EP3735747 - MATCHED-FILTER RADIO RECEIVER [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 20.06.2024 Database last updated on 02.11.2024 | |
Former | The patent has been granted Status updated on 14.07.2023 | ||
Former | Grant of patent is intended Status updated on 27.02.2023 | ||
Former | Examination is in progress Status updated on 20.05.2022 | ||
Former | Request for examination was made Status updated on 09.10.2020 | ||
Former | The international publication has been made Status updated on 12.07.2019 | ||
Former | unknown Status updated on 15.01.2019 | Most recent event Tooltip | 25.10.2024 | Lapse of the patent in a contracting state New state(s): CH | published on 27.11.2024 [2024/48] | Applicant(s) | For all designated states Nordic Semiconductor ASA Otto Nielsens veg 12 7052 Trondheim / NO | [2020/46] | Inventor(s) | 01 /
LI, Wei Nordic Semiconductor ASA Otto Nielsens veg 12 7052 Trondheim / NO | 02 /
RYAN, Daniel Nordic Semiconductor ASA Otto Nielsens veg 12 7052 Trondheim / NO | [2020/46] | Representative(s) | Dehns 10 Old Bailey London EC4M 7NG / GB | [N/P] |
Former [2020/46] | Dehns St. Bride's House 10 Salisbury Square London EC4Y 8JD / GB | Application number, filing date | 19700029.2 | 03.01.2019 | [2020/46] | WO2019EP50119 | Priority number, date | GB20180000101 | 04.01.2018 Original published format: GB 201800101 | [2020/46] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | WO2019134947 | Date: | 11.07.2019 | Language: | EN | [2019/28] | Type: | A2 Application without search report | No.: | EP3735747 | Date: | 11.11.2020 | Language: | EN | The application published by WIPO in one of the EPO official languages on 11.07.2019 takes the place of the publication of the European patent application. | [2020/46] | Type: | B1 Patent specification | No.: | EP3735747 | Date: | 16.08.2023 | Language: | EN | [2023/33] | Search report(s) | International search report - published on: | EP | 09.01.2020 | Classification | IPC: | H04B1/12, H04L27/148, H04L27/233, H04L27/00, H04L27/14, H04L27/22 | [2023/12] | CPC: |
H04B1/123 (EP,US);
H04L27/2334 (EP,US);
H04L27/0008 (EP,US);
H04L27/0014 (EP,US);
H04L27/14 (EP);
H04L27/148 (EP,US);
|
Former IPC [2020/46] | H04B1/12, H04L27/148, H04L27/233 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/46] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | RUNDFUNKEMPFÄNGER MIT ABGEGLICHENEM FILTER | [2020/46] | English: | MATCHED-FILTER RADIO RECEIVER | [2020/46] | French: | RÉCEPTEUR RADIO À FILTRAGE ADAPTÉ | [2020/46] | Entry into regional phase | 04.08.2020 | National basic fee paid | 04.08.2020 | Designation fee(s) paid | 04.08.2020 | Examination fee paid | Examination procedure | 04.08.2020 | Examination requested [2020/46] | 04.08.2020 | Date on which the examining division has become responsible | 23.02.2021 | Amendment by applicant (claims and/or description) | 19.05.2022 | Despatch of a communication from the examining division (Time limit: M04) | 22.09.2022 | Reply to a communication from the examining division | 28.02.2023 | Communication of intention to grant the patent | 10.07.2023 | Fee for grant paid | 10.07.2023 | Fee for publishing/printing paid | 10.07.2023 | Receipt of the translation of the claim(s) | Opposition(s) | 17.05.2024 | No opposition filed within time limit [2024/30] | Fees paid | Renewal fee | 20.01.2021 | Renewal fee patent year 03 | 20.01.2022 | Renewal fee patent year 04 | 19.01.2023 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 16.08.2023 | CZ | 16.08.2023 | DK | 16.08.2023 | EE | 16.08.2023 | ES | 16.08.2023 | FI | 16.08.2023 | HR | 16.08.2023 | IT | 16.08.2023 | LT | 16.08.2023 | LV | 16.08.2023 | MC | 16.08.2023 | NL | 16.08.2023 | PL | 16.08.2023 | RO | 16.08.2023 | RS | 16.08.2023 | SE | 16.08.2023 | SI | 16.08.2023 | SK | 16.08.2023 | SM | 16.08.2023 | NO | 16.11.2023 | GR | 17.11.2023 | IS | 16.12.2023 | PT | 18.12.2023 | LU | 03.01.2024 | BE | 31.01.2024 | CH | 31.01.2024 | [2024/48] |
Former [2024/47] | AT | 16.08.2023 | |
CZ | 16.08.2023 | ||
DK | 16.08.2023 | ||
EE | 16.08.2023 | ||
ES | 16.08.2023 | ||
FI | 16.08.2023 | ||
HR | 16.08.2023 | ||
IT | 16.08.2023 | ||
LT | 16.08.2023 | ||
LV | 16.08.2023 | ||
MC | 16.08.2023 | ||
NL | 16.08.2023 | ||
PL | 16.08.2023 | ||
RO | 16.08.2023 | ||
RS | 16.08.2023 | ||
SE | 16.08.2023 | ||
SI | 16.08.2023 | ||
SK | 16.08.2023 | ||
SM | 16.08.2023 | ||
NO | 16.11.2023 | ||
GR | 17.11.2023 | ||
IS | 16.12.2023 | ||
PT | 18.12.2023 | ||
LU | 03.01.2024 | ||
BE | 31.01.2024 | ||
Former [2024/43] | AT | 16.08.2023 | |
CZ | 16.08.2023 | ||
DK | 16.08.2023 | ||
EE | 16.08.2023 | ||
ES | 16.08.2023 | ||
FI | 16.08.2023 | ||
HR | 16.08.2023 | ||
IT | 16.08.2023 | ||
LT | 16.08.2023 | ||
LV | 16.08.2023 | ||
MC | 16.08.2023 | ||
NL | 16.08.2023 | ||
PL | 16.08.2023 | ||
RO | 16.08.2023 | ||
RS | 16.08.2023 | ||
SE | 16.08.2023 | ||
SI | 16.08.2023 | ||
SK | 16.08.2023 | ||
SM | 16.08.2023 | ||
NO | 16.11.2023 | ||
GR | 17.11.2023 | ||
IS | 16.12.2023 | ||
PT | 18.12.2023 | ||
LU | 03.01.2024 | ||
Former [2024/40] | AT | 16.08.2023 | |
CZ | 16.08.2023 | ||
DK | 16.08.2023 | ||
EE | 16.08.2023 | ||
ES | 16.08.2023 | ||
FI | 16.08.2023 | ||
HR | 16.08.2023 | ||
IT | 16.08.2023 | ||
LT | 16.08.2023 | ||
LV | 16.08.2023 | ||
MC | 16.08.2023 | ||
NL | 16.08.2023 | ||
PL | 16.08.2023 | ||
RO | 16.08.2023 | ||
RS | 16.08.2023 | ||
SE | 16.08.2023 | ||
SI | 16.08.2023 | ||
SK | 16.08.2023 | ||
SM | 16.08.2023 | ||
NO | 16.11.2023 | ||
GR | 17.11.2023 | ||
IS | 16.12.2023 | ||
PT | 18.12.2023 | ||
Former [2024/36] | AT | 16.08.2023 | |
CZ | 16.08.2023 | ||
DK | 16.08.2023 | ||
EE | 16.08.2023 | ||
ES | 16.08.2023 | ||
FI | 16.08.2023 | ||
HR | 16.08.2023 | ||
IT | 16.08.2023 | ||
LT | 16.08.2023 | ||
LV | 16.08.2023 | ||
NL | 16.08.2023 | ||
PL | 16.08.2023 | ||
RO | 16.08.2023 | ||
RS | 16.08.2023 | ||
SE | 16.08.2023 | ||
SI | 16.08.2023 | ||
SK | 16.08.2023 | ||
SM | 16.08.2023 | ||
NO | 16.11.2023 | ||
GR | 17.11.2023 | ||
IS | 16.12.2023 | ||
PT | 18.12.2023 | ||
Former [2024/23] | AT | 16.08.2023 | |
CZ | 16.08.2023 | ||
DK | 16.08.2023 | ||
EE | 16.08.2023 | ||
ES | 16.08.2023 | ||
FI | 16.08.2023 | ||
HR | 16.08.2023 | ||
LT | 16.08.2023 | ||
LV | 16.08.2023 | ||
NL | 16.08.2023 | ||
PL | 16.08.2023 | ||
RO | 16.08.2023 | ||
RS | 16.08.2023 | ||
SE | 16.08.2023 | ||
SK | 16.08.2023 | ||
SM | 16.08.2023 | ||
NO | 16.11.2023 | ||
GR | 17.11.2023 | ||
IS | 16.12.2023 | ||
PT | 18.12.2023 | ||
Former [2024/22] | AT | 16.08.2023 | |
CZ | 16.08.2023 | ||
DK | 16.08.2023 | ||
FI | 16.08.2023 | ||
HR | 16.08.2023 | ||
LT | 16.08.2023 | ||
LV | 16.08.2023 | ||
NL | 16.08.2023 | ||
PL | 16.08.2023 | ||
RO | 16.08.2023 | ||
RS | 16.08.2023 | ||
SE | 16.08.2023 | ||
SM | 16.08.2023 | ||
NO | 16.11.2023 | ||
GR | 17.11.2023 | ||
IS | 16.12.2023 | ||
PT | 18.12.2023 | ||
Former [2024/20] | AT | 16.08.2023 | |
FI | 16.08.2023 | ||
HR | 16.08.2023 | ||
LT | 16.08.2023 | ||
LV | 16.08.2023 | ||
NL | 16.08.2023 | ||
PL | 16.08.2023 | ||
RS | 16.08.2023 | ||
SE | 16.08.2023 | ||
SM | 16.08.2023 | ||
NO | 16.11.2023 | ||
GR | 17.11.2023 | ||
IS | 16.12.2023 | ||
PT | 18.12.2023 | ||
Former [2024/10] | AT | 16.08.2023 | |
FI | 16.08.2023 | ||
HR | 16.08.2023 | ||
LT | 16.08.2023 | ||
LV | 16.08.2023 | ||
NL | 16.08.2023 | ||
PL | 16.08.2023 | ||
RS | 16.08.2023 | ||
SE | 16.08.2023 | ||
NO | 16.11.2023 | ||
GR | 17.11.2023 | ||
IS | 16.12.2023 | ||
PT | 18.12.2023 | ||
Former [2024/09] | AT | 16.08.2023 | |
FI | 16.08.2023 | ||
LT | 16.08.2023 | ||
NL | 16.08.2023 | ||
SE | 16.08.2023 | ||
NO | 16.11.2023 | ||
GR | 17.11.2023 | ||
IS | 16.12.2023 | ||
Former [2024/08] | LT | 16.08.2023 | |
NL | 16.08.2023 | ||
NO | 16.11.2023 | ||
GR | 17.11.2023 | Cited in | International search | [YA]US6487260 (SCHWEICKERT ROBERT K [US], et al) [Y] 1-14,17-19 * figure 1 * [A] 15,16; | [A]US6804290 (KING THOMAS M [US], et al) [A] 15,16,20-33 * column 13, line 53 - column 15, line 50; figures 1,3,4,5,8,9 *; | [A]US2006072689 (KIM YUN-YOUNG [KR], et al) [A] 15,16,20-33* paragraphs [0010] - [0016] - [0038] - [0042]; figures 2,3,5 *; | [YA]US2009323867 (RASMUSSEN DONALD JOHN [US]) [Y] 1-14,17-19 * paragraphs [0003] - [0006] - [0027] - [0031] - [0047] - [0050]; figures 2,6,7 * [A] 15,16; | [YDA]WO2014167318 (NORDIC SEMICONDUCTOR ASA [NO], et al) [YD] 1-14,17-19 * page 7, line 26 - page 11, line 9 * * page 13, line 23 - line 32; figure 1 * [A] 15,16; | [YA]WO2017098196 (NORDIC SEMICONDUCTOR ASA [NO], et al) [Y] 1-14,17-19 * figures 2-4; claims 1-18 * [A] 15,16 |