blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3743878

EP3743878 - ENERGY GENERATION SYSTEM, METHOD FOR OPERATING A COMPUTING UNIT, AND RETROFIT ASSEMBLY [Right-click to bookmark this link]
StatusThe application is deemed to be withdrawn
Status updated on  26.05.2023
Database last updated on 02.09.2024
FormerExamination is in progress
Status updated on  22.09.2022
FormerRequest for examination was made
Status updated on  30.10.2020
FormerThe international publication has been made
Status updated on  27.07.2019
Formerunknown
Status updated on  28.01.2019
Most recent event   Tooltip26.05.2023Application deemed to be withdrawnpublished on 28.06.2023  [2023/26]
Applicant(s)For all designated states
Mader, Tobias
An der Linde 17
86987 Schwabsoien / DE
[2020/49]
Inventor(s)01 / see applicant
...
 [2020/49]
Representative(s)Prinz & Partner mbB
Patent- und Rechtsanwälte
Rundfunkplatz 2
80335 München / DE
[2020/49]
Application number, filing date19700665.310.01.2019
[2020/49]
WO2019EP50573
Priority number, dateDE20181010132722.01.2018         Original published format: DE102018101327
[2020/49]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report
No.:WO2019141587
Date:25.07.2019
Language:DE
[2019/30]
Type: A1 Application with search report 
No.:EP3743878
Date:02.12.2020
Language:DE
The application published by WIPO in one of the EPO official languages on 25.07.2019 takes the place of the publication of the European patent application.
[2020/49]
Search report(s)International search report - published on:EP25.07.2019
ClassificationIPC:G06Q50/06
[2020/49]
CPC:
G06Q50/06 (EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/49]
TitleGerman:ENERGIEERZEUGUNGSANLAGE, VERFAHREN ZUM BETREIBEN EINER RECHEN-EINHEIT SOWIE NACHRÜSTBAUGRUPPE[2020/49]
English:ENERGY GENERATION SYSTEM, METHOD FOR OPERATING A COMPUTING UNIT, AND RETROFIT ASSEMBLY[2020/49]
French:INSTALLATION DE PRODUCTION D'ÉNERGIE, PROCÉDÉ SERVANT À FAIRE FONCTIONNER UNE UNITÉ DE CALCUL ET MODULE D'ÉQUIPEMENT ULTÉRIEUR[2020/49]
Entry into regional phase14.08.2020National basic fee paid 
14.08.2020Designation fee(s) paid 
14.08.2020Examination fee paid 
Examination procedure14.08.2020Examination requested  [2020/49]
14.08.2020Date on which the examining division has become responsible
11.03.2021Amendment by applicant (claims and/or description)
21.09.2022Despatch of a communication from the examining division (Time limit: M04)
02.02.2023Application deemed to be withdrawn, date of legal effect  [2023/26]
22.02.2023Despatch of communication that the application is deemed to be withdrawn, reason: reply to the communication from the examining division not received in time  [2023/26]
Fees paidRenewal fee
27.01.2021Renewal fee patent year 03
24.01.2022Renewal fee patent year 04
Penalty fee
Additional fee for renewal fee
31.01.202305   M06   Not yet paid
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Cited inInternational search[I]US2011270682  (VALIN DAVID [US]) [I] 1-13 * paragraph [0001] - paragraph [0020]; figures 1,4,10 * * paragraph [0045] - paragraph [0052] *;
 [I]  - David Wogan, "Data centers of the future might be their own power plants - Scientific American Blog Network", (20131113), URL: https://blogs.scientificamerican.com/plugged-in/data-centers-of-the-future-might-be-their-own-power-plants/, (20190208), XP055554364 [I] 1-13 * the whole document *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.