EP3656936 - LIFTING ASSEMBLY [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 24.06.2022 Database last updated on 18.10.2024 | |
Former | The patent has been granted Status updated on 16.07.2021 | ||
Former | Grant of patent is intended Status updated on 17.03.2021 | ||
Former | Request for examination was made Status updated on 29.05.2020 | ||
Former | The application has been published Status updated on 24.04.2020 | Most recent event Tooltip | 13.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 16.10.2024 [2024/42] | Applicant(s) | For all designated states Kessel AG Bahnhofstrasse 31 85101 Lenting / DE | [2020/22] | Inventor(s) | 01 /
Kessel, Bernhard Am Kalkbrenner 4 85101 Lenting / DE | [2020/22] | Representative(s) | Grünecker Patent- und Rechtsanwälte PartG mbB Leopoldstraße 4 80802 München / DE | [2020/22] | Application number, filing date | 19216906.8 | 25.10.2018 | [2020/22] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | EP3656936 | Date: | 27.05.2020 | Language: | DE | [2020/22] | Type: | B1 Patent specification | No.: | EP3656936 | Date: | 18.08.2021 | Language: | DE | [2021/33] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 28.04.2020 | Classification | IPC: | E03F5/22, E03F7/04 | [2020/22] | CPC: |
E03F5/22 (EP);
E03F7/04 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/27] |
Former [2020/22] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | HEBEANLAGE | [2020/22] | English: | LIFTING ASSEMBLY | [2020/22] | French: | SYSTÈME DE LEVAGE | [2020/22] | Examination procedure | 27.05.2020 | Amendment by applicant (claims and/or description) | 27.05.2020 | Examination requested [2020/27] | 27.05.2020 | Date on which the examining division has become responsible | 18.03.2021 | Communication of intention to grant the patent | 07.07.2021 | Fee for grant paid | 07.07.2021 | Fee for publishing/printing paid | 07.07.2021 | Receipt of the translation of the claim(s) | Parent application(s) Tooltip | EP18202460.4 / EP3643845 | Opposition(s) | 19.05.2022 | No opposition filed within time limit [2022/30] | Fees paid | Renewal fee | 22.10.2020 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 25.10.2018 | AL | 18.08.2021 | CY | 18.08.2021 | CZ | 18.08.2021 | DK | 18.08.2021 | EE | 18.08.2021 | ES | 18.08.2021 | FI | 18.08.2021 | HR | 18.08.2021 | IT | 18.08.2021 | LT | 18.08.2021 | LV | 18.08.2021 | MC | 18.08.2021 | MK | 18.08.2021 | MT | 18.08.2021 | NL | 18.08.2021 | RO | 18.08.2021 | RS | 18.08.2021 | SI | 18.08.2021 | SK | 18.08.2021 | SM | 18.08.2021 | IE | 25.10.2021 | LU | 25.10.2021 | BE | 31.10.2021 | BG | 18.11.2021 | NO | 18.11.2021 | GR | 19.11.2021 | IS | 18.12.2021 | PT | 20.12.2021 | [2024/42] |
Former [2024/23] | HU | 25.10.2018 | |
AL | 18.08.2021 | ||
CY | 18.08.2021 | ||
CZ | 18.08.2021 | ||
DK | 18.08.2021 | ||
EE | 18.08.2021 | ||
ES | 18.08.2021 | ||
FI | 18.08.2021 | ||
HR | 18.08.2021 | ||
IT | 18.08.2021 | ||
LT | 18.08.2021 | ||
LV | 18.08.2021 | ||
MC | 18.08.2021 | ||
MK | 18.08.2021 | ||
NL | 18.08.2021 | ||
RO | 18.08.2021 | ||
RS | 18.08.2021 | ||
SI | 18.08.2021 | ||
SK | 18.08.2021 | ||
SM | 18.08.2021 | ||
IE | 25.10.2021 | ||
LU | 25.10.2021 | ||
BE | 31.10.2021 | ||
BG | 18.11.2021 | ||
NO | 18.11.2021 | ||
GR | 19.11.2021 | ||
IS | 18.12.2021 | ||
PT | 20.12.2021 | ||
Former [2023/33] | HU | 25.10.2018 | |
AL | 18.08.2021 | ||
CY | 18.08.2021 | ||
CZ | 18.08.2021 | ||
DK | 18.08.2021 | ||
EE | 18.08.2021 | ||
ES | 18.08.2021 | ||
FI | 18.08.2021 | ||
HR | 18.08.2021 | ||
IT | 18.08.2021 | ||
LT | 18.08.2021 | ||
LV | 18.08.2021 | ||
MC | 18.08.2021 | ||
NL | 18.08.2021 | ||
RO | 18.08.2021 | ||
RS | 18.08.2021 | ||
SI | 18.08.2021 | ||
SK | 18.08.2021 | ||
SM | 18.08.2021 | ||
IE | 25.10.2021 | ||
LU | 25.10.2021 | ||
BE | 31.10.2021 | ||
BG | 18.11.2021 | ||
NO | 18.11.2021 | ||
GR | 19.11.2021 | ||
IS | 18.12.2021 | ||
PT | 20.12.2021 | ||
Former [2023/30] | AL | 18.08.2021 | |
CY | 18.08.2021 | ||
CZ | 18.08.2021 | ||
DK | 18.08.2021 | ||
EE | 18.08.2021 | ||
ES | 18.08.2021 | ||
FI | 18.08.2021 | ||
HR | 18.08.2021 | ||
IT | 18.08.2021 | ||
LT | 18.08.2021 | ||
LV | 18.08.2021 | ||
MC | 18.08.2021 | ||
NL | 18.08.2021 | ||
RO | 18.08.2021 | ||
RS | 18.08.2021 | ||
SI | 18.08.2021 | ||
SK | 18.08.2021 | ||
SM | 18.08.2021 | ||
IE | 25.10.2021 | ||
LU | 25.10.2021 | ||
BE | 31.10.2021 | ||
BG | 18.11.2021 | ||
NO | 18.11.2021 | ||
GR | 19.11.2021 | ||
IS | 18.12.2021 | ||
PT | 20.12.2021 | ||
Former [2022/48] | AL | 18.08.2021 | |
CZ | 18.08.2021 | ||
DK | 18.08.2021 | ||
EE | 18.08.2021 | ||
ES | 18.08.2021 | ||
FI | 18.08.2021 | ||
HR | 18.08.2021 | ||
IT | 18.08.2021 | ||
LT | 18.08.2021 | ||
LV | 18.08.2021 | ||
MC | 18.08.2021 | ||
NL | 18.08.2021 | ||
RO | 18.08.2021 | ||
RS | 18.08.2021 | ||
SI | 18.08.2021 | ||
SK | 18.08.2021 | ||
SM | 18.08.2021 | ||
IE | 25.10.2021 | ||
LU | 25.10.2021 | ||
BE | 31.10.2021 | ||
BG | 18.11.2021 | ||
NO | 18.11.2021 | ||
GR | 19.11.2021 | ||
IS | 18.12.2021 | ||
PT | 20.12.2021 | ||
Former [2022/36] | AL | 18.08.2021 | |
CZ | 18.08.2021 | ||
DK | 18.08.2021 | ||
EE | 18.08.2021 | ||
ES | 18.08.2021 | ||
FI | 18.08.2021 | ||
HR | 18.08.2021 | ||
IT | 18.08.2021 | ||
LT | 18.08.2021 | ||
LV | 18.08.2021 | ||
MC | 18.08.2021 | ||
NL | 18.08.2021 | ||
RO | 18.08.2021 | ||
RS | 18.08.2021 | ||
SI | 18.08.2021 | ||
SK | 18.08.2021 | ||
SM | 18.08.2021 | ||
LU | 25.10.2021 | ||
BE | 31.10.2021 | ||
BG | 18.11.2021 | ||
NO | 18.11.2021 | ||
GR | 19.11.2021 | ||
IS | 18.12.2021 | ||
PT | 20.12.2021 | ||
Former [2022/35] | AL | 18.08.2021 | |
CZ | 18.08.2021 | ||
DK | 18.08.2021 | ||
EE | 18.08.2021 | ||
ES | 18.08.2021 | ||
FI | 18.08.2021 | ||
HR | 18.08.2021 | ||
LT | 18.08.2021 | ||
LV | 18.08.2021 | ||
MC | 18.08.2021 | ||
NL | 18.08.2021 | ||
RO | 18.08.2021 | ||
RS | 18.08.2021 | ||
SK | 18.08.2021 | ||
SM | 18.08.2021 | ||
LU | 25.10.2021 | ||
BE | 31.10.2021 | ||
BG | 18.11.2021 | ||
NO | 18.11.2021 | ||
GR | 19.11.2021 | ||
IS | 18.12.2021 | ||
PT | 20.12.2021 | ||
Former [2022/33] | AL | 18.08.2021 | |
CZ | 18.08.2021 | ||
DK | 18.08.2021 | ||
EE | 18.08.2021 | ||
ES | 18.08.2021 | ||
FI | 18.08.2021 | ||
HR | 18.08.2021 | ||
LT | 18.08.2021 | ||
LV | 18.08.2021 | ||
MC | 18.08.2021 | ||
NL | 18.08.2021 | ||
RO | 18.08.2021 | ||
RS | 18.08.2021 | ||
SK | 18.08.2021 | ||
SM | 18.08.2021 | ||
BE | 31.10.2021 | ||
BG | 18.11.2021 | ||
NO | 18.11.2021 | ||
GR | 19.11.2021 | ||
IS | 18.12.2021 | ||
PT | 20.12.2021 | ||
Former [2022/29] | AL | 18.08.2021 | |
CZ | 18.08.2021 | ||
DK | 18.08.2021 | ||
EE | 18.08.2021 | ||
ES | 18.08.2021 | ||
FI | 18.08.2021 | ||
HR | 18.08.2021 | ||
LT | 18.08.2021 | ||
LV | 18.08.2021 | ||
NL | 18.08.2021 | ||
RO | 18.08.2021 | ||
RS | 18.08.2021 | ||
SK | 18.08.2021 | ||
SM | 18.08.2021 | ||
BG | 18.11.2021 | ||
NO | 18.11.2021 | ||
GR | 19.11.2021 | ||
IS | 18.12.2021 | ||
PT | 20.12.2021 | ||
Former [2022/25] | CZ | 18.08.2021 | |
DK | 18.08.2021 | ||
EE | 18.08.2021 | ||
ES | 18.08.2021 | ||
FI | 18.08.2021 | ||
HR | 18.08.2021 | ||
LT | 18.08.2021 | ||
LV | 18.08.2021 | ||
NL | 18.08.2021 | ||
RO | 18.08.2021 | ||
RS | 18.08.2021 | ||
SK | 18.08.2021 | ||
SM | 18.08.2021 | ||
BG | 18.11.2021 | ||
NO | 18.11.2021 | ||
GR | 19.11.2021 | ||
IS | 18.12.2021 | ||
PT | 20.12.2021 | ||
Former [2022/24] | CZ | 18.08.2021 | |
DK | 18.08.2021 | ||
EE | 18.08.2021 | ||
ES | 18.08.2021 | ||
FI | 18.08.2021 | ||
HR | 18.08.2021 | ||
LT | 18.08.2021 | ||
LV | 18.08.2021 | ||
NL | 18.08.2021 | ||
RO | 18.08.2021 | ||
RS | 18.08.2021 | ||
SK | 18.08.2021 | ||
BG | 18.11.2021 | ||
NO | 18.11.2021 | ||
GR | 19.11.2021 | ||
IS | 18.12.2021 | ||
PT | 20.12.2021 | ||
Former [2022/21] | DK | 18.08.2021 | |
ES | 18.08.2021 | ||
FI | 18.08.2021 | ||
HR | 18.08.2021 | ||
LT | 18.08.2021 | ||
LV | 18.08.2021 | ||
NL | 18.08.2021 | ||
RS | 18.08.2021 | ||
BG | 18.11.2021 | ||
NO | 18.11.2021 | ||
GR | 19.11.2021 | ||
IS | 18.12.2021 | ||
PT | 20.12.2021 | ||
Former [2022/16] | ES | 18.08.2021 | |
FI | 18.08.2021 | ||
HR | 18.08.2021 | ||
LT | 18.08.2021 | ||
LV | 18.08.2021 | ||
NL | 18.08.2021 | ||
RS | 18.08.2021 | ||
BG | 18.11.2021 | ||
NO | 18.11.2021 | ||
GR | 19.11.2021 | ||
IS | 18.12.2021 | ||
PT | 20.12.2021 | ||
Former [2022/10] | ES | 18.08.2021 | |
FI | 18.08.2021 | ||
HR | 18.08.2021 | ||
LT | 18.08.2021 | ||
LV | 18.08.2021 | ||
RS | 18.08.2021 | ||
BG | 18.11.2021 | ||
NO | 18.11.2021 | ||
GR | 19.11.2021 | ||
IS | 18.12.2021 | ||
PT | 20.12.2021 | ||
Former [2022/09] | ES | 18.08.2021 | |
FI | 18.08.2021 | ||
LT | 18.08.2021 | ||
RS | 18.08.2021 | ||
BG | 18.11.2021 | ||
NO | 18.11.2021 | ||
PT | 20.12.2021 | ||
Former [2022/08] | ES | 18.08.2021 | |
FI | 18.08.2021 | ||
LT | 18.08.2021 | ||
BG | 18.11.2021 | ||
NO | 18.11.2021 | ||
Former [2022/07] | LT | 18.08.2021 | |
NO | 18.11.2021 | Documents cited: | Search | [AD]EP1944420 (KESSEL GMBH [DE]) [AD] 1-5 * paragraph [0023] - paragraph [0036]; figures 1-3 *; | [A]EP2447429 (KESSEL AG [DE]) [A] 1-5 * paragraph [0023] - paragraph [0038]; figure 2 *; | [A]US6059208 (STRUTHERS KEVIN D [US]) [A] 1-5 * column 3, line 18 - column 7, line 11; figures 1,2 *; | [A]US2006228222 (POHLER DONALD M [US]) [A] 1-5 * paragraph [0020] - paragraph [0056]; figure 3 *; | [A]DE2853312 (BLUM ALBERT) [A] 1-5 * figure 1 *; | [A]EP3103932 (ACO SEVERIN AHLMANN GMBH & CO KG [DE]) [A] 1-5 * the whole document * | by applicant | EP1944420 | EP2447429 | US6059208 | US2006228222 | DE2853312 | EP3103932 |