| EP3686479 - FLEXIBLE LIGHTING DEVICE [Right-click to bookmark this link] | |||
| Former [2020/31] | CONNECTION DEVICE AND FLEXIBLE LIGHTING SYSTEM WITH THE SAME | ||
| [2022/43] | Status | No opposition filed within time limit Status updated on 02.02.2024 Database last updated on 26.03.2026 | |
| Former | The patent has been granted Status updated on 24.02.2023 | ||
| Former | Grant of patent is intended Status updated on 10.10.2022 | ||
| Former | Examination is in progress Status updated on 30.04.2021 | ||
| Former | Request for examination was made Status updated on 26.06.2020 | Most recent event Tooltip | 26.12.2025 | Lapse of the patent in a contracting state New state(s): TR | published on 28.01.2026 [2026/05] | Applicant(s) | For all designated states KH Feelux Co., Ltd. 235-48, Gwangjeok-ro Gwangjeok-myeon Yangju-si Gyeonggi-do 11414 / KR | [2021/37] |
| Former [2020/31] | For all designated states Feelux Co., Ltd. 235-48, Gwangjeok-ro Gwangjeok-myeon Yangju-si Gyeonggi-do 11414 / KR | Inventor(s) | 01 /
CHO, Beom Yeon Junggye 1 industrial complex, 311, Nowon-ro Nowon-gu 01787 Seoul / KR | 02 /
JANG, Jun Junggye 1 industrial complex, 311, Nowon-ro Nowon-gu 01787 Seoul / KR | [2020/31] | Representative(s) | BCKIP Part mbB MK1 Landsbergerstraße 98, 3.Stock 80339 München / DE | [N/P] |
| Former [2023/13] | BCKIP Part mbB Siegfriedstraße 8 80803 München / DE | ||
| Former [2020/31] | Isarpatent Patent- und Rechtsanwälte Behnisch Barth Charles Hassa Peckmann & Partner mbB Friedrichstrasse 31 80801 München / DE | Application number, filing date | 19214495.4 | 09.12.2019 | [2020/31] | Priority number, date | KR20190009705 | 25.01.2019 Original published format: KR 20190009705 | KR20190133655 | 25.10.2019 Original published format: KR 20190133655 | [2020/31] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3686479 | Date: | 29.07.2020 | Language: | EN | [2020/31] | Type: | B1 Patent specification | No.: | EP3686479 | Date: | 29.03.2023 | Language: | EN | [2023/13] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 25.05.2020 | Classification | IPC: | F21S4/22, F21V23/06, F21V15/015, F21V21/005, F21V21/02, // H01R33/06 | [2022/43] | CPC: |
F21S4/22 (EP,US);
F21V23/06 (EP,CN,US);
F21V21/005 (EP,US);
F21V15/00 (US);
F21V15/015 (EP);
F21V17/10 (CN);
F21V21/025 (EP);
H01R33/18 (US);
F21Y2103/10 (EP,US);
|
| Former IPC [2020/31] | F21S4/22, F21V23/06, // H01R33/06 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/42] |
| Former [2020/31] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | FLEXIBLES BELEUCHTUNGSSYSTEM | [2022/43] | English: | FLEXIBLE LIGHTING DEVICE | [2022/43] | French: | SYSTÈME D'ÉCLAIRAGE FLEXIBLE | [2022/43] |
| Former [2020/31] | VERBINDUNGSVORRICHTUNG UND FLEXIBLES BELEUCHTUNGSSYSTEM DAMIT | ||
| Former [2020/31] | CONNECTION DEVICE AND FLEXIBLE LIGHTING SYSTEM WITH THE SAME | ||
| Former [2020/31] | DISPOSITIF DE CONNEXION ET SYSTÈME D'ÉCLAIRAGE FLEXIBLE L'UTILISANT | Examination procedure | 09.12.2019 | Examination requested [2020/31] | 04.09.2020 | Amendment by applicant (claims and/or description) | 04.05.2021 | Despatch of a communication from the examining division (Time limit: M04) | 03.09.2021 | Reply to a communication from the examining division | 11.10.2022 | Communication of intention to grant the patent | 15.02.2023 | Fee for grant paid | 15.02.2023 | Fee for publishing/printing paid | 15.02.2023 | Receipt of the translation of the claim(s) | Opposition(s) | 03.01.2024 | No opposition filed within time limit [2024/10] | Fees paid | Renewal fee | 28.12.2021 | Renewal fee patent year 03 | 28.12.2022 | Renewal fee patent year 04 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | CY | 09.12.2019 | HU | 09.12.2019 | AT | 29.03.2023 | BG | 29.03.2023 | CZ | 29.03.2023 | DK | 29.03.2023 | EE | 29.03.2023 | ES | 29.03.2023 | FI | 29.03.2023 | HR | 29.03.2023 | IT | 29.03.2023 | LT | 29.03.2023 | LV | 29.03.2023 | MC | 29.03.2023 | NL | 29.03.2023 | PL | 29.03.2023 | RO | 29.03.2023 | RS | 29.03.2023 | SE | 29.03.2023 | SI | 29.03.2023 | SK | 29.03.2023 | SM | 29.03.2023 | TR | 29.03.2023 | NO | 29.06.2023 | GR | 30.06.2023 | IS | 29.07.2023 | PT | 31.07.2023 | GB | 09.12.2023 | IE | 09.12.2023 | LU | 09.12.2023 | BE | 31.12.2023 | CH | 31.12.2023 | FR | 31.12.2023 | [2026/05] |
| Former [2025/39] | CY | 09.12.2019 | |
| HU | 09.12.2019 | ||
| AT | 29.03.2023 | ||
| BG | 29.03.2023 | ||
| CZ | 29.03.2023 | ||
| DK | 29.03.2023 | ||
| EE | 29.03.2023 | ||
| ES | 29.03.2023 | ||
| FI | 29.03.2023 | ||
| HR | 29.03.2023 | ||
| IT | 29.03.2023 | ||
| LT | 29.03.2023 | ||
| LV | 29.03.2023 | ||
| MC | 29.03.2023 | ||
| NL | 29.03.2023 | ||
| PL | 29.03.2023 | ||
| RO | 29.03.2023 | ||
| RS | 29.03.2023 | ||
| SE | 29.03.2023 | ||
| SI | 29.03.2023 | ||
| SK | 29.03.2023 | ||
| SM | 29.03.2023 | ||
| NO | 29.06.2023 | ||
| GR | 30.06.2023 | ||
| IS | 29.07.2023 | ||
| PT | 31.07.2023 | ||
| GB | 09.12.2023 | ||
| IE | 09.12.2023 | ||
| LU | 09.12.2023 | ||
| BE | 31.12.2023 | ||
| CH | 31.12.2023 | ||
| FR | 31.12.2023 | ||
| Former [2025/36] | CY | 09.12.2019 | |
| AT | 29.03.2023 | ||
| BG | 29.03.2023 | ||
| CZ | 29.03.2023 | ||
| DK | 29.03.2023 | ||
| EE | 29.03.2023 | ||
| ES | 29.03.2023 | ||
| FI | 29.03.2023 | ||
| HR | 29.03.2023 | ||
| IT | 29.03.2023 | ||
| LT | 29.03.2023 | ||
| LV | 29.03.2023 | ||
| MC | 29.03.2023 | ||
| NL | 29.03.2023 | ||
| PL | 29.03.2023 | ||
| RO | 29.03.2023 | ||
| RS | 29.03.2023 | ||
| SE | 29.03.2023 | ||
| SI | 29.03.2023 | ||
| SK | 29.03.2023 | ||
| SM | 29.03.2023 | ||
| NO | 29.06.2023 | ||
| GR | 30.06.2023 | ||
| IS | 29.07.2023 | ||
| PT | 31.07.2023 | ||
| GB | 09.12.2023 | ||
| IE | 09.12.2023 | ||
| LU | 09.12.2023 | ||
| BE | 31.12.2023 | ||
| CH | 31.12.2023 | ||
| FR | 31.12.2023 | ||
| Former [2024/51] | AT | 29.03.2023 | |
| BG | 29.03.2023 | ||
| CZ | 29.03.2023 | ||
| DK | 29.03.2023 | ||
| EE | 29.03.2023 | ||
| ES | 29.03.2023 | ||
| FI | 29.03.2023 | ||
| HR | 29.03.2023 | ||
| IT | 29.03.2023 | ||
| LT | 29.03.2023 | ||
| LV | 29.03.2023 | ||
| MC | 29.03.2023 | ||
| NL | 29.03.2023 | ||
| PL | 29.03.2023 | ||
| RO | 29.03.2023 | ||
| RS | 29.03.2023 | ||
| SE | 29.03.2023 | ||
| SI | 29.03.2023 | ||
| SK | 29.03.2023 | ||
| SM | 29.03.2023 | ||
| NO | 29.06.2023 | ||
| GR | 30.06.2023 | ||
| IS | 29.07.2023 | ||
| PT | 31.07.2023 | ||
| GB | 09.12.2023 | ||
| IE | 09.12.2023 | ||
| LU | 09.12.2023 | ||
| BE | 31.12.2023 | ||
| CH | 31.12.2023 | ||
| FR | 31.12.2023 | ||
| Former [2024/48] | AT | 29.03.2023 | |
| CZ | 29.03.2023 | ||
| DK | 29.03.2023 | ||
| EE | 29.03.2023 | ||
| ES | 29.03.2023 | ||
| FI | 29.03.2023 | ||
| HR | 29.03.2023 | ||
| IT | 29.03.2023 | ||
| LT | 29.03.2023 | ||
| LV | 29.03.2023 | ||
| MC | 29.03.2023 | ||
| NL | 29.03.2023 | ||
| PL | 29.03.2023 | ||
| RO | 29.03.2023 | ||
| RS | 29.03.2023 | ||
| SE | 29.03.2023 | ||
| SI | 29.03.2023 | ||
| SK | 29.03.2023 | ||
| SM | 29.03.2023 | ||
| NO | 29.06.2023 | ||
| GR | 30.06.2023 | ||
| IS | 29.07.2023 | ||
| PT | 31.07.2023 | ||
| GB | 09.12.2023 | ||
| IE | 09.12.2023 | ||
| LU | 09.12.2023 | ||
| BE | 31.12.2023 | ||
| CH | 31.12.2023 | ||
| FR | 31.12.2023 | ||
| Former [2024/47] | AT | 29.03.2023 | |
| CZ | 29.03.2023 | ||
| DK | 29.03.2023 | ||
| EE | 29.03.2023 | ||
| ES | 29.03.2023 | ||
| FI | 29.03.2023 | ||
| HR | 29.03.2023 | ||
| IT | 29.03.2023 | ||
| LT | 29.03.2023 | ||
| LV | 29.03.2023 | ||
| MC | 29.03.2023 | ||
| NL | 29.03.2023 | ||
| PL | 29.03.2023 | ||
| RO | 29.03.2023 | ||
| RS | 29.03.2023 | ||
| SE | 29.03.2023 | ||
| SI | 29.03.2023 | ||
| SK | 29.03.2023 | ||
| SM | 29.03.2023 | ||
| NO | 29.06.2023 | ||
| GR | 30.06.2023 | ||
| IS | 29.07.2023 | ||
| PT | 31.07.2023 | ||
| GB | 09.12.2023 | ||
| IE | 09.12.2023 | ||
| LU | 09.12.2023 | ||
| BE | 31.12.2023 | ||
| FR | 31.12.2023 | ||
| Former [2024/46] | AT | 29.03.2023 | |
| CZ | 29.03.2023 | ||
| DK | 29.03.2023 | ||
| EE | 29.03.2023 | ||
| ES | 29.03.2023 | ||
| FI | 29.03.2023 | ||
| HR | 29.03.2023 | ||
| IT | 29.03.2023 | ||
| LT | 29.03.2023 | ||
| LV | 29.03.2023 | ||
| MC | 29.03.2023 | ||
| NL | 29.03.2023 | ||
| PL | 29.03.2023 | ||
| RO | 29.03.2023 | ||
| RS | 29.03.2023 | ||
| SE | 29.03.2023 | ||
| SI | 29.03.2023 | ||
| SK | 29.03.2023 | ||
| SM | 29.03.2023 | ||
| NO | 29.06.2023 | ||
| GR | 30.06.2023 | ||
| IS | 29.07.2023 | ||
| PT | 31.07.2023 | ||
| IE | 09.12.2023 | ||
| LU | 09.12.2023 | ||
| Former [2024/40] | AT | 29.03.2023 | |
| CZ | 29.03.2023 | ||
| DK | 29.03.2023 | ||
| EE | 29.03.2023 | ||
| ES | 29.03.2023 | ||
| FI | 29.03.2023 | ||
| HR | 29.03.2023 | ||
| IT | 29.03.2023 | ||
| LT | 29.03.2023 | ||
| LV | 29.03.2023 | ||
| MC | 29.03.2023 | ||
| NL | 29.03.2023 | ||
| PL | 29.03.2023 | ||
| RO | 29.03.2023 | ||
| RS | 29.03.2023 | ||
| SE | 29.03.2023 | ||
| SI | 29.03.2023 | ||
| SK | 29.03.2023 | ||
| SM | 29.03.2023 | ||
| NO | 29.06.2023 | ||
| GR | 30.06.2023 | ||
| IS | 29.07.2023 | ||
| PT | 31.07.2023 | ||
| LU | 09.12.2023 | ||
| Former [2024/26] | AT | 29.03.2023 | |
| CZ | 29.03.2023 | ||
| DK | 29.03.2023 | ||
| EE | 29.03.2023 | ||
| ES | 29.03.2023 | ||
| FI | 29.03.2023 | ||
| HR | 29.03.2023 | ||
| IT | 29.03.2023 | ||
| LT | 29.03.2023 | ||
| LV | 29.03.2023 | ||
| NL | 29.03.2023 | ||
| PL | 29.03.2023 | ||
| RO | 29.03.2023 | ||
| RS | 29.03.2023 | ||
| SE | 29.03.2023 | ||
| SI | 29.03.2023 | ||
| SK | 29.03.2023 | ||
| SM | 29.03.2023 | ||
| NO | 29.06.2023 | ||
| GR | 30.06.2023 | ||
| IS | 29.07.2023 | ||
| PT | 31.07.2023 | ||
| Former [2024/25] | AT | 29.03.2023 | |
| CZ | 29.03.2023 | ||
| DK | 29.03.2023 | ||
| EE | 29.03.2023 | ||
| ES | 29.03.2023 | ||
| FI | 29.03.2023 | ||
| HR | 29.03.2023 | ||
| LT | 29.03.2023 | ||
| LV | 29.03.2023 | ||
| NL | 29.03.2023 | ||
| PL | 29.03.2023 | ||
| RO | 29.03.2023 | ||
| RS | 29.03.2023 | ||
| SE | 29.03.2023 | ||
| SI | 29.03.2023 | ||
| SK | 29.03.2023 | ||
| SM | 29.03.2023 | ||
| NO | 29.06.2023 | ||
| GR | 30.06.2023 | ||
| IS | 29.07.2023 | ||
| PT | 31.07.2023 | ||
| Former [2024/10] | AT | 29.03.2023 | |
| CZ | 29.03.2023 | ||
| DK | 29.03.2023 | ||
| EE | 29.03.2023 | ||
| ES | 29.03.2023 | ||
| FI | 29.03.2023 | ||
| HR | 29.03.2023 | ||
| LT | 29.03.2023 | ||
| LV | 29.03.2023 | ||
| NL | 29.03.2023 | ||
| PL | 29.03.2023 | ||
| RO | 29.03.2023 | ||
| RS | 29.03.2023 | ||
| SE | 29.03.2023 | ||
| SK | 29.03.2023 | ||
| SM | 29.03.2023 | ||
| NO | 29.06.2023 | ||
| GR | 30.06.2023 | ||
| IS | 29.07.2023 | ||
| PT | 31.07.2023 | ||
| Former [2023/50] | AT | 29.03.2023 | |
| EE | 29.03.2023 | ||
| ES | 29.03.2023 | ||
| FI | 29.03.2023 | ||
| HR | 29.03.2023 | ||
| LT | 29.03.2023 | ||
| LV | 29.03.2023 | ||
| NL | 29.03.2023 | ||
| PL | 29.03.2023 | ||
| RO | 29.03.2023 | ||
| RS | 29.03.2023 | ||
| SE | 29.03.2023 | ||
| SK | 29.03.2023 | ||
| SM | 29.03.2023 | ||
| NO | 29.06.2023 | ||
| GR | 30.06.2023 | ||
| IS | 29.07.2023 | ||
| PT | 31.07.2023 | ||
| Former [2023/49] | AT | 29.03.2023 | |
| EE | 29.03.2023 | ||
| ES | 29.03.2023 | ||
| FI | 29.03.2023 | ||
| HR | 29.03.2023 | ||
| LT | 29.03.2023 | ||
| LV | 29.03.2023 | ||
| NL | 29.03.2023 | ||
| RO | 29.03.2023 | ||
| RS | 29.03.2023 | ||
| SE | 29.03.2023 | ||
| SM | 29.03.2023 | ||
| NO | 29.06.2023 | ||
| GR | 30.06.2023 | ||
| PT | 31.07.2023 | ||
| Former [2023/48] | AT | 29.03.2023 | |
| EE | 29.03.2023 | ||
| ES | 29.03.2023 | ||
| FI | 29.03.2023 | ||
| HR | 29.03.2023 | ||
| LT | 29.03.2023 | ||
| LV | 29.03.2023 | ||
| NL | 29.03.2023 | ||
| RS | 29.03.2023 | ||
| SE | 29.03.2023 | ||
| SM | 29.03.2023 | ||
| NO | 29.06.2023 | ||
| GR | 30.06.2023 | ||
| PT | 31.07.2023 | ||
| Former [2023/46] | ES | 29.03.2023 | |
| FI | 29.03.2023 | ||
| HR | 29.03.2023 | ||
| LT | 29.03.2023 | ||
| LV | 29.03.2023 | ||
| NL | 29.03.2023 | ||
| RS | 29.03.2023 | ||
| SE | 29.03.2023 | ||
| SM | 29.03.2023 | ||
| NO | 29.06.2023 | ||
| GR | 30.06.2023 | ||
| PT | 31.07.2023 | ||
| Former [2023/38] | FI | 29.03.2023 | |
| HR | 29.03.2023 | ||
| LT | 29.03.2023 | ||
| LV | 29.03.2023 | ||
| NL | 29.03.2023 | ||
| RS | 29.03.2023 | ||
| SE | 29.03.2023 | ||
| NO | 29.06.2023 | ||
| GR | 30.06.2023 | ||
| Former [2023/37] | FI | 29.03.2023 | |
| HR | 29.03.2023 | ||
| LT | 29.03.2023 | ||
| LV | 29.03.2023 | ||
| RS | 29.03.2023 | ||
| SE | 29.03.2023 | ||
| NO | 29.06.2023 | ||
| GR | 30.06.2023 | ||
| Former [2023/36] | FI | 29.03.2023 | |
| HR | 29.03.2023 | ||
| LT | 29.03.2023 | ||
| LV | 29.03.2023 | ||
| RS | 29.03.2023 | ||
| SE | 29.03.2023 | ||
| NO | 29.06.2023 | ||
| Former [2023/35] | HR | 29.03.2023 | |
| LT | 29.03.2023 | ||
| RS | 29.03.2023 | ||
| NO | 29.06.2023 | ||
| Former [2023/34] | LT | 29.03.2023 | |
| RS | 29.03.2023 | ||
| Former [2023/33] | LT | 29.03.2023 | Documents cited: | Search | [XYI] CN107091465 (HESHAN NEO-NEON LIGHTING CO LTD et al.) [X] 1-5,7,8,10,11,13-15 * paragraph [0047]; figures 5-7 *[Y] 6 [I] 16 | [X] EP2209165 (EREA NV et al.) [X] 1,3-5,12 * paragraphs [0044] - [0046]; figure 4 * | [X] CN108105617 (GUANGZHOU LEDIA LIGHTING CO LTD et al.) [X] 1-5,7-11,13-15 * figure 1; claim 1 * | [YA] EP2012054 (ALLIANCE OPTOTEK CO LTD et al.) [Y] 6 * figure 1 *[A] 1 | [A] CN208222461 (HUANG HONGGEN et al.) [A] 1 * abstract * | Examination | EP2209165 | CN107795968 |