16.10.2020 | Date on which the examining division has become responsible | 14.12.2020 | Despatch of a communication from the examining division (Time limit: M04) | 29.03.2021 | Reply to a communication from the examining division | 01.06.2021 | Despatch of a communication from the examining division (Time limit: M04) | 07.07.2021 | Reply to a communication from the examining division | 07.09.2021 | Despatch of a communication from the examining division (Time limit: M04) | 10.11.2021 | Reply to a communication from the examining division | 09.12.2021 | Despatch of a communication from the examining division (Time limit: M04) | 16.02.2022 | Reply to a communication from the examining division | 08.04.2022 | Despatch of a communication from the examining division (Time limit: M04) | 17.06.2022 | Reply to a communication from the examining division | 08.08.2022 | Despatch of a communication from the examining division (Time limit: M04) | 11.10.2022 | Reply to a communication from the examining division | 28.11.2022 | Despatch of a communication from the examining division (Time limit: M04) | 26.01.2023 | Reply to a communication from the examining division | 24.03.2023 | Communication of intention to grant the patent | 03.08.2023 | Fee for grant paid | 03.08.2023 | Fee for publishing/printing paid | 03.08.2023 | Receipt of the translation of the claim(s) | Opposition(s) | 14.06.2024 | No opposition filed within time limit [2024/34] | Fees paid | Renewal fee | 26.11.2021 | Renewal fee patent year 03 | 28.11.2022 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | BG | 13.09.2023 | CZ | 13.09.2023 | DK | 13.09.2023 | EE | 13.09.2023 | ES | 13.09.2023 | FI | 13.09.2023 | HR | 13.09.2023 | IT | 13.09.2023 | LT | 13.09.2023 | LV | 13.09.2023 | MC | 13.09.2023 | NL | 13.09.2023 | PL | 13.09.2023 | RO | 13.09.2023 | RS | 13.09.2023 | SE | 13.09.2023 | SI | 13.09.2023 | SK | 13.09.2023 | SM | 13.09.2023 | IE | 26.11.2023 | LU | 26.11.2023 | BE | 30.11.2023 | CH | 30.11.2023 | GB | 13.12.2023 | NO | 13.12.2023 | GR | 14.12.2023 | IS | 13.01.2024 | PT | 15.01.2024 | [2024/51] |
Former [2024/49] | CZ | 13.09.2023 | |
DK | 13.09.2023 | ||
EE | 13.09.2023 | ||
ES | 13.09.2023 | ||
FI | 13.09.2023 | ||
HR | 13.09.2023 | ||
IT | 13.09.2023 | ||
LT | 13.09.2023 | ||
LV | 13.09.2023 | ||
MC | 13.09.2023 | ||
NL | 13.09.2023 | ||
PL | 13.09.2023 | ||
RO | 13.09.2023 | ||
RS | 13.09.2023 | ||
SE | 13.09.2023 | ||
SI | 13.09.2023 | ||
SK | 13.09.2023 | ||
SM | 13.09.2023 | ||
IE | 26.11.2023 | ||
LU | 26.11.2023 | ||
BE | 30.11.2023 | ||
CH | 30.11.2023 | ||
GB | 13.12.2023 | ||
NO | 13.12.2023 | ||
GR | 14.12.2023 | ||
IS | 13.01.2024 | ||
PT | 15.01.2024 | ||
Former [2024/47] | CZ | 13.09.2023 | |
DK | 13.09.2023 | ||
EE | 13.09.2023 | ||
ES | 13.09.2023 | ||
FI | 13.09.2023 | ||
HR | 13.09.2023 | ||
IT | 13.09.2023 | ||
LT | 13.09.2023 | ||
LV | 13.09.2023 | ||
MC | 13.09.2023 | ||
NL | 13.09.2023 | ||
PL | 13.09.2023 | ||
RO | 13.09.2023 | ||
RS | 13.09.2023 | ||
SE | 13.09.2023 | ||
SK | 13.09.2023 | ||
SM | 13.09.2023 | ||
IE | 26.11.2023 | ||
LU | 26.11.2023 | ||
BE | 30.11.2023 | ||
CH | 30.11.2023 | ||
GB | 13.12.2023 | ||
NO | 13.12.2023 | ||
GR | 14.12.2023 | ||
IS | 13.01.2024 | ||
PT | 15.01.2024 | ||
Former [2024/46] | CZ | 13.09.2023 | |
DK | 13.09.2023 | ||
EE | 13.09.2023 | ||
ES | 13.09.2023 | ||
FI | 13.09.2023 | ||
HR | 13.09.2023 | ||
IT | 13.09.2023 | ||
LT | 13.09.2023 | ||
LV | 13.09.2023 | ||
MC | 13.09.2023 | ||
NL | 13.09.2023 | ||
PL | 13.09.2023 | ||
RO | 13.09.2023 | ||
RS | 13.09.2023 | ||
SE | 13.09.2023 | ||
SK | 13.09.2023 | ||
SM | 13.09.2023 | ||
IE | 26.11.2023 | ||
LU | 26.11.2023 | ||
CH | 30.11.2023 | ||
NO | 13.12.2023 | ||
GR | 14.12.2023 | ||
IS | 13.01.2024 | ||
PT | 15.01.2024 | ||
Former [2024/34] | CZ | 13.09.2023 | |
DK | 13.09.2023 | ||
EE | 13.09.2023 | ||
ES | 13.09.2023 | ||
FI | 13.09.2023 | ||
HR | 13.09.2023 | ||
IT | 13.09.2023 | ||
LT | 13.09.2023 | ||
LV | 13.09.2023 | ||
MC | 13.09.2023 | ||
NL | 13.09.2023 | ||
PL | 13.09.2023 | ||
RO | 13.09.2023 | ||
RS | 13.09.2023 | ||
SE | 13.09.2023 | ||
SK | 13.09.2023 | ||
SM | 13.09.2023 | ||
LU | 26.11.2023 | ||
CH | 30.11.2023 | ||
NO | 13.12.2023 | ||
GR | 14.12.2023 | ||
IS | 13.01.2024 | ||
PT | 15.01.2024 | ||
Former [2024/33] | CZ | 13.09.2023 | |
DK | 13.09.2023 | ||
EE | 13.09.2023 | ||
ES | 13.09.2023 | ||
FI | 13.09.2023 | ||
HR | 13.09.2023 | ||
IT | 13.09.2023 | ||
LT | 13.09.2023 | ||
LV | 13.09.2023 | ||
MC | 13.09.2023 | ||
NL | 13.09.2023 | ||
PL | 13.09.2023 | ||
RO | 13.09.2023 | ||
RS | 13.09.2023 | ||
SE | 13.09.2023 | ||
SK | 13.09.2023 | ||
SM | 13.09.2023 | ||
NO | 13.12.2023 | ||
GR | 14.12.2023 | ||
IS | 13.01.2024 | ||
PT | 15.01.2024 | ||
Former [2024/32] | CZ | 13.09.2023 | |
EE | 13.09.2023 | ||
ES | 13.09.2023 | ||
FI | 13.09.2023 | ||
HR | 13.09.2023 | ||
IT | 13.09.2023 | ||
LT | 13.09.2023 | ||
LV | 13.09.2023 | ||
MC | 13.09.2023 | ||
NL | 13.09.2023 | ||
PL | 13.09.2023 | ||
RO | 13.09.2023 | ||
RS | 13.09.2023 | ||
SE | 13.09.2023 | ||
SK | 13.09.2023 | ||
SM | 13.09.2023 | ||
NO | 13.12.2023 | ||
GR | 14.12.2023 | ||
IS | 13.01.2024 | ||
PT | 15.01.2024 | ||
Former [2024/26] | CZ | 13.09.2023 | |
EE | 13.09.2023 | ||
ES | 13.09.2023 | ||
FI | 13.09.2023 | ||
HR | 13.09.2023 | ||
IT | 13.09.2023 | ||
LT | 13.09.2023 | ||
LV | 13.09.2023 | ||
NL | 13.09.2023 | ||
PL | 13.09.2023 | ||
RO | 13.09.2023 | ||
RS | 13.09.2023 | ||
SE | 13.09.2023 | ||
SK | 13.09.2023 | ||
SM | 13.09.2023 | ||
NO | 13.12.2023 | ||
GR | 14.12.2023 | ||
IS | 13.01.2024 | ||
PT | 15.01.2024 | ||
Former [2024/25] | CZ | 13.09.2023 | |
EE | 13.09.2023 | ||
ES | 13.09.2023 | ||
FI | 13.09.2023 | ||
HR | 13.09.2023 | ||
LT | 13.09.2023 | ||
LV | 13.09.2023 | ||
NL | 13.09.2023 | ||
PL | 13.09.2023 | ||
RO | 13.09.2023 | ||
RS | 13.09.2023 | ||
SE | 13.09.2023 | ||
SK | 13.09.2023 | ||
SM | 13.09.2023 | ||
NO | 13.12.2023 | ||
GR | 14.12.2023 | ||
IS | 13.01.2024 | ||
PT | 15.01.2024 | ||
Former [2024/23] | CZ | 13.09.2023 | |
EE | 13.09.2023 | ||
ES | 13.09.2023 | ||
FI | 13.09.2023 | ||
HR | 13.09.2023 | ||
LT | 13.09.2023 | ||
LV | 13.09.2023 | ||
NL | 13.09.2023 | ||
RO | 13.09.2023 | ||
RS | 13.09.2023 | ||
SE | 13.09.2023 | ||
SK | 13.09.2023 | ||
SM | 13.09.2023 | ||
NO | 13.12.2023 | ||
GR | 14.12.2023 | ||
IS | 13.01.2024 | ||
PT | 15.01.2024 | ||
Former [2024/20] | FI | 13.09.2023 | |
HR | 13.09.2023 | ||
LT | 13.09.2023 | ||
LV | 13.09.2023 | ||
NL | 13.09.2023 | ||
RS | 13.09.2023 | ||
SE | 13.09.2023 | ||
SM | 13.09.2023 | ||
NO | 13.12.2023 | ||
GR | 14.12.2023 | ||
IS | 13.01.2024 | ||
Former [2024/14] | FI | 13.09.2023 | |
HR | 13.09.2023 | ||
LT | 13.09.2023 | ||
LV | 13.09.2023 | ||
NL | 13.09.2023 | ||
RS | 13.09.2023 | ||
SE | 13.09.2023 | ||
NO | 13.12.2023 | ||
GR | 14.12.2023 | ||
Former [2024/10] | FI | 13.09.2023 | |
HR | 13.09.2023 | ||
LT | 13.09.2023 | ||
LV | 13.09.2023 | ||
RS | 13.09.2023 | ||
SE | 13.09.2023 | ||
NO | 13.12.2023 | ||
GR | 14.12.2023 | ||
Former [2024/09] | FI | 13.09.2023 | |
LT | 13.09.2023 | ||
SE | 13.09.2023 | ||
NO | 13.12.2023 | ||
GR | 14.12.2023 | ||
Former [2024/08] | LT | 13.09.2023 | |
NO | 13.12.2023 | ||
GR | 14.12.2023 | Documents cited: | Search | [X]DE102010033256 (FRAUNHOFER GES FORSCHUNG [DE]); | [X]US2013001087 (ASA FUJIO [JP], et al); | [X]US9303329 (KEIGLER ARTHUR [US], et al); | [X]GB2564893 (SEMSYSCO GMBH [AT]) |