blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3829028

EP3829028 - METHOD AND DEVICES FOR PROVIDING OPERATIONAL FEEDBACK DURING POWER TRANSFER IN A WIRELESS POWER TRANSFER SYSTEM [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  17.05.2024
Database last updated on 02.09.2024
FormerThe patent has been granted
Status updated on  09.06.2023
FormerGrant of patent is intended
Status updated on  12.02.2023
FormerExamination is in progress
Status updated on  09.04.2021
Most recent event   Tooltip19.07.2024Lapse of the patent in a contracting state
New state(s): CH
published on 21.08.2024  [2024/34]
Applicant(s)For all designated states
ElectDis AB
c/o Adimo AB
Västergatan 22
211 21 Malmö / SE
[2021/22]
Inventor(s)01 / Swaans, Laurens
Nicoloviusgatan 10A
217 57 Malmö / SE
02 / Lau, Buon Kiong
Fjelievägen 38
227 36 Lund / SE
 [2021/22]
Representative(s)Ström & Gulliksson AB
P.O. Box 4188
203 13 Malmö / SE
[2021/22]
Application number, filing date19212476.629.11.2019
[2021/22]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3829028
Date:02.06.2021
Language:EN
[2021/22]
Type: B1 Patent specification 
No.:EP3829028
Date:12.07.2023
Language:EN
[2023/28]
Search report(s)(Supplementary) European search report - dispatched on:EP29.07.2020
ClassificationIPC:H02J50/80, H02J50/10, H04B5/00, H04B5/02, H04B17/15
[2021/22]
CPC:
H04B5/72 (EP,KR); H02J50/80 (EP,CN,KR,US); H04L27/0008 (CN,US);
H02J50/10 (EP,CN,KR,US); H04B17/15 (EP,KR); H04B5/24 (EP,KR);
H04B5/79 (EP,KR); H04L27/02 (CN); H04L27/10 (CN);
H04L5/16 (CN) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2021/22]  
TitleGerman:VERFAHREN UND VORRICHTUNGEN ZUR BEREITSTELLUNG VON BETRIEBSRÜCKKOPPLUNG WÄHREND DER ENERGIEÜBERTRAGUNG IN EINEM DRAHTLOSEN ENERGIEÜBERTRAGUNGSSYSTEM[2021/22]
English:METHOD AND DEVICES FOR PROVIDING OPERATIONAL FEEDBACK DURING POWER TRANSFER IN A WIRELESS POWER TRANSFER SYSTEM[2021/22]
French:PROCÉDÉ ET DISPOSITIFS POUR FOURNIR UNE RÉTROACTION DE FONCTIONNEMENT PENDANT LE TRANSFERT DE PUISSANCE DANS UN SYSTÈME DE TRANSFERT DE PUISSANCE SANS FIL[2021/22]
Examination procedure26.11.2020Amendment by applicant (claims and/or description)
26.11.2020Examination requested  [2021/22]
26.11.2020Date on which the examining division has become responsible
23.02.2021Despatch of a communication from the examining division (Time limit: M04)
07.04.2021Reply to a communication from the examining division
13.02.2023Communication of intention to grant the patent
31.05.2023Fee for grant paid
31.05.2023Fee for publishing/printing paid
31.05.2023Receipt of the translation of the claim(s)
Opposition(s)15.04.2024No opposition filed within time limit [2024/25]
Fees paidRenewal fee
09.11.2021Renewal fee patent year 03
17.11.2022Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipCZ12.07.2023
ES12.07.2023
HR12.07.2023
MC12.07.2023
PL12.07.2023
RO12.07.2023
RS12.07.2023
SK12.07.2023
SM12.07.2023
NO12.10.2023
GR13.10.2023
IS12.11.2023
CH30.11.2023
[2024/34]
Former [2024/32]CZ12.07.2023
ES12.07.2023
HR12.07.2023
MC12.07.2023
PL12.07.2023
RO12.07.2023
RS12.07.2023
SK12.07.2023
SM12.07.2023
NO12.10.2023
GR13.10.2023
IS12.11.2023
Former [2024/23]CZ12.07.2023
ES12.07.2023
HR12.07.2023
PL12.07.2023
RO12.07.2023
RS12.07.2023
SK12.07.2023
SM12.07.2023
NO12.10.2023
GR13.10.2023
IS12.11.2023
Former [2024/20]ES12.07.2023
HR12.07.2023
PL12.07.2023
RS12.07.2023
SM12.07.2023
NO12.10.2023
GR13.10.2023
IS12.11.2023
Former [2024/10]ES12.07.2023
HR12.07.2023
PL12.07.2023
RS12.07.2023
NO12.10.2023
GR13.10.2023
IS12.11.2023
Former [2024/09]ES12.07.2023
NO12.10.2023
GR13.10.2023
IS12.11.2023
Former [2024/08]NO12.10.2023
GR13.10.2023
Documents cited:Search[A]US2013260676  (SINGH MANJIT [US]);
 [XY]US2019058360  (GARBUS BRANDON R [US], et al);
 [Y]EP3542475  (NOK9 IP AB [SE]);
 [Y]WO2019203539  (LG ELECTRONICS INC [KR])
ExaminationUS2019305597
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.