blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3674159

EP3674159 - ARITHMETIC MODEL GENERATION SYSTEM AND ARITHMETIC MODEL GENERATION METHOD [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  12.07.2024
Database last updated on 03.10.2024
FormerThe patent has been granted
Status updated on  04.08.2023
FormerGrant of patent is intended
Status updated on  19.04.2023
FormerExamination is in progress
Status updated on  16.09.2022
FormerRequest for examination was made
Status updated on  29.05.2020
Most recent event   Tooltip30.08.2024Lapse of the patent in a contracting state
New state(s): LU, MC
published on 02.10.2024  [2024/40]
Applicant(s)For all designated states
Toyo Tire Corporation
2-2-13, Fujinoki
Itami-shi, Hyogo 664-0847 / JP
[2020/27]
Inventor(s)01 / ISHIGAMI, Naohiro
c/o Toyo Tire Corporation
2-2-13 Fujinoki
Itami-shi, Hyogo 664-0847 / JP
 [2020/27]
Representative(s)Müller-Boré & Partner Patentanwälte PartG mbB
Friedenheimer Brücke 21
80639 München / DE
[2020/27]
Application number, filing date19217320.118.12.2019
[2020/27]
Priority number, dateJP2018024746028.12.2018         Original published format: JP 2018247460
[2020/27]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3674159
Date:01.07.2020
Language:EN
[2020/27]
Type: B1 Patent specification 
No.:EP3674159
Date:06.09.2023
Language:EN
[2023/36]
Search report(s)(Supplementary) European search report - dispatched on:EP13.05.2020
ClassificationIPC:B60W40/12, B60T8/172, B60C19/00
[2020/27]
CPC:
B60W40/12 (EP); B60W40/068 (CN,US); B60W40/13 (US);
B60W50/00 (US); B60C2019/004 (EP); B60T2210/10 (EP);
B60T2240/03 (EP); B60T2270/86 (EP); B60W2040/1307 (US);
B60W2050/0037 (US); B60W2520/26 (US); B60W2520/30 (US);
B60W2530/20 (CN,US); B60W2552/40 (US); Y02T90/00 (EP) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2021/01]
Former [2020/27]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:SYSTEM UND VERFAHREN ZUR ERZEUGUNG EINES ARITHMETISCHEN MODELLS[2020/27]
English:ARITHMETIC MODEL GENERATION SYSTEM AND ARITHMETIC MODEL GENERATION METHOD[2020/27]
French:SYSTÈME ET PROCÉDÉ DE GÉNÉRATION DE MODÈLES ARITHMÉTIQUES[2020/27]
Examination procedure19.12.2019Examination requested  [2020/27]
19.11.2020Amendment by applicant (claims and/or description)
20.09.2022Despatch of a communication from the examining division (Time limit: M04)
07.12.2022Reply to a communication from the examining division
20.04.2023Communication of intention to grant the patent
26.07.2023Receipt of the translation of the claim(s)
27.07.2023Fee for grant paid
27.07.2023Fee for publishing/printing paid
Opposition(s)07.06.2024No opposition filed within time limit [2024/33]
Fees paidRenewal fee
15.12.2021Renewal fee patent year 03
13.12.2022Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipAT06.09.2023
CZ06.09.2023
DK06.09.2023
EE06.09.2023
ES06.09.2023
FI06.09.2023
HR06.09.2023
IT06.09.2023
LT06.09.2023
LV06.09.2023
MC06.09.2023
NL06.09.2023
PL06.09.2023
RO06.09.2023
RS06.09.2023
SE06.09.2023
SI06.09.2023
SK06.09.2023
SM06.09.2023
NO06.12.2023
GR07.12.2023
LU18.12.2023
IS06.01.2024
PT08.01.2024
[2024/40]
Former [2024/36]AT06.09.2023
CZ06.09.2023
DK06.09.2023
EE06.09.2023
ES06.09.2023
FI06.09.2023
HR06.09.2023
IT06.09.2023
LT06.09.2023
LV06.09.2023
NL06.09.2023
PL06.09.2023
RO06.09.2023
RS06.09.2023
SE06.09.2023
SI06.09.2023
SK06.09.2023
SM06.09.2023
NO06.12.2023
GR07.12.2023
IS06.01.2024
PT08.01.2024
Former [2024/33]AT06.09.2023
CZ06.09.2023
DK06.09.2023
EE06.09.2023
ES06.09.2023
FI06.09.2023
HR06.09.2023
IT06.09.2023
LT06.09.2023
LV06.09.2023
NL06.09.2023
PL06.09.2023
RO06.09.2023
RS06.09.2023
SE06.09.2023
SK06.09.2023
SM06.09.2023
NO06.12.2023
GR07.12.2023
IS06.01.2024
PT08.01.2024
Former [2024/26]AT06.09.2023
CZ06.09.2023
EE06.09.2023
ES06.09.2023
FI06.09.2023
HR06.09.2023
IT06.09.2023
LT06.09.2023
LV06.09.2023
NL06.09.2023
PL06.09.2023
RO06.09.2023
RS06.09.2023
SE06.09.2023
SK06.09.2023
SM06.09.2023
NO06.12.2023
GR07.12.2023
IS06.01.2024
PT08.01.2024
Former [2024/25]AT06.09.2023
CZ06.09.2023
EE06.09.2023
ES06.09.2023
FI06.09.2023
HR06.09.2023
LT06.09.2023
LV06.09.2023
NL06.09.2023
PL06.09.2023
RO06.09.2023
RS06.09.2023
SE06.09.2023
SK06.09.2023
SM06.09.2023
NO06.12.2023
GR07.12.2023
IS06.01.2024
PT08.01.2024
Former [2024/23]AT06.09.2023
CZ06.09.2023
EE06.09.2023
ES06.09.2023
FI06.09.2023
HR06.09.2023
LT06.09.2023
LV06.09.2023
NL06.09.2023
RO06.09.2023
RS06.09.2023
SE06.09.2023
SK06.09.2023
SM06.09.2023
NO06.12.2023
GR07.12.2023
IS06.01.2024
PT08.01.2024
Former [2024/20]FI06.09.2023
HR06.09.2023
LT06.09.2023
LV06.09.2023
NL06.09.2023
RS06.09.2023
SE06.09.2023
SM06.09.2023
NO06.12.2023
GR07.12.2023
IS06.01.2024
Former [2024/14]FI06.09.2023
HR06.09.2023
LT06.09.2023
LV06.09.2023
NL06.09.2023
RS06.09.2023
SE06.09.2023
NO06.12.2023
GR07.12.2023
Former [2024/10]FI06.09.2023
HR06.09.2023
LT06.09.2023
LV06.09.2023
RS06.09.2023
SE06.09.2023
NO06.12.2023
GR07.12.2023
Former [2024/09]FI06.09.2023
LT06.09.2023
SE06.09.2023
NO06.12.2023
GR07.12.2023
Former [2024/08]LT06.09.2023
NO06.12.2023
GR07.12.2023
Documents cited:Search[Y]JP2005059800  (BRIDGESTONE CORP) [Y] 4 * paragraph [0017] - paragraph [0018]; figures 1,2 *;
 [Y]EP2774784  (GOODYEAR TIRE & RUBBER [US]) [Y] 5* road roughness and tire load;; figures 25,26; claim 7 *;
 [XY]EP2777956  (GOODYEAR TIRE & RUBBER [US]) [X] 1-3,6,7 * paragraph [0021] - paragraph [0030]; figures 1-5 * [Y] 4,5
by applicantJP2014035279
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.