EP3741192 - INSTALLATION AND CONFIGURATION OF DALI DEVICES FOR LIGHTING DEVICES [Right-click to bookmark this link] | |||
Former [2020/48] | INSTALLATION AND CONFIGURATION OF DALI OPERATING DEVICES FOR LAMPS | ||
[2023/40] | Status | No opposition filed within time limit Status updated on 25.10.2024 Database last updated on 02.11.2024 | |
Former | The patent has been granted Status updated on 17.11.2023 | ||
Former | Grant of patent is intended Status updated on 24.09.2023 | ||
Former | Examination is in progress Status updated on 29.10.2021 | ||
Former | Request for examination was made Status updated on 23.10.2020 | ||
Former | The international publication has been made Status updated on 07.09.2019 | ||
Former | unknown Status updated on 08.03.2019 | Most recent event Tooltip | 01.11.2024 | Lapse of the patent in a contracting state New state(s): SI | published on 04.12.2024 [2024/49] | Applicant(s) | For all designated states Zumtobel Lighting GmbH Schweizer Straße 30 6850 Dornbirn / AT | [2020/48] | Inventor(s) | 01 /
REIN, Thomas Im Böckler 11 6850 Dornbirn / AT | 02 /
STEFFENS, Thomas Lauenbühlstraße 66 88161 Lindenberg im Allgäu / DE | [2020/48] | Representative(s) | Rupp, Christian Mitscherlich PartmbB Patent- und Rechtsanwälte Karlstraße 7 80333 München / DE | [2023/51] |
Former [2020/48] | Rupp, Christian Mitscherlich PartmbB Patent- und Rechtsanwälte Sonnenstraße 33 80331 München / DE | Application number, filing date | 19706987.5 | 21.02.2019 | [2020/48] | WO2019EP54385 | Priority number, date | DE201810202965 | 28.02.2018 Original published format: DE102018202965 | [2020/48] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | WO2019166329 | Date: | 06.09.2019 | Language: | DE | [2019/36] | Type: | A1 Application with search report | No.: | EP3741192 | Date: | 25.11.2020 | Language: | DE | The application published by WIPO in one of the EPO official languages on 06.09.2019 takes the place of the publication of the European patent application. | [2020/48] | Type: | B1 Patent specification | No.: | EP3741192 | Date: | 20.12.2023 | Language: | DE | [2023/51] | Search report(s) | International search report - published on: | EP | 06.09.2019 | Classification | IPC: | H05B47/10, H05B47/18, H05B47/19 | [2023/40] | CPC: |
H05B47/18 (EP,US);
H05B47/19 (EP,US)
|
Former IPC [2020/48] | H05B37/02 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/48] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | INSTALLATION UND KONFIGURATION VON DALI-BETRIEBSGERÄTEN FÜR LEUCHTMITTEL | [2020/48] | English: | INSTALLATION AND CONFIGURATION OF DALI DEVICES FOR LIGHTING DEVICES | [2023/40] | French: | INSTALLATION ET CONFIGURATION D'APAREILS DALI POUR DES DISPOSITIFS D'ÉCLAIRAGE | [2023/40] |
Former [2020/48] | INSTALLATION AND CONFIGURATION OF DALI OPERATING DEVICES FOR LAMPS | ||
Former [2020/48] | INSTALLATION ET CONFIGURATION D'APPAREILS DE COMMANDE DALI POUR MOYENS D'ÉCLAIRAGE | Entry into regional phase | 20.08.2020 | National basic fee paid | 20.08.2020 | Designation fee(s) paid | 20.08.2020 | Examination fee paid | Examination procedure | 20.08.2020 | Examination requested [2020/48] | 20.08.2020 | Date on which the examining division has become responsible | 21.12.2020 | Amendment by applicant (claims and/or description) | 02.11.2021 | Despatch of a communication from the examining division (Time limit: M04) | 20.01.2022 | Reply to a communication from the examining division | 24.08.2023 | Cancellation of oral proceeding that was planned for 12.09.2023 | 12.09.2023 | Date of oral proceedings (cancelled) | 25.09.2023 | Communication of intention to grant the patent | 13.11.2023 | Fee for grant paid | 13.11.2023 | Fee for publishing/printing paid | 13.11.2023 | Receipt of the translation of the claim(s) | Opposition(s) | 23.09.2024 | No opposition filed within time limit [2024/48] | Fees paid | Renewal fee | 25.02.2021 | Renewal fee patent year 03 | 24.02.2022 | Renewal fee patent year 04 | 23.02.2023 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | CZ | 20.12.2023 | DK | 20.12.2023 | EE | 20.12.2023 | ES | 20.12.2023 | FI | 20.12.2023 | HR | 20.12.2023 | IT | 20.12.2023 | LT | 20.12.2023 | LV | 20.12.2023 | MC | 20.12.2023 | NL | 20.12.2023 | PL | 20.12.2023 | RO | 20.12.2023 | RS | 20.12.2023 | SE | 20.12.2023 | SI | 20.12.2023 | SK | 20.12.2023 | SM | 20.12.2023 | LU | 21.02.2024 | BG | 20.03.2024 | NO | 20.03.2024 | GR | 21.03.2024 | IS | 20.04.2024 | PT | 22.04.2024 | [2024/49] |
Former [2024/47] | CZ | 20.12.2023 | |
DK | 20.12.2023 | ||
EE | 20.12.2023 | ||
ES | 20.12.2023 | ||
FI | 20.12.2023 | ||
HR | 20.12.2023 | ||
IT | 20.12.2023 | ||
LT | 20.12.2023 | ||
LV | 20.12.2023 | ||
MC | 20.12.2023 | ||
NL | 20.12.2023 | ||
PL | 20.12.2023 | ||
RO | 20.12.2023 | ||
RS | 20.12.2023 | ||
SE | 20.12.2023 | ||
SK | 20.12.2023 | ||
SM | 20.12.2023 | ||
LU | 21.02.2024 | ||
BG | 20.03.2024 | ||
NO | 20.03.2024 | ||
GR | 21.03.2024 | ||
IS | 20.04.2024 | ||
PT | 22.04.2024 | ||
Former [2024/45] | CZ | 20.12.2023 | |
EE | 20.12.2023 | ||
ES | 20.12.2023 | ||
FI | 20.12.2023 | ||
HR | 20.12.2023 | ||
IT | 20.12.2023 | ||
LT | 20.12.2023 | ||
LV | 20.12.2023 | ||
MC | 20.12.2023 | ||
NL | 20.12.2023 | ||
PL | 20.12.2023 | ||
RO | 20.12.2023 | ||
RS | 20.12.2023 | ||
SE | 20.12.2023 | ||
SK | 20.12.2023 | ||
SM | 20.12.2023 | ||
BG | 20.03.2024 | ||
NO | 20.03.2024 | ||
GR | 21.03.2024 | ||
IS | 20.04.2024 | ||
PT | 22.04.2024 | ||
Former [2024/36] | CZ | 20.12.2023 | |
EE | 20.12.2023 | ||
ES | 20.12.2023 | ||
FI | 20.12.2023 | ||
HR | 20.12.2023 | ||
IT | 20.12.2023 | ||
LT | 20.12.2023 | ||
LV | 20.12.2023 | ||
NL | 20.12.2023 | ||
PL | 20.12.2023 | ||
RO | 20.12.2023 | ||
RS | 20.12.2023 | ||
SE | 20.12.2023 | ||
SK | 20.12.2023 | ||
SM | 20.12.2023 | ||
BG | 20.03.2024 | ||
NO | 20.03.2024 | ||
GR | 21.03.2024 | ||
IS | 20.04.2024 | ||
PT | 22.04.2024 | ||
Former [2024/35] | CZ | 20.12.2023 | |
EE | 20.12.2023 | ||
ES | 20.12.2023 | ||
FI | 20.12.2023 | ||
HR | 20.12.2023 | ||
LT | 20.12.2023 | ||
LV | 20.12.2023 | ||
NL | 20.12.2023 | ||
RO | 20.12.2023 | ||
RS | 20.12.2023 | ||
SE | 20.12.2023 | ||
SM | 20.12.2023 | ||
BG | 20.03.2024 | ||
NO | 20.03.2024 | ||
GR | 21.03.2024 | ||
IS | 20.04.2024 | ||
Former [2024/34] | EE | 20.12.2023 | |
ES | 20.12.2023 | ||
FI | 20.12.2023 | ||
HR | 20.12.2023 | ||
LT | 20.12.2023 | ||
LV | 20.12.2023 | ||
NL | 20.12.2023 | ||
RS | 20.12.2023 | ||
SE | 20.12.2023 | ||
SM | 20.12.2023 | ||
BG | 20.03.2024 | ||
NO | 20.03.2024 | ||
GR | 21.03.2024 | ||
IS | 20.04.2024 | ||
Former [2024/33] | ES | 20.12.2023 | |
FI | 20.12.2023 | ||
HR | 20.12.2023 | ||
LT | 20.12.2023 | ||
LV | 20.12.2023 | ||
NL | 20.12.2023 | ||
RS | 20.12.2023 | ||
SE | 20.12.2023 | ||
SM | 20.12.2023 | ||
BG | 20.03.2024 | ||
NO | 20.03.2024 | ||
GR | 21.03.2024 | ||
IS | 20.04.2024 | ||
Former [2024/32] | ES | 20.12.2023 | |
FI | 20.12.2023 | ||
HR | 20.12.2023 | ||
LT | 20.12.2023 | ||
LV | 20.12.2023 | ||
NL | 20.12.2023 | ||
RS | 20.12.2023 | ||
SE | 20.12.2023 | ||
BG | 20.03.2024 | ||
NO | 20.03.2024 | ||
GR | 21.03.2024 | ||
IS | 20.04.2024 | ||
Former [2024/26] | ES | 20.12.2023 | |
FI | 20.12.2023 | ||
HR | 20.12.2023 | ||
LT | 20.12.2023 | ||
LV | 20.12.2023 | ||
NL | 20.12.2023 | ||
RS | 20.12.2023 | ||
SE | 20.12.2023 | ||
BG | 20.03.2024 | ||
NO | 20.03.2024 | ||
GR | 21.03.2024 | ||
Former [2024/25] | ES | 20.12.2023 | |
FI | 20.12.2023 | ||
HR | 20.12.2023 | ||
LT | 20.12.2023 | ||
RS | 20.12.2023 | ||
SE | 20.12.2023 | ||
BG | 20.03.2024 | ||
NO | 20.03.2024 | ||
GR | 21.03.2024 | ||
Former [2024/21] | FI | 20.12.2023 | |
LT | 20.12.2023 | ||
BG | 20.03.2024 | ||
GR | 21.03.2024 | ||
Former [2024/20] | GR | 21.03.2024 | Cited in | International search | [Y]WO03077610 (KONINKL PHILIPS ELECTRONICS NV [NL]) [Y] 2 * page 2, line 15 - line 19 *; | [XY]US2006125426 (VESKOVIC DRAGAN [US], et al) [X] 1,4,5 * paragraphs [0024] , [0 48]; figures 1,2 * [Y] 2,3,5-12; | [Y]WO2006095315 (KONINKL PHILIPS ELECTRONICS NV [NL], et al) [Y] 7,9* page 9, line 2 - line 7 *; | [Y]WO2015148929 (BOSCH GMBH ROBERT [DE]) [Y] 5,6,8,10-12 * paragraph [0025] - paragraph [0027] *; | [Y]WO2018024528 (PHILIPS LIGHTING HOLDING BV [NL]) [Y] 3 * page 9, line 28 - line 31 * |