| EP3671059 - DEVICE FOR CLIMATE TREATMENT AND AIR RENEWAL FOR A ROOM LOCATED IN A BUILDING [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 16.12.2022 Database last updated on 19.03.2026 | |
| Former | The patent has been granted Status updated on 07.01.2022 | ||
| Former | Grant of patent is intended Status updated on 16.09.2021 | ||
| Former | Request for examination was made Status updated on 27.11.2020 | ||
| Former | The application has been published Status updated on 22.05.2020 | Most recent event Tooltip | 26.12.2025 | Lapse of the patent in a contracting state New state(s): TR | published on 28.01.2026 [2026/05] | Applicant(s) | For all designated states MULLER ET CIE 107 Boulevard Ney 75018 Paris / FR | [2020/26] | Inventor(s) | 01 /
FEVRIER, Bruno 24 rue Ambroise Gestière 53100 Mayenne / FR | 02 /
MARRACHE, Henri 21 rue Babeuf 94270 Le Kremlin Bicetre / FR | [2022/06] |
| Former [2020/26] | 01 /
FEVRIER, Bruno 24 rue Ambroise GESTIERE 53100 MAYENNE / FR | ||
| 02 /
MARRACHE, Henri 21 rue Babeuf 94270 LE KREMLIN BICETRE / FR | Representative(s) | Lavoix 2, place d'Estienne d'Orves 75441 Paris Cedex 09 / FR | [2020/26] | Application number, filing date | 19216543.9 | 16.12.2019 | [2020/26] | Priority number, date | FR20180073187 | 18.12.2018 Original published format: FR 1873187 | [2020/26] | Filing language | FR | Procedural language | FR | Publication | Type: | A1 Application with search report | No.: | EP3671059 | Date: | 24.06.2020 | Language: | FR | [2020/26] | Type: | B1 Patent specification | No.: | EP3671059 | Date: | 09.02.2022 | Language: | FR | [2022/06] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 21.04.2020 | Classification | IPC: | F24F12/00, F24F13/20 | [2020/26] | CPC: |
F24F12/006 (EP);
F24D5/12 (EP);
F24F2012/007 (EP);
Y02B30/56 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2021/01] |
| Former [2020/26] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | KLIMA- UND LUFTAUFBEREITUNGSANLAGE FÜR EINEN RAUM IN EINEM GEBÄUDE | [2020/26] | English: | DEVICE FOR CLIMATE TREATMENT AND AIR RENEWAL FOR A ROOM LOCATED IN A BUILDING | [2020/26] | French: | APPAREIL DE TRAITEMENT CLIMATIQUE ET DE RENOUVELLEMENT D'AIR POUR UN LOCAL SITUÉ DANS UN BÂTIMENT | [2020/26] | Examination procedure | 14.09.2020 | Amendment by applicant (claims and/or description) | 25.11.2020 | Examination requested [2020/53] | 25.11.2020 | Date on which the examining division has become responsible | 17.09.2021 | Communication of intention to grant the patent | 27.12.2021 | Fee for grant paid | 27.12.2021 | Fee for publishing/printing paid | 27.12.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 10.11.2022 | No opposition filed within time limit [2023/03] | Fees paid | Renewal fee | 18.11.2021 | Renewal fee patent year 03 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 16.12.2019 | AL | 09.02.2022 | AT | 09.02.2022 | CY | 09.02.2022 | CZ | 09.02.2022 | DK | 09.02.2022 | EE | 09.02.2022 | FI | 09.02.2022 | HR | 09.02.2022 | LT | 09.02.2022 | LV | 09.02.2022 | MK | 09.02.2022 | MT | 09.02.2022 | NL | 09.02.2022 | PL | 09.02.2022 | RO | 09.02.2022 | RS | 09.02.2022 | SE | 09.02.2022 | SI | 09.02.2022 | SK | 09.02.2022 | SM | 09.02.2022 | TR | 09.02.2022 | BG | 09.05.2022 | NO | 09.05.2022 | GR | 10.05.2022 | IS | 09.06.2022 | PT | 09.06.2022 | [2026/05] |
| Former [2024/44] | HU | 16.12.2019 | |
| AL | 09.02.2022 | ||
| AT | 09.02.2022 | ||
| CY | 09.02.2022 | ||
| CZ | 09.02.2022 | ||
| DK | 09.02.2022 | ||
| EE | 09.02.2022 | ||
| FI | 09.02.2022 | ||
| HR | 09.02.2022 | ||
| LT | 09.02.2022 | ||
| LV | 09.02.2022 | ||
| MK | 09.02.2022 | ||
| MT | 09.02.2022 | ||
| NL | 09.02.2022 | ||
| PL | 09.02.2022 | ||
| RO | 09.02.2022 | ||
| RS | 09.02.2022 | ||
| SE | 09.02.2022 | ||
| SI | 09.02.2022 | ||
| SK | 09.02.2022 | ||
| SM | 09.02.2022 | ||
| BG | 09.05.2022 | ||
| NO | 09.05.2022 | ||
| GR | 10.05.2022 | ||
| IS | 09.06.2022 | ||
| PT | 09.06.2022 | ||
| Former [2024/27] | HU | 16.12.2019 | |
| AL | 09.02.2022 | ||
| AT | 09.02.2022 | ||
| CY | 09.02.2022 | ||
| CZ | 09.02.2022 | ||
| DK | 09.02.2022 | ||
| EE | 09.02.2022 | ||
| FI | 09.02.2022 | ||
| HR | 09.02.2022 | ||
| LT | 09.02.2022 | ||
| LV | 09.02.2022 | ||
| MK | 09.02.2022 | ||
| NL | 09.02.2022 | ||
| PL | 09.02.2022 | ||
| RO | 09.02.2022 | ||
| RS | 09.02.2022 | ||
| SE | 09.02.2022 | ||
| SI | 09.02.2022 | ||
| SK | 09.02.2022 | ||
| SM | 09.02.2022 | ||
| BG | 09.05.2022 | ||
| NO | 09.05.2022 | ||
| GR | 10.05.2022 | ||
| IS | 09.06.2022 | ||
| PT | 09.06.2022 | ||
| Former [2024/21] | HU | 16.12.2019 | |
| AL | 09.02.2022 | ||
| AT | 09.02.2022 | ||
| CY | 09.02.2022 | ||
| CZ | 09.02.2022 | ||
| DK | 09.02.2022 | ||
| EE | 09.02.2022 | ||
| FI | 09.02.2022 | ||
| HR | 09.02.2022 | ||
| LT | 09.02.2022 | ||
| LV | 09.02.2022 | ||
| NL | 09.02.2022 | ||
| PL | 09.02.2022 | ||
| RO | 09.02.2022 | ||
| RS | 09.02.2022 | ||
| SE | 09.02.2022 | ||
| SI | 09.02.2022 | ||
| SK | 09.02.2022 | ||
| SM | 09.02.2022 | ||
| BG | 09.05.2022 | ||
| NO | 09.05.2022 | ||
| GR | 10.05.2022 | ||
| IS | 09.06.2022 | ||
| PT | 09.06.2022 | ||
| Former [2024/18] | HU | 16.12.2019 | |
| AL | 09.02.2022 | ||
| AT | 09.02.2022 | ||
| CZ | 09.02.2022 | ||
| DK | 09.02.2022 | ||
| EE | 09.02.2022 | ||
| FI | 09.02.2022 | ||
| HR | 09.02.2022 | ||
| LT | 09.02.2022 | ||
| LV | 09.02.2022 | ||
| NL | 09.02.2022 | ||
| PL | 09.02.2022 | ||
| RO | 09.02.2022 | ||
| RS | 09.02.2022 | ||
| SE | 09.02.2022 | ||
| SI | 09.02.2022 | ||
| SK | 09.02.2022 | ||
| SM | 09.02.2022 | ||
| BG | 09.05.2022 | ||
| NO | 09.05.2022 | ||
| GR | 10.05.2022 | ||
| IS | 09.06.2022 | ||
| PT | 09.06.2022 | ||
| Former [2023/10] | AL | 09.02.2022 | |
| AT | 09.02.2022 | ||
| CZ | 09.02.2022 | ||
| DK | 09.02.2022 | ||
| EE | 09.02.2022 | ||
| FI | 09.02.2022 | ||
| HR | 09.02.2022 | ||
| LT | 09.02.2022 | ||
| LV | 09.02.2022 | ||
| NL | 09.02.2022 | ||
| PL | 09.02.2022 | ||
| RO | 09.02.2022 | ||
| RS | 09.02.2022 | ||
| SE | 09.02.2022 | ||
| SI | 09.02.2022 | ||
| SK | 09.02.2022 | ||
| SM | 09.02.2022 | ||
| BG | 09.05.2022 | ||
| NO | 09.05.2022 | ||
| GR | 10.05.2022 | ||
| IS | 09.06.2022 | ||
| PT | 09.06.2022 | ||
| Former [2023/01] | AL | 09.02.2022 | |
| AT | 09.02.2022 | ||
| CZ | 09.02.2022 | ||
| DK | 09.02.2022 | ||
| EE | 09.02.2022 | ||
| FI | 09.02.2022 | ||
| HR | 09.02.2022 | ||
| LT | 09.02.2022 | ||
| LV | 09.02.2022 | ||
| NL | 09.02.2022 | ||
| PL | 09.02.2022 | ||
| RO | 09.02.2022 | ||
| RS | 09.02.2022 | ||
| SE | 09.02.2022 | ||
| SK | 09.02.2022 | ||
| SM | 09.02.2022 | ||
| BG | 09.05.2022 | ||
| NO | 09.05.2022 | ||
| GR | 10.05.2022 | ||
| IS | 09.06.2022 | ||
| PT | 09.06.2022 | ||
| Former [2022/49] | AT | 09.02.2022 | |
| CZ | 09.02.2022 | ||
| DK | 09.02.2022 | ||
| EE | 09.02.2022 | ||
| FI | 09.02.2022 | ||
| HR | 09.02.2022 | ||
| LT | 09.02.2022 | ||
| LV | 09.02.2022 | ||
| NL | 09.02.2022 | ||
| PL | 09.02.2022 | ||
| RO | 09.02.2022 | ||
| RS | 09.02.2022 | ||
| SE | 09.02.2022 | ||
| SK | 09.02.2022 | ||
| SM | 09.02.2022 | ||
| BG | 09.05.2022 | ||
| NO | 09.05.2022 | ||
| GR | 10.05.2022 | ||
| IS | 09.06.2022 | ||
| PT | 09.06.2022 | ||
| Former [2022/48] | AT | 09.02.2022 | |
| CZ | 09.02.2022 | ||
| DK | 09.02.2022 | ||
| EE | 09.02.2022 | ||
| FI | 09.02.2022 | ||
| HR | 09.02.2022 | ||
| LT | 09.02.2022 | ||
| LV | 09.02.2022 | ||
| NL | 09.02.2022 | ||
| PL | 09.02.2022 | ||
| RO | 09.02.2022 | ||
| RS | 09.02.2022 | ||
| SE | 09.02.2022 | ||
| SM | 09.02.2022 | ||
| BG | 09.05.2022 | ||
| NO | 09.05.2022 | ||
| GR | 10.05.2022 | ||
| IS | 09.06.2022 | ||
| PT | 09.06.2022 | ||
| Former [2022/47] | AT | 09.02.2022 | |
| DK | 09.02.2022 | ||
| FI | 09.02.2022 | ||
| HR | 09.02.2022 | ||
| LT | 09.02.2022 | ||
| LV | 09.02.2022 | ||
| NL | 09.02.2022 | ||
| PL | 09.02.2022 | ||
| RO | 09.02.2022 | ||
| RS | 09.02.2022 | ||
| SE | 09.02.2022 | ||
| SM | 09.02.2022 | ||
| BG | 09.05.2022 | ||
| NO | 09.05.2022 | ||
| GR | 10.05.2022 | ||
| IS | 09.06.2022 | ||
| PT | 09.06.2022 | ||
| Former [2022/46] | AT | 09.02.2022 | |
| DK | 09.02.2022 | ||
| FI | 09.02.2022 | ||
| HR | 09.02.2022 | ||
| LT | 09.02.2022 | ||
| LV | 09.02.2022 | ||
| NL | 09.02.2022 | ||
| PL | 09.02.2022 | ||
| RS | 09.02.2022 | ||
| SE | 09.02.2022 | ||
| BG | 09.05.2022 | ||
| NO | 09.05.2022 | ||
| GR | 10.05.2022 | ||
| IS | 09.06.2022 | ||
| PT | 09.06.2022 | ||
| Former [2022/42] | AT | 09.02.2022 | |
| FI | 09.02.2022 | ||
| HR | 09.02.2022 | ||
| LT | 09.02.2022 | ||
| LV | 09.02.2022 | ||
| NL | 09.02.2022 | ||
| PL | 09.02.2022 | ||
| RS | 09.02.2022 | ||
| SE | 09.02.2022 | ||
| BG | 09.05.2022 | ||
| NO | 09.05.2022 | ||
| GR | 10.05.2022 | ||
| IS | 09.06.2022 | ||
| PT | 09.06.2022 | ||
| Former [2022/39] | AT | 09.02.2022 | |
| FI | 09.02.2022 | ||
| HR | 09.02.2022 | ||
| LT | 09.02.2022 | ||
| LV | 09.02.2022 | ||
| NL | 09.02.2022 | ||
| PL | 09.02.2022 | ||
| RS | 09.02.2022 | ||
| SE | 09.02.2022 | ||
| BG | 09.05.2022 | ||
| NO | 09.05.2022 | ||
| GR | 10.05.2022 | ||
| PT | 09.06.2022 | ||
| Former [2022/36] | AT | 09.02.2022 | |
| HR | 09.02.2022 | ||
| LT | 09.02.2022 | ||
| LV | 09.02.2022 | ||
| NL | 09.02.2022 | ||
| PL | 09.02.2022 | ||
| RS | 09.02.2022 | ||
| SE | 09.02.2022 | ||
| BG | 09.05.2022 | ||
| NO | 09.05.2022 | ||
| GR | 10.05.2022 | ||
| PT | 09.06.2022 | ||
| Former [2022/35] | HR | 09.02.2022 | |
| LT | 09.02.2022 | ||
| NL | 09.02.2022 | ||
| RS | 09.02.2022 | ||
| SE | 09.02.2022 | ||
| BG | 09.05.2022 | ||
| NO | 09.05.2022 | ||
| PT | 09.06.2022 | ||
| Former [2022/34] | LT | 09.02.2022 | |
| NL | 09.02.2022 | ||
| NO | 09.05.2022 | ||
| PT | 09.06.2022 | ||
| Former [2022/33] | LT | 09.02.2022 | |
| NO | 09.05.2022 | Documents cited: | Search | [XAYI] WO2006080599 (LG ELECTRONICS INC et al.) | [XAYI] DE3027447 (SCHMITTEL HORST JOACHIM et al.) [X] 1,3,8 * page 9, line 9 - page 10, line 20 * * page 23, line 11 - page 24, line 5 * * page 25, line 19 - page 26, line 5 * * page 28, lines 2-8 * * figures 1, 2, 6, 9 *[A] 6,7,9-13 [Y] 4,5 [I] 2 | [IY] EP0055000 (PHILIPS PATENTVERWALTUNG et al.) [I] 1-3 * page 10, line 23 - page 11, line 3 * * page 12 * * figures 1, 2 *[Y] 4,5 | by applicant | FR3011913 |