blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3751165

EP3751165 - OVERLOAD CLUTCH WITH SECOND STAGE SETTING [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  26.01.2024
Database last updated on 14.09.2024
FormerThe patent has been granted
Status updated on  17.02.2023
FormerGrant of patent is intended
Status updated on  19.10.2022
FormerRequest for examination was made
Status updated on  08.07.2022
FormerGrant of patent is intended
Status updated on  08.03.2022
FormerRequest for examination was made
Status updated on  28.05.2021
FormerThe application has been published
Status updated on  13.11.2020
Most recent event   Tooltip30.08.2024Lapse of the patent in a contracting state
New state(s): LU, MC
published on 02.10.2024 [2024/40]
Applicant(s)For all designated states
Goodrich Corporation
4 Coliseum Centre
2730 West Tyvola Road
Charlotte, NC 28217-4578 / US
[2020/51]
Inventor(s)01 / MAGHSOODI, Bejan
1618 Avenida Entrada
San Dimas, CA 91773 / US
 [2020/51]
Representative(s)Dehns
St. Bride's House
10 Salisbury Square
London EC4Y 8JD / GB
[2020/51]
Application number, filing date19216323.613.12.2019
[2020/51]
Priority number, dateUS20191643675710.06.2019         Original published format: US201916436757
[2020/51]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3751165
Date:16.12.2020
Language:EN
[2020/51]
Type: B1 Patent specification 
No.:EP3751165
Date:22.03.2023
Language:EN
[2023/12]
Search report(s)(Supplementary) European search report - dispatched on:EP03.08.2020
ClassificationIPC:F16D13/56, F16D13/71
[2020/51]
CPC:
F16D13/56 (EP); F16D13/54 (US); B66D1/16 (US);
F16D13/71 (EP); F16D23/12 (US); B66D2700/0125 (US);
F16D2023/123 (US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2021/26]
Former [2020/51]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:ÜBERLASTKUPPLUNG MIT ZWEITER STUFENEINSTELLUNG[2020/51]
English:OVERLOAD CLUTCH WITH SECOND STAGE SETTING[2020/51]
French:EMBRAYAGE DE SURCHARGE AYANT UN RÉGLAGE DU DEUXIÈME ÉTAGE[2020/51]
Examination procedure26.05.2021Amendment by applicant (claims and/or description)
26.05.2021Examination requested  [2021/26]
26.05.2021Date on which the examining division has become responsible
09.03.2022Communication of intention to grant the patent
06.07.2022Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO
20.10.2022Communication of intention to grant the patent
09.02.2023Fee for grant paid
09.02.2023Fee for publishing/printing paid
09.02.2023Receipt of the translation of the claim(s)
Opposition(s)02.01.2024No opposition filed within time limit [2024/09]
Fees paidRenewal fee
16.12.2021Renewal fee patent year 03
20.12.2022Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipAT22.03.2023
CZ22.03.2023
DK22.03.2023
EE22.03.2023
ES22.03.2023
FI22.03.2023
HR22.03.2023
IT22.03.2023
LT22.03.2023
LV22.03.2023
MC22.03.2023
NL22.03.2023
PL22.03.2023
RO22.03.2023
RS22.03.2023
SE22.03.2023
SI22.03.2023
SK22.03.2023
SM22.03.2023
NO22.06.2023
GR23.06.2023
IS22.07.2023
PT24.07.2023
LU13.12.2023
[2024/40]
Former [2024/26]AT22.03.2023
CZ22.03.2023
DK22.03.2023
EE22.03.2023
ES22.03.2023
FI22.03.2023
HR22.03.2023
IT22.03.2023
LT22.03.2023
LV22.03.2023
NL22.03.2023
PL22.03.2023
RO22.03.2023
RS22.03.2023
SE22.03.2023
SI22.03.2023
SK22.03.2023
SM22.03.2023
NO22.06.2023
GR23.06.2023
IS22.07.2023
PT24.07.2023
Former [2024/10]AT22.03.2023
CZ22.03.2023
DK22.03.2023
EE22.03.2023
ES22.03.2023
FI22.03.2023
HR22.03.2023
LT22.03.2023
LV22.03.2023
NL22.03.2023
PL22.03.2023
RO22.03.2023
RS22.03.2023
SE22.03.2023
SI22.03.2023
SK22.03.2023
SM22.03.2023
NO22.06.2023
GR23.06.2023
IS22.07.2023
PT24.07.2023
Former [2023/50]AT22.03.2023
EE22.03.2023
ES22.03.2023
FI22.03.2023
HR22.03.2023
LT22.03.2023
LV22.03.2023
NL22.03.2023
PL22.03.2023
RO22.03.2023
RS22.03.2023
SE22.03.2023
SK22.03.2023
SM22.03.2023
NO22.06.2023
GR23.06.2023
IS22.07.2023
PT24.07.2023
Former [2023/49]AT22.03.2023
EE22.03.2023
ES22.03.2023
FI22.03.2023
HR22.03.2023
LT22.03.2023
LV22.03.2023
NL22.03.2023
RO22.03.2023
RS22.03.2023
SE22.03.2023
SM22.03.2023
NO22.06.2023
GR23.06.2023
PT24.07.2023
Former [2023/48]AT22.03.2023
EE22.03.2023
ES22.03.2023
FI22.03.2023
HR22.03.2023
LT22.03.2023
LV22.03.2023
NL22.03.2023
RS22.03.2023
SE22.03.2023
SM22.03.2023
NO22.06.2023
GR23.06.2023
PT24.07.2023
Former [2023/46]ES22.03.2023
FI22.03.2023
HR22.03.2023
LT22.03.2023
LV22.03.2023
NL22.03.2023
RS22.03.2023
SE22.03.2023
SM22.03.2023
NO22.06.2023
GR23.06.2023
PT24.07.2023
Former [2023/38]FI22.03.2023
HR22.03.2023
LT22.03.2023
LV22.03.2023
NL22.03.2023
RS22.03.2023
SE22.03.2023
NO22.06.2023
GR23.06.2023
Former [2023/37]FI22.03.2023
HR22.03.2023
LT22.03.2023
LV22.03.2023
RS22.03.2023
SE22.03.2023
NO22.06.2023
GR23.06.2023
Former [2023/36]FI22.03.2023
HR22.03.2023
LT22.03.2023
LV22.03.2023
RS22.03.2023
SE22.03.2023
NO22.06.2023
Former [2023/35]HR22.03.2023
LT22.03.2023
RS22.03.2023
NO22.06.2023
Former [2023/34]LT22.03.2023
RS22.03.2023
Former [2023/33]LT22.03.2023
Documents cited:Search[XA]JPS59231217  (YAMAHA MOTOR CO LTD) [X] 1-5,8-10 * English translation relative to figure 3.;; figure 3 * [A] 6,7,11-15;
 [A]DE102015202730  (SCHAEFFLER TECHNOLOGIES AG [DE]) [A] 1* paragraph [0027] - paragraph [0030]; figure 3 *;
 [A]WO2017129178  (SCHAEFFLER TECHNOLOGIES AG [DE]) [A] 1 * page 3, line 1 - page 5, line 40; figures 8,9 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.