| EP3795721 - NANOWIRE STRUCTURE TO FORM AN ARRAY OF ISOLATED CAPACITORS, AND ASSOCIATED MANUFACTURING METHODS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 24.05.2024 Database last updated on 26.03.2026 | |
| Former | The patent has been granted Status updated on 16.06.2023 | ||
| Former | Grant of patent is intended Status updated on 01.03.2023 | ||
| Former | Request for examination was made Status updated on 17.09.2021 | ||
| Former | The application has been published Status updated on 19.02.2021 | Most recent event Tooltip | 26.12.2025 | Lapse of the patent in a contracting state New state(s): TR | published on 28.01.2026 [2026/05] | Applicant(s) | For all designated states Murata Manufacturing Co., Ltd. 10-1, Higashikotari 1-chome Nagaokakyo-shi, Kyoto 617-8555 / JP | For all designated states Commissariat à l'énergie atomique et aux énergies alternatives Bâtiment "Le Ponant D" 25 Rue Leblanc 75015 Paris / FR | [N/P] |
| Former [2021/12] | For all designated states Murata Manufacturing Co., Ltd. 10-1, Higashikotari 1-chome Nagaokakyo-shi, Kyoto 617-8555 / JP | ||
| For all designated states Commissariat à l'énergie atomique et aux énergies alternatives Bâtiment "Le Ponant D" 25 rue Leblanc 75015 Paris / FR | Inventor(s) | 01 /
EL SABAHY, Julien 10 Cours de la Libération et du Général de Gaulle 38100 GRENOBLE / FR | 02 /
VOIRON, Frédéric 386 route du Fayet 38530 BARRAUX / FR | 03 /
PARAT, Guy COMMISSARIAT A L'ENERGIE ATOMIQUE ET AUX ENERGIES ALTERNATIVES c/o CEA GRENOBLE 17, rue des Martyrs 38054 GRENOBLE cedex 09 / FR | [2021/12] | Representative(s) | Cabinet Beau de Loménie 103, rue de Grenelle 75340 Paris Cedex 07 / FR | [N/P] |
| Former [2021/12] | Cabinet Beau de Loménie 158, rue de l'Université 75340 Paris Cedex 07 / FR | Application number, filing date | 19306136.3 | 19.09.2019 | [2021/12] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3795721 | Date: | 24.03.2021 | Language: | EN | [2021/12] | Type: | B1 Patent specification | No.: | EP3795721 | Date: | 19.07.2023 | Language: | EN | [2023/29] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 14.02.2020 | Classification | IPC: | C25D1/00, C25D1/04, C25D11/02, C25D11/04, H01G4/012, H01G4/232, H01G4/33, H01G4/38, H01G4/30 | [2023/09] | CPC: |
C25D11/045 (EP,CN);
H01G4/33 (EP,CN);
H10D62/122 (US);
C25D1/006 (EP,CN);
C25D1/04 (EP,CN);
C25D11/022 (EP,CN);
H01G4/012 (EP);
H01G4/306 (EP);
H01G4/38 (EP,CN);
H10D1/716 (EP,CN);
H10P14/3462 (US);
H10W20/496 (US);
Y02E60/13 (EP)
(-)
|
| Former IPC [2021/12] | C25D1/00, C25D1/04, C25D11/02, C25D11/04, H01G4/012, H01G4/232, H01G4/30, H01G4/33, H01G4/38, H01L49/02 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2021/42] |
| Former [2021/12] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | NANODRAHTSTRUKTUR ZUR AUSBILDUNG EINER ANORDNUNG ISOLIERTER KONDENSATOREN UND ZUGEHÖRIGE HERSTELLUNGSVERFAHREN | [2021/12] | English: | NANOWIRE STRUCTURE TO FORM AN ARRAY OF ISOLATED CAPACITORS, AND ASSOCIATED MANUFACTURING METHODS | [2021/12] | French: | STRUCTURE DE NANOFILS POUR FORMER UN RÉSEAU DE CONDENSATEURS ISOLÉS ET PROCÉDÉS DE FABRICATION ASSOCIÉS | [2021/12] | Examination procedure | 14.09.2021 | Amendment by applicant (claims and/or description) | 14.09.2021 | Examination requested [2021/42] | 14.09.2021 | Date on which the examining division has become responsible | 02.03.2023 | Communication of intention to grant the patent | 08.06.2023 | Fee for grant paid | 08.06.2023 | Fee for publishing/printing paid | 08.06.2023 | Receipt of the translation of the claim(s) | Opposition(s) | 22.04.2024 | No opposition filed within time limit [2024/26] | Fees paid | Renewal fee | 23.09.2021 | Renewal fee patent year 03 | 20.09.2022 | Renewal fee patent year 04 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | CY | 19.09.2019 | HU | 19.09.2019 | AT | 19.07.2023 | BG | 19.07.2023 | CZ | 19.07.2023 | DK | 19.07.2023 | EE | 19.07.2023 | ES | 19.07.2023 | FI | 19.07.2023 | HR | 19.07.2023 | IT | 19.07.2023 | LT | 19.07.2023 | LV | 19.07.2023 | MC | 19.07.2023 | NL | 19.07.2023 | PL | 19.07.2023 | RO | 19.07.2023 | RS | 19.07.2023 | SE | 19.07.2023 | SI | 19.07.2023 | SK | 19.07.2023 | SM | 19.07.2023 | TR | 19.07.2023 | IE | 19.09.2023 | LU | 19.09.2023 | BE | 30.09.2023 | CH | 30.09.2023 | GB | 19.10.2023 | NO | 19.10.2023 | GR | 20.10.2023 | IS | 19.11.2023 | PT | 20.11.2023 | [2026/05] |
| Former [2025/39] | CY | 19.09.2019 | |
| HU | 19.09.2019 | ||
| AT | 19.07.2023 | ||
| BG | 19.07.2023 | ||
| CZ | 19.07.2023 | ||
| DK | 19.07.2023 | ||
| EE | 19.07.2023 | ||
| ES | 19.07.2023 | ||
| FI | 19.07.2023 | ||
| HR | 19.07.2023 | ||
| IT | 19.07.2023 | ||
| LT | 19.07.2023 | ||
| LV | 19.07.2023 | ||
| MC | 19.07.2023 | ||
| NL | 19.07.2023 | ||
| PL | 19.07.2023 | ||
| RO | 19.07.2023 | ||
| RS | 19.07.2023 | ||
| SE | 19.07.2023 | ||
| SI | 19.07.2023 | ||
| SK | 19.07.2023 | ||
| SM | 19.07.2023 | ||
| IE | 19.09.2023 | ||
| LU | 19.09.2023 | ||
| BE | 30.09.2023 | ||
| CH | 30.09.2023 | ||
| GB | 19.10.2023 | ||
| NO | 19.10.2023 | ||
| GR | 20.10.2023 | ||
| IS | 19.11.2023 | ||
| PT | 20.11.2023 | ||
| Former [2025/36] | CY | 19.09.2019 | |
| AT | 19.07.2023 | ||
| BG | 19.07.2023 | ||
| CZ | 19.07.2023 | ||
| DK | 19.07.2023 | ||
| EE | 19.07.2023 | ||
| ES | 19.07.2023 | ||
| FI | 19.07.2023 | ||
| HR | 19.07.2023 | ||
| IT | 19.07.2023 | ||
| LT | 19.07.2023 | ||
| LV | 19.07.2023 | ||
| MC | 19.07.2023 | ||
| NL | 19.07.2023 | ||
| PL | 19.07.2023 | ||
| RO | 19.07.2023 | ||
| RS | 19.07.2023 | ||
| SE | 19.07.2023 | ||
| SI | 19.07.2023 | ||
| SK | 19.07.2023 | ||
| SM | 19.07.2023 | ||
| IE | 19.09.2023 | ||
| LU | 19.09.2023 | ||
| BE | 30.09.2023 | ||
| CH | 30.09.2023 | ||
| GB | 19.10.2023 | ||
| NO | 19.10.2023 | ||
| GR | 20.10.2023 | ||
| IS | 19.11.2023 | ||
| PT | 20.11.2023 | ||
| Former [2024/51] | AT | 19.07.2023 | |
| BG | 19.07.2023 | ||
| CZ | 19.07.2023 | ||
| DK | 19.07.2023 | ||
| EE | 19.07.2023 | ||
| ES | 19.07.2023 | ||
| FI | 19.07.2023 | ||
| HR | 19.07.2023 | ||
| IT | 19.07.2023 | ||
| LT | 19.07.2023 | ||
| LV | 19.07.2023 | ||
| MC | 19.07.2023 | ||
| NL | 19.07.2023 | ||
| PL | 19.07.2023 | ||
| RO | 19.07.2023 | ||
| RS | 19.07.2023 | ||
| SE | 19.07.2023 | ||
| SI | 19.07.2023 | ||
| SK | 19.07.2023 | ||
| SM | 19.07.2023 | ||
| IE | 19.09.2023 | ||
| LU | 19.09.2023 | ||
| BE | 30.09.2023 | ||
| CH | 30.09.2023 | ||
| GB | 19.10.2023 | ||
| NO | 19.10.2023 | ||
| GR | 20.10.2023 | ||
| IS | 19.11.2023 | ||
| PT | 20.11.2023 | ||
| Former [2024/36] | AT | 19.07.2023 | |
| CZ | 19.07.2023 | ||
| DK | 19.07.2023 | ||
| EE | 19.07.2023 | ||
| ES | 19.07.2023 | ||
| FI | 19.07.2023 | ||
| HR | 19.07.2023 | ||
| IT | 19.07.2023 | ||
| LT | 19.07.2023 | ||
| LV | 19.07.2023 | ||
| MC | 19.07.2023 | ||
| NL | 19.07.2023 | ||
| PL | 19.07.2023 | ||
| RO | 19.07.2023 | ||
| RS | 19.07.2023 | ||
| SE | 19.07.2023 | ||
| SI | 19.07.2023 | ||
| SK | 19.07.2023 | ||
| SM | 19.07.2023 | ||
| IE | 19.09.2023 | ||
| LU | 19.09.2023 | ||
| BE | 30.09.2023 | ||
| CH | 30.09.2023 | ||
| GB | 19.10.2023 | ||
| NO | 19.10.2023 | ||
| GR | 20.10.2023 | ||
| IS | 19.11.2023 | ||
| PT | 20.11.2023 | ||
| Former [2024/34] | AT | 19.07.2023 | |
| CZ | 19.07.2023 | ||
| DK | 19.07.2023 | ||
| EE | 19.07.2023 | ||
| ES | 19.07.2023 | ||
| FI | 19.07.2023 | ||
| HR | 19.07.2023 | ||
| IT | 19.07.2023 | ||
| LT | 19.07.2023 | ||
| LV | 19.07.2023 | ||
| MC | 19.07.2023 | ||
| NL | 19.07.2023 | ||
| PL | 19.07.2023 | ||
| RO | 19.07.2023 | ||
| RS | 19.07.2023 | ||
| SE | 19.07.2023 | ||
| SK | 19.07.2023 | ||
| SM | 19.07.2023 | ||
| IE | 19.09.2023 | ||
| LU | 19.09.2023 | ||
| CH | 30.09.2023 | ||
| GB | 19.10.2023 | ||
| NO | 19.10.2023 | ||
| GR | 20.10.2023 | ||
| IS | 19.11.2023 | ||
| PT | 20.11.2023 | ||
| Former [2024/33] | AT | 19.07.2023 | |
| CZ | 19.07.2023 | ||
| DK | 19.07.2023 | ||
| EE | 19.07.2023 | ||
| ES | 19.07.2023 | ||
| FI | 19.07.2023 | ||
| HR | 19.07.2023 | ||
| IT | 19.07.2023 | ||
| LT | 19.07.2023 | ||
| LV | 19.07.2023 | ||
| MC | 19.07.2023 | ||
| NL | 19.07.2023 | ||
| PL | 19.07.2023 | ||
| RO | 19.07.2023 | ||
| RS | 19.07.2023 | ||
| SE | 19.07.2023 | ||
| SK | 19.07.2023 | ||
| SM | 19.07.2023 | ||
| IE | 19.09.2023 | ||
| LU | 19.09.2023 | ||
| GB | 19.10.2023 | ||
| NO | 19.10.2023 | ||
| GR | 20.10.2023 | ||
| IS | 19.11.2023 | ||
| PT | 20.11.2023 | ||
| Former [2024/28] | AT | 19.07.2023 | |
| CZ | 19.07.2023 | ||
| DK | 19.07.2023 | ||
| EE | 19.07.2023 | ||
| ES | 19.07.2023 | ||
| FI | 19.07.2023 | ||
| HR | 19.07.2023 | ||
| IT | 19.07.2023 | ||
| LT | 19.07.2023 | ||
| LV | 19.07.2023 | ||
| MC | 19.07.2023 | ||
| NL | 19.07.2023 | ||
| PL | 19.07.2023 | ||
| RO | 19.07.2023 | ||
| RS | 19.07.2023 | ||
| SE | 19.07.2023 | ||
| SK | 19.07.2023 | ||
| SM | 19.07.2023 | ||
| LU | 19.09.2023 | ||
| NO | 19.10.2023 | ||
| GR | 20.10.2023 | ||
| IS | 19.11.2023 | ||
| PT | 20.11.2023 | ||
| Former [2024/26] | AT | 19.07.2023 | |
| CZ | 19.07.2023 | ||
| DK | 19.07.2023 | ||
| EE | 19.07.2023 | ||
| ES | 19.07.2023 | ||
| FI | 19.07.2023 | ||
| HR | 19.07.2023 | ||
| IT | 19.07.2023 | ||
| LT | 19.07.2023 | ||
| LV | 19.07.2023 | ||
| NL | 19.07.2023 | ||
| PL | 19.07.2023 | ||
| RO | 19.07.2023 | ||
| RS | 19.07.2023 | ||
| SE | 19.07.2023 | ||
| SK | 19.07.2023 | ||
| SM | 19.07.2023 | ||
| LU | 19.09.2023 | ||
| NO | 19.10.2023 | ||
| GR | 20.10.2023 | ||
| IS | 19.11.2023 | ||
| PT | 20.11.2023 | ||
| Former [2024/25] | AT | 19.07.2023 | |
| CZ | 19.07.2023 | ||
| DK | 19.07.2023 | ||
| EE | 19.07.2023 | ||
| ES | 19.07.2023 | ||
| FI | 19.07.2023 | ||
| HR | 19.07.2023 | ||
| LT | 19.07.2023 | ||
| LV | 19.07.2023 | ||
| NL | 19.07.2023 | ||
| PL | 19.07.2023 | ||
| RO | 19.07.2023 | ||
| RS | 19.07.2023 | ||
| SE | 19.07.2023 | ||
| SK | 19.07.2023 | ||
| SM | 19.07.2023 | ||
| LU | 19.09.2023 | ||
| NO | 19.10.2023 | ||
| GR | 20.10.2023 | ||
| IS | 19.11.2023 | ||
| PT | 20.11.2023 | ||
| Former [2024/23] | AT | 19.07.2023 | |
| CZ | 19.07.2023 | ||
| DK | 19.07.2023 | ||
| EE | 19.07.2023 | ||
| ES | 19.07.2023 | ||
| FI | 19.07.2023 | ||
| HR | 19.07.2023 | ||
| LT | 19.07.2023 | ||
| LV | 19.07.2023 | ||
| NL | 19.07.2023 | ||
| PL | 19.07.2023 | ||
| RO | 19.07.2023 | ||
| RS | 19.07.2023 | ||
| SE | 19.07.2023 | ||
| SK | 19.07.2023 | ||
| SM | 19.07.2023 | ||
| NO | 19.10.2023 | ||
| GR | 20.10.2023 | ||
| IS | 19.11.2023 | ||
| PT | 20.11.2023 | ||
| Former [2024/22] | AT | 19.07.2023 | |
| CZ | 19.07.2023 | ||
| DK | 19.07.2023 | ||
| FI | 19.07.2023 | ||
| HR | 19.07.2023 | ||
| LT | 19.07.2023 | ||
| LV | 19.07.2023 | ||
| NL | 19.07.2023 | ||
| PL | 19.07.2023 | ||
| RO | 19.07.2023 | ||
| RS | 19.07.2023 | ||
| SE | 19.07.2023 | ||
| SM | 19.07.2023 | ||
| NO | 19.10.2023 | ||
| GR | 20.10.2023 | ||
| IS | 19.11.2023 | ||
| PT | 20.11.2023 | ||
| Former [2024/20] | AT | 19.07.2023 | |
| FI | 19.07.2023 | ||
| HR | 19.07.2023 | ||
| LT | 19.07.2023 | ||
| LV | 19.07.2023 | ||
| NL | 19.07.2023 | ||
| PL | 19.07.2023 | ||
| RS | 19.07.2023 | ||
| SE | 19.07.2023 | ||
| SM | 19.07.2023 | ||
| NO | 19.10.2023 | ||
| GR | 20.10.2023 | ||
| IS | 19.11.2023 | ||
| PT | 20.11.2023 | ||
| Former [2024/10] | AT | 19.07.2023 | |
| FI | 19.07.2023 | ||
| HR | 19.07.2023 | ||
| LT | 19.07.2023 | ||
| LV | 19.07.2023 | ||
| NL | 19.07.2023 | ||
| PL | 19.07.2023 | ||
| RS | 19.07.2023 | ||
| SE | 19.07.2023 | ||
| NO | 19.10.2023 | ||
| GR | 20.10.2023 | ||
| IS | 19.11.2023 | ||
| PT | 20.11.2023 | ||
| Former [2024/09] | AT | 19.07.2023 | |
| FI | 19.07.2023 | ||
| LT | 19.07.2023 | ||
| NL | 19.07.2023 | ||
| SE | 19.07.2023 | ||
| NO | 19.10.2023 | ||
| GR | 20.10.2023 | ||
| IS | 19.11.2023 | ||
| Former [2024/08] | LT | 19.07.2023 | |
| NL | 19.07.2023 | ||
| NO | 19.10.2023 | ||
| GR | 20.10.2023 | ||
| Former [2024/05] | NL | 19.07.2023 | Documents cited: | Search | [XA] US2011053794 (ZHANG GUIGEN et al.) | [XA] US2008210662 (RABIN ODED et al.) | [AD] WO2015063420 (IPDIA et al.) | [AD] PARAG BANERJEE ET AL: "Nanotubular metal-insulator-metal capacitor arraysfor energy storage", NATURE NANOTECHNOLOGY, NATURE PUB. GROUP, INC, LONDON, vol. 4, no. 5, 1 January 2009 (2009-01-01), pages 292 - 296, XP009144550, ISSN: 1748-3387 | by applicant | WO2015063420 | EP18306565 | EP19305021 | P. BANERJEE: "Nanotubular metal-insulator-metal capacitor arrays for energy storage", NATURE NANOTECHNOLOGY, vol. 4, no. 5, May 2009 (2009-05-01), pages 292 - 26, XP009144550 |