blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3789551

EP3789551 - PUMP-STORAGE DEVICE AND PUMP-STORAGE SEWAGE TRUCK INCLUDING THE SAME [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  01.03.2024
Database last updated on 11.01.2025
FormerThe patent has been granted
Status updated on  24.03.2023
FormerGrant of patent is intended
Status updated on  13.12.2022
FormerRequest for examination was made
Status updated on  03.04.2021
FormerThe application has been published
Status updated on  05.02.2021
Most recent event   Tooltip15.11.2024Lapse of the patent in a contracting state
New state(s): BG
published on 18.12.2024  [2024/51]
Applicant(s)For all designated states
Ke, Shih-Yuan
No.100, Gang-wei
San-Jian Village
Hsin-gang Shiang
Chia Yi Hsien / TW
[2021/10]
Inventor(s)01 / see applicant
...
 [2021/10]
Representative(s)Rowlands, Stuart Michael
Maucher Jenkins
Seventh Floor Offices
Artillery House
11-19 Artillery Row
London SW1P 1RT / GB
[2023/17]
Former [2021/10]Rowlands, Stuart Michael
Maucher Jenkins
26 Caxton Street
London SW1H 0RJ / GB
Application number, filing date19214106.706.12.2019
[2021/10]
Priority number, dateTW2019013208505.09.2019         Original published format: TW 108132085
[2021/10]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3789551
Date:10.03.2021
Language:EN
[2021/10]
Type: B1 Patent specification 
No.:EP3789551
Date:26.04.2023
Language:EN
[2023/17]
Search report(s)(Supplementary) European search report - dispatched on:EP16.07.2020
ClassificationIPC:E03F7/10
[2021/10]
CPC:
E03F7/10 (EP,BR,CN); E03F1/006 (BR); B60P3/224 (KR);
E03F7/103 (BR,US); B01D46/0038 (CN); B01D46/42 (BR);
B01D53/00 (CN); B60P3/22 (BR); E03F5/22 (BR);
E03F7/02 (KR); E03F7/106 (CN,KR,US); E03F9/00 (KR);
F04B23/02 (BR); F04B43/113 (BR); E03F5/107 (KR) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2021/18]
Former [2021/10]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:PUMPSPEICHERVORRICHTUNG UND PUMPSPEICHERABWASSERWAGEN DAMIT[2021/10]
English:PUMP-STORAGE DEVICE AND PUMP-STORAGE SEWAGE TRUCK INCLUDING THE SAME[2021/10]
French:DISPOSITIF D'ACCUMULATION PAR POMPAGE ET CAMION DE VIDANGE À ACCUMULATION PAR POMPAGE LE COMPRENANT[2021/10]
Examination procedure26.03.2021Amendment by applicant (claims and/or description)
26.03.2021Examination requested  [2021/18]
26.03.2021Date on which the examining division has become responsible
14.12.2022Communication of intention to grant the patent
13.03.2023Fee for grant paid
13.03.2023Fee for publishing/printing paid
13.03.2023Receipt of the translation of the claim(s)
Opposition(s)29.01.2024No opposition filed within time limit [2024/14]
Fees paidRenewal fee
30.11.2021Renewal fee patent year 03
13.10.2022Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipAT26.04.2023
BG26.04.2023
DK26.04.2023
EE26.04.2023
FI26.04.2023
HR26.04.2023
LT26.04.2023
LV26.04.2023
MC26.04.2023
RO26.04.2023
RS26.04.2023
SI26.04.2023
SK26.04.2023
SM26.04.2023
NO26.07.2023
GR27.07.2023
IS26.08.2023
PT28.08.2023
IE06.12.2023
LU06.12.2023
BE31.12.2023
CH31.12.2023
[2024/51]
Former [2024/48]AT26.04.2023
DK26.04.2023
EE26.04.2023
FI26.04.2023
HR26.04.2023
LT26.04.2023
LV26.04.2023
MC26.04.2023
RO26.04.2023
RS26.04.2023
SI26.04.2023
SK26.04.2023
SM26.04.2023
NO26.07.2023
GR27.07.2023
IS26.08.2023
PT28.08.2023
IE06.12.2023
LU06.12.2023
BE31.12.2023
CH31.12.2023
Former [2024/47]AT26.04.2023
DK26.04.2023
EE26.04.2023
FI26.04.2023
HR26.04.2023
LT26.04.2023
LV26.04.2023
MC26.04.2023
RO26.04.2023
RS26.04.2023
SI26.04.2023
SK26.04.2023
SM26.04.2023
NO26.07.2023
GR27.07.2023
IS26.08.2023
PT28.08.2023
IE06.12.2023
LU06.12.2023
BE31.12.2023
Former [2024/46]AT26.04.2023
DK26.04.2023
EE26.04.2023
FI26.04.2023
HR26.04.2023
LT26.04.2023
LV26.04.2023
MC26.04.2023
RO26.04.2023
RS26.04.2023
SI26.04.2023
SK26.04.2023
SM26.04.2023
NO26.07.2023
GR27.07.2023
IS26.08.2023
PT28.08.2023
IE06.12.2023
LU06.12.2023
Former [2024/40]AT26.04.2023
DK26.04.2023
EE26.04.2023
FI26.04.2023
HR26.04.2023
LT26.04.2023
LV26.04.2023
MC26.04.2023
RO26.04.2023
RS26.04.2023
SI26.04.2023
SK26.04.2023
SM26.04.2023
NO26.07.2023
GR27.07.2023
IS26.08.2023
PT28.08.2023
LU06.12.2023
Former [2024/25]AT26.04.2023
DK26.04.2023
EE26.04.2023
FI26.04.2023
HR26.04.2023
LT26.04.2023
LV26.04.2023
RO26.04.2023
RS26.04.2023
SI26.04.2023
SK26.04.2023
SM26.04.2023
NO26.07.2023
GR27.07.2023
IS26.08.2023
PT28.08.2023
Former [2024/10]AT26.04.2023
DK26.04.2023
EE26.04.2023
FI26.04.2023
HR26.04.2023
LT26.04.2023
LV26.04.2023
RO26.04.2023
RS26.04.2023
SK26.04.2023
SM26.04.2023
NO26.07.2023
GR27.07.2023
IS26.08.2023
PT28.08.2023
Former [2024/08]AT26.04.2023
FI26.04.2023
HR26.04.2023
LT26.04.2023
LV26.04.2023
RS26.04.2023
SK26.04.2023
SM26.04.2023
NO26.07.2023
GR27.07.2023
IS26.08.2023
PT28.08.2023
Former [2024/03]AT26.04.2023
FI26.04.2023
HR26.04.2023
LT26.04.2023
LV26.04.2023
RS26.04.2023
NO26.07.2023
GR27.07.2023
IS26.08.2023
PT28.08.2023
Former [2024/01]AT26.04.2023
HR26.04.2023
LT26.04.2023
LV26.04.2023
RS26.04.2023
NO26.07.2023
GR27.07.2023
IS26.08.2023
PT28.08.2023
Former [2023/51]AT26.04.2023
HR26.04.2023
RS26.04.2023
NO26.07.2023
GR27.07.2023
IS26.08.2023
PT28.08.2023
Former [2023/50]AT26.04.2023
NO26.07.2023
GR27.07.2023
IS26.08.2023
PT28.08.2023
Former [2023/48]AT26.04.2023
NO26.07.2023
PT28.08.2023
Former [2023/46]PT28.08.2023
Documents cited:Search[A]US3434598  (DAMAN ARTHUR C);
 [A]US2019177961  (KE SHIH-YUAN [TW])
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.