EP3759411 - TUBE BUNDLE-TYPE HEAT EXCHANGER, TUBE BASE, AND METHOD FOR SEALING SAME [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 11.11.2022 Database last updated on 02.11.2024 | |
Former | The patent has been granted Status updated on 03.12.2021 | ||
Former | Grant of patent is intended Status updated on 09.08.2021 | ||
Former | Request for examination was made Status updated on 04.12.2020 | ||
Former | The international publication has been made Status updated on 07.09.2019 | ||
Former | unknown Status updated on 14.03.2019 | Most recent event Tooltip | 27.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 30.10.2024 [2024/44] | Applicant(s) | For all designated states SGL Carbon SE Söhnleinstrasse 8 65201 Wiesbaden / DE | [2021/01] | Inventor(s) | 01 /
ANETSEDER, Werner Werner-von-Siemens-Str. 18 86405 Meitingen / DE | 02 /
FERBER, Hermann Werner-von-Siemens-Str. 18 86405 Meitingen / DE | 03 /
BALDERMANN, Klaus Werner-von-Siemens-Str. 18 86405 Meitingen / DE | 04 /
SPULLER, Ralph Werner-von-Siemens-Str. 18 86405 Meitingen / DE | [2021/01] | Application number, filing date | 19708280.3 | 27.02.2019 | [2021/01] | WO2019EP54870 | Priority number, date | DE20181001548 | 28.02.2018 Original published format: DE102018001548 | [2021/01] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | WO2019166493 | Date: | 06.09.2019 | Language: | DE | [2019/36] | Type: | A1 Application with search report | No.: | EP3759411 | Date: | 06.01.2021 | Language: | DE | The application published by WIPO in one of the EPO official languages on 06.09.2019 takes the place of the publication of the European patent application. | [2021/01] | Type: | B1 Patent specification | No.: | EP3759411 | Date: | 05.01.2022 | Language: | DE | [2022/01] | Search report(s) | International search report - published on: | EP | 06.09.2019 | Classification | IPC: | F28F9/02, F28F9/06, F28F9/12, F28F21/00, F28F21/02, F28F21/04, F28F21/06, F28D7/16 | [2021/01] | CPC: |
F28F9/0221 (EP,KR,US);
F28D7/16 (EP,KR,US);
F28F21/006 (EP,KR,US);
F28F21/02 (EP,KR,US);
F28F21/04 (EP,KR,US);
F28F21/06 (EP,KR);
F28F21/062 (US);
F28F9/0229 (EP,KR,US);
F28F9/06 (EP,KR);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2021/01] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | ROHRBÜNDELWÄRMEAUSTAUSCHER SOWIE ROHRBODEN UND VERFAHREN ZUM ABDICHTEN DESSELBEN | [2021/01] | English: | TUBE BUNDLE-TYPE HEAT EXCHANGER, TUBE BASE, AND METHOD FOR SEALING SAME | [2021/01] | French: | ÉCHANGEUR DE CHALEUR À FAISCEAU TUBULAIRE ET PLAQUE TUBULAIRE ET PROCÉDÉ POUR ASSURER SON ÉTANCHÉITÉ | [2021/01] | Entry into regional phase | 28.09.2020 | National basic fee paid | 28.09.2020 | Designation fee(s) paid | 28.09.2020 | Examination fee paid | Examination procedure | 28.09.2020 | Examination requested [2021/01] | 28.09.2020 | Date on which the examining division has become responsible | 08.04.2021 | Amendment by applicant (claims and/or description) | 10.08.2021 | Communication of intention to grant the patent | 25.11.2021 | Fee for grant paid | 25.11.2021 | Fee for publishing/printing paid | 25.11.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 06.10.2022 | No opposition filed within time limit [2022/50] | Fees paid | Renewal fee | 17.02.2021 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 27.02.2019 | AL | 05.01.2022 | CY | 05.01.2022 | CZ | 05.01.2022 | DK | 05.01.2022 | EE | 05.01.2022 | FI | 05.01.2022 | HR | 05.01.2022 | LT | 05.01.2022 | LV | 05.01.2022 | MC | 05.01.2022 | MK | 05.01.2022 | MT | 05.01.2022 | PL | 05.01.2022 | RO | 05.01.2022 | RS | 05.01.2022 | SE | 05.01.2022 | SI | 05.01.2022 | SK | 05.01.2022 | SM | 05.01.2022 | TR | 05.01.2022 | IE | 27.02.2022 | LU | 27.02.2022 | CH | 28.02.2022 | LI | 28.02.2022 | BG | 05.04.2022 | NO | 05.04.2022 | GR | 06.04.2022 | IS | 05.05.2022 | PT | 05.05.2022 | [2024/44] |
Former [2024/29] | HU | 27.02.2019 | |
AL | 05.01.2022 | ||
CY | 05.01.2022 | ||
CZ | 05.01.2022 | ||
DK | 05.01.2022 | ||
EE | 05.01.2022 | ||
FI | 05.01.2022 | ||
HR | 05.01.2022 | ||
LT | 05.01.2022 | ||
LV | 05.01.2022 | ||
MC | 05.01.2022 | ||
MK | 05.01.2022 | ||
PL | 05.01.2022 | ||
RO | 05.01.2022 | ||
RS | 05.01.2022 | ||
SE | 05.01.2022 | ||
SI | 05.01.2022 | ||
SK | 05.01.2022 | ||
SM | 05.01.2022 | ||
TR | 05.01.2022 | ||
IE | 27.02.2022 | ||
LU | 27.02.2022 | ||
CH | 28.02.2022 | ||
LI | 28.02.2022 | ||
BG | 05.04.2022 | ||
NO | 05.04.2022 | ||
GR | 06.04.2022 | ||
IS | 05.05.2022 | ||
PT | 05.05.2022 | ||
Former [2024/25] | HU | 27.02.2019 | |
AL | 05.01.2022 | ||
CY | 05.01.2022 | ||
CZ | 05.01.2022 | ||
DK | 05.01.2022 | ||
EE | 05.01.2022 | ||
FI | 05.01.2022 | ||
HR | 05.01.2022 | ||
LT | 05.01.2022 | ||
LV | 05.01.2022 | ||
MC | 05.01.2022 | ||
MK | 05.01.2022 | ||
PL | 05.01.2022 | ||
RO | 05.01.2022 | ||
RS | 05.01.2022 | ||
SE | 05.01.2022 | ||
SI | 05.01.2022 | ||
SK | 05.01.2022 | ||
SM | 05.01.2022 | ||
IE | 27.02.2022 | ||
LU | 27.02.2022 | ||
CH | 28.02.2022 | ||
LI | 28.02.2022 | ||
BG | 05.04.2022 | ||
NO | 05.04.2022 | ||
GR | 06.04.2022 | ||
IS | 05.05.2022 | ||
PT | 05.05.2022 | ||
Former [2024/23] | AL | 05.01.2022 | |
CY | 05.01.2022 | ||
CZ | 05.01.2022 | ||
DK | 05.01.2022 | ||
EE | 05.01.2022 | ||
FI | 05.01.2022 | ||
HR | 05.01.2022 | ||
LT | 05.01.2022 | ||
LV | 05.01.2022 | ||
MC | 05.01.2022 | ||
MK | 05.01.2022 | ||
PL | 05.01.2022 | ||
RO | 05.01.2022 | ||
RS | 05.01.2022 | ||
SE | 05.01.2022 | ||
SI | 05.01.2022 | ||
SK | 05.01.2022 | ||
SM | 05.01.2022 | ||
IE | 27.02.2022 | ||
LU | 27.02.2022 | ||
CH | 28.02.2022 | ||
LI | 28.02.2022 | ||
BG | 05.04.2022 | ||
NO | 05.04.2022 | ||
GR | 06.04.2022 | ||
IS | 05.05.2022 | ||
PT | 05.05.2022 | ||
Former [2024/20] | AL | 05.01.2022 | |
CY | 05.01.2022 | ||
CZ | 05.01.2022 | ||
DK | 05.01.2022 | ||
EE | 05.01.2022 | ||
FI | 05.01.2022 | ||
HR | 05.01.2022 | ||
LT | 05.01.2022 | ||
LV | 05.01.2022 | ||
MC | 05.01.2022 | ||
PL | 05.01.2022 | ||
RO | 05.01.2022 | ||
RS | 05.01.2022 | ||
SE | 05.01.2022 | ||
SI | 05.01.2022 | ||
SK | 05.01.2022 | ||
SM | 05.01.2022 | ||
IE | 27.02.2022 | ||
LU | 27.02.2022 | ||
CH | 28.02.2022 | ||
LI | 28.02.2022 | ||
BG | 05.04.2022 | ||
NO | 05.04.2022 | ||
GR | 06.04.2022 | ||
IS | 05.05.2022 | ||
PT | 05.05.2022 | ||
Former [2023/10] | AL | 05.01.2022 | |
CZ | 05.01.2022 | ||
DK | 05.01.2022 | ||
EE | 05.01.2022 | ||
FI | 05.01.2022 | ||
HR | 05.01.2022 | ||
LT | 05.01.2022 | ||
LV | 05.01.2022 | ||
MC | 05.01.2022 | ||
PL | 05.01.2022 | ||
RO | 05.01.2022 | ||
RS | 05.01.2022 | ||
SE | 05.01.2022 | ||
SI | 05.01.2022 | ||
SK | 05.01.2022 | ||
SM | 05.01.2022 | ||
IE | 27.02.2022 | ||
LU | 27.02.2022 | ||
CH | 28.02.2022 | ||
LI | 28.02.2022 | ||
BG | 05.04.2022 | ||
NO | 05.04.2022 | ||
GR | 06.04.2022 | ||
IS | 05.05.2022 | ||
PT | 05.05.2022 | ||
Former [2023/09] | AL | 05.01.2022 | |
CZ | 05.01.2022 | ||
DK | 05.01.2022 | ||
EE | 05.01.2022 | ||
FI | 05.01.2022 | ||
HR | 05.01.2022 | ||
LT | 05.01.2022 | ||
LV | 05.01.2022 | ||
MC | 05.01.2022 | ||
PL | 05.01.2022 | ||
RO | 05.01.2022 | ||
RS | 05.01.2022 | ||
SE | 05.01.2022 | ||
SK | 05.01.2022 | ||
SM | 05.01.2022 | ||
IE | 27.02.2022 | ||
LU | 27.02.2022 | ||
CH | 28.02.2022 | ||
LI | 28.02.2022 | ||
BG | 05.04.2022 | ||
NO | 05.04.2022 | ||
GR | 06.04.2022 | ||
IS | 05.05.2022 | ||
PT | 05.05.2022 | ||
Former [2023/01] | AL | 05.01.2022 | |
CZ | 05.01.2022 | ||
DK | 05.01.2022 | ||
EE | 05.01.2022 | ||
FI | 05.01.2022 | ||
HR | 05.01.2022 | ||
LT | 05.01.2022 | ||
LV | 05.01.2022 | ||
MC | 05.01.2022 | ||
PL | 05.01.2022 | ||
RO | 05.01.2022 | ||
RS | 05.01.2022 | ||
SE | 05.01.2022 | ||
SK | 05.01.2022 | ||
SM | 05.01.2022 | ||
LU | 27.02.2022 | ||
BG | 05.04.2022 | ||
NO | 05.04.2022 | ||
GR | 06.04.2022 | ||
IS | 05.05.2022 | ||
PT | 05.05.2022 | ||
Former [2022/49] | CZ | 05.01.2022 | |
DK | 05.01.2022 | ||
EE | 05.01.2022 | ||
FI | 05.01.2022 | ||
HR | 05.01.2022 | ||
LT | 05.01.2022 | ||
LV | 05.01.2022 | ||
MC | 05.01.2022 | ||
PL | 05.01.2022 | ||
RO | 05.01.2022 | ||
RS | 05.01.2022 | ||
SE | 05.01.2022 | ||
SK | 05.01.2022 | ||
SM | 05.01.2022 | ||
LU | 27.02.2022 | ||
BG | 05.04.2022 | ||
NO | 05.04.2022 | ||
GR | 06.04.2022 | ||
IS | 05.05.2022 | ||
PT | 05.05.2022 | ||
Former [2022/48] | CZ | 05.01.2022 | |
DK | 05.01.2022 | ||
EE | 05.01.2022 | ||
FI | 05.01.2022 | ||
HR | 05.01.2022 | ||
LT | 05.01.2022 | ||
LV | 05.01.2022 | ||
MC | 05.01.2022 | ||
PL | 05.01.2022 | ||
RO | 05.01.2022 | ||
RS | 05.01.2022 | ||
SE | 05.01.2022 | ||
SM | 05.01.2022 | ||
LU | 27.02.2022 | ||
BG | 05.04.2022 | ||
NO | 05.04.2022 | ||
GR | 06.04.2022 | ||
IS | 05.05.2022 | ||
PT | 05.05.2022 | ||
Former [2022/47] | DK | 05.01.2022 | |
FI | 05.01.2022 | ||
HR | 05.01.2022 | ||
LT | 05.01.2022 | ||
LV | 05.01.2022 | ||
MC | 05.01.2022 | ||
PL | 05.01.2022 | ||
RO | 05.01.2022 | ||
RS | 05.01.2022 | ||
SE | 05.01.2022 | ||
SM | 05.01.2022 | ||
LU | 27.02.2022 | ||
BG | 05.04.2022 | ||
NO | 05.04.2022 | ||
GR | 06.04.2022 | ||
IS | 05.05.2022 | ||
PT | 05.05.2022 | ||
Former [2022/46] | DK | 05.01.2022 | |
FI | 05.01.2022 | ||
HR | 05.01.2022 | ||
LT | 05.01.2022 | ||
LV | 05.01.2022 | ||
PL | 05.01.2022 | ||
RS | 05.01.2022 | ||
SE | 05.01.2022 | ||
BG | 05.04.2022 | ||
NO | 05.04.2022 | ||
GR | 06.04.2022 | ||
IS | 05.05.2022 | ||
PT | 05.05.2022 | ||
Former [2022/42] | FI | 05.01.2022 | |
HR | 05.01.2022 | ||
LT | 05.01.2022 | ||
LV | 05.01.2022 | ||
PL | 05.01.2022 | ||
RS | 05.01.2022 | ||
SE | 05.01.2022 | ||
BG | 05.04.2022 | ||
NO | 05.04.2022 | ||
GR | 06.04.2022 | ||
IS | 05.05.2022 | ||
PT | 05.05.2022 | ||
Former [2022/39] | FI | 05.01.2022 | |
HR | 05.01.2022 | ||
LT | 05.01.2022 | ||
LV | 05.01.2022 | ||
PL | 05.01.2022 | ||
RS | 05.01.2022 | ||
SE | 05.01.2022 | ||
BG | 05.04.2022 | ||
NO | 05.04.2022 | ||
GR | 06.04.2022 | ||
PT | 05.05.2022 | ||
Former [2022/36] | HR | 05.01.2022 | |
LT | 05.01.2022 | ||
LV | 05.01.2022 | ||
PL | 05.01.2022 | ||
RS | 05.01.2022 | ||
SE | 05.01.2022 | ||
BG | 05.04.2022 | ||
NO | 05.04.2022 | ||
GR | 06.04.2022 | ||
PT | 05.05.2022 | ||
Former [2022/35] | HR | 05.01.2022 | |
LT | 05.01.2022 | ||
RS | 05.01.2022 | ||
SE | 05.01.2022 | ||
BG | 05.04.2022 | ||
NO | 05.04.2022 | ||
PT | 05.05.2022 | ||
Former [2022/34] | LT | 05.01.2022 | |
NO | 05.04.2022 | ||
PT | 05.05.2022 | ||
Former [2022/33] | LT | 05.01.2022 | |
NO | 05.04.2022 | Cited in | International search | [A]EP1422488 (TYCON TECHNOGLASS S R L [IT]) [A] 1-15 * figure 3 *; | [A]EP1491842 (ITALPROTEC S A S DI COTOGNI CA [IT]) [A] 1-15 * figure 2 *; | [AD]DE102010005216 (GAB NEUMANN GMBH [DE]) [AD] 1-15 * figure 1 *; | [A]DE202004021912U (SGL CARBON SE [DE]) [A] 1-15 * figure 1 *; | [A]DE102015114130 (TROFIMOV PETR M [RU]) [A] 1-15* figure 2 * | by applicant | DE19714423 | DE102010005216 |