blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3737629

EP3737629 - TOP SEAL FOR A LOADING/UNLOADING DOCK, DOCK, DISTRIBUTION CENTRE AND METHOD THEREFOR [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  14.10.2022
Database last updated on 24.07.2024
FormerThe patent has been granted
Status updated on  05.11.2021
FormerGrant of patent is intended
Status updated on  07.07.2021
FormerRequest for examination was made
Status updated on  16.10.2020
FormerThe international publication has been made
Status updated on  19.07.2019
Formerunknown
Status updated on  12.04.2019
Most recent event   Tooltip14.06.2024Lapse of the patent in a contracting state
New state(s): TR
published on 17.07.2024  [2024/29]
Applicant(s)For all designated states
STERTIL B.V.
Westkern 3
9288 CA Kootstertille / NL
[2020/47]
Inventor(s)01 / STAPENSEA, Jan Bernard
Hotze Buwaldastraat 23
9076 HG St. Annaparochie / NL
02 / FIJNVANDRAAT, Jan Willem
Legedyk 8
8935 DG Leeuwarden / NL
 [2020/47]
Representative(s)Arnold & Siedsma
Bezuidenhoutseweg 57
2594 AC The Hague / NL
[2020/47]
Application number, filing date19714822.410.01.2019
[2020/47]
WO2019NL50014
Priority number, dateNL2018202026711.01.2018         Original published format: NL 2020267
[2020/47]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2019139477
Date:18.07.2019
Language:EN
[2019/29]
Type: A1 Application with search report 
No.:EP3737629
Date:18.11.2020
Language:EN
The application published by WIPO in one of the EPO official languages on 18.07.2019 takes the place of the publication of the European patent application.
[2020/47]
Type: B1 Patent specification 
No.:EP3737629
Date:08.12.2021
Language:EN
[2021/49]
Search report(s)International search report - published on:EP18.07.2019
ClassificationIPC:B65G69/32, B65G69/00
[2020/47]
CPC:
B65G69/008 (EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/47]
Extension statesBANot yet paid
MENot yet paid
Validation statesKHNot yet paid
MANot yet paid
MDNot yet paid
TNNot yet paid
TitleGerman:OBERE ABDICHTUNG FÜR EIN BE-/ENTLADEDOCK, DOCK, VERTEILZENTRUM UND VERFAHREN DAFÜR[2020/47]
English:TOP SEAL FOR A LOADING/UNLOADING DOCK, DOCK, DISTRIBUTION CENTRE AND METHOD THEREFOR[2020/47]
French:JOINT SUPÉRIEUR DESTINÉ À UN QUAI DE CHARGEMENT/DÉCHARGEMENT, QUAI ET CENTRE DE DISTRIBUTION, ET PROCÉDÉ ASSOCIÉ[2021/31]
Former [2020/47]JOINT SUPÉRIEUR DESTINÉ À UN QUAI DE CHARGEMENT/DÉCHARGEMENT, QUAI, CENTRE DE DISTRIBUTION ET PROCÉDÉ ASSOCIÉ
Entry into regional phase05.08.2020National basic fee paid 
05.08.2020Designation fee(s) paid 
05.08.2020Examination fee paid 
Examination procedure05.08.2020Examination requested  [2020/47]
05.08.2020Date on which the examining division has become responsible
28.01.2021Amendment by applicant (claims and/or description)
08.07.2021Communication of intention to grant the patent
01.11.2021Fee for grant paid
01.11.2021Fee for publishing/printing paid
01.11.2021Receipt of the translation of the claim(s)
Opposition(s)09.09.2022No opposition filed within time limit [2022/46]
Fees paidRenewal fee
27.01.2021Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU10.01.2019
AL08.12.2021
AT08.12.2021
CY08.12.2021
CZ08.12.2021
DK08.12.2021
EE08.12.2021
ES08.12.2021
FI08.12.2021
HR08.12.2021
IT08.12.2021
LT08.12.2021
LV08.12.2021
MC08.12.2021
MK08.12.2021
PL08.12.2021
RO08.12.2021
RS08.12.2021
SE08.12.2021
SI08.12.2021
SK08.12.2021
SM08.12.2021
TR08.12.2021
IE10.01.2022
LU10.01.2022
BE31.01.2022
CH31.01.2022
LI31.01.2022
BG08.03.2022
NO08.03.2022
GR09.03.2022
IS08.04.2022
PT08.04.2022
[2024/29]
Former [2024/25]HU10.01.2019
AL08.12.2021
AT08.12.2021
CY08.12.2021
CZ08.12.2021
DK08.12.2021
EE08.12.2021
ES08.12.2021
FI08.12.2021
HR08.12.2021
IT08.12.2021
LT08.12.2021
LV08.12.2021
MC08.12.2021
MK08.12.2021
PL08.12.2021
RO08.12.2021
RS08.12.2021
SE08.12.2021
SI08.12.2021
SK08.12.2021
SM08.12.2021
IE10.01.2022
LU10.01.2022
BE31.01.2022
CH31.01.2022
LI31.01.2022
BG08.03.2022
NO08.03.2022
GR09.03.2022
IS08.04.2022
PT08.04.2022
Former [2024/23]AL08.12.2021
AT08.12.2021
CY08.12.2021
CZ08.12.2021
DK08.12.2021
EE08.12.2021
ES08.12.2021
FI08.12.2021
HR08.12.2021
IT08.12.2021
LT08.12.2021
LV08.12.2021
MC08.12.2021
MK08.12.2021
PL08.12.2021
RO08.12.2021
RS08.12.2021
SE08.12.2021
SI08.12.2021
SK08.12.2021
SM08.12.2021
IE10.01.2022
LU10.01.2022
BE31.01.2022
CH31.01.2022
LI31.01.2022
BG08.03.2022
NO08.03.2022
GR09.03.2022
IS08.04.2022
PT08.04.2022
Former [2024/20]AL08.12.2021
AT08.12.2021
CY08.12.2021
CZ08.12.2021
DK08.12.2021
EE08.12.2021
ES08.12.2021
FI08.12.2021
HR08.12.2021
IT08.12.2021
LT08.12.2021
LV08.12.2021
MC08.12.2021
PL08.12.2021
RO08.12.2021
RS08.12.2021
SE08.12.2021
SI08.12.2021
SK08.12.2021
SM08.12.2021
IE10.01.2022
LU10.01.2022
BE31.01.2022
CH31.01.2022
LI31.01.2022
BG08.03.2022
NO08.03.2022
GR09.03.2022
IS08.04.2022
PT08.04.2022
Former [2023/27]AL08.12.2021
AT08.12.2021
CZ08.12.2021
DK08.12.2021
EE08.12.2021
ES08.12.2021
FI08.12.2021
HR08.12.2021
IT08.12.2021
LT08.12.2021
LV08.12.2021
MC08.12.2021
PL08.12.2021
RO08.12.2021
RS08.12.2021
SE08.12.2021
SI08.12.2021
SK08.12.2021
SM08.12.2021
IE10.01.2022
LU10.01.2022
BE31.01.2022
CH31.01.2022
LI31.01.2022
BG08.03.2022
NO08.03.2022
GR09.03.2022
IS08.04.2022
PT08.04.2022
Former [2023/09]AL08.12.2021
AT08.12.2021
CZ08.12.2021
DK08.12.2021
EE08.12.2021
ES08.12.2021
FI08.12.2021
HR08.12.2021
LT08.12.2021
LV08.12.2021
MC08.12.2021
PL08.12.2021
RO08.12.2021
RS08.12.2021
SE08.12.2021
SI08.12.2021
SK08.12.2021
SM08.12.2021
IE10.01.2022
LU10.01.2022
BE31.01.2022
CH31.01.2022
LI31.01.2022
BG08.03.2022
NO08.03.2022
GR09.03.2022
IS08.04.2022
PT08.04.2022
Former [2023/03]AL08.12.2021
AT08.12.2021
CZ08.12.2021
DK08.12.2021
EE08.12.2021
ES08.12.2021
FI08.12.2021
HR08.12.2021
LT08.12.2021
LV08.12.2021
MC08.12.2021
PL08.12.2021
RO08.12.2021
RS08.12.2021
SE08.12.2021
SI08.12.2021
SK08.12.2021
SM08.12.2021
LU10.01.2022
BE31.01.2022
CH31.01.2022
LI31.01.2022
BG08.03.2022
NO08.03.2022
GR09.03.2022
IS08.04.2022
PT08.04.2022
Former [2023/01]AL08.12.2021
AT08.12.2021
CZ08.12.2021
DK08.12.2021
EE08.12.2021
ES08.12.2021
FI08.12.2021
HR08.12.2021
LT08.12.2021
LV08.12.2021
MC08.12.2021
PL08.12.2021
RO08.12.2021
RS08.12.2021
SE08.12.2021
SI08.12.2021
SK08.12.2021
SM08.12.2021
LU10.01.2022
BE31.01.2022
BG08.03.2022
NO08.03.2022
GR09.03.2022
IS08.04.2022
PT08.04.2022
Former [2022/49]AL08.12.2021
AT08.12.2021
CZ08.12.2021
DK08.12.2021
EE08.12.2021
ES08.12.2021
FI08.12.2021
HR08.12.2021
LT08.12.2021
LV08.12.2021
MC08.12.2021
PL08.12.2021
RO08.12.2021
RS08.12.2021
SE08.12.2021
SK08.12.2021
SM08.12.2021
LU10.01.2022
BG08.03.2022
NO08.03.2022
GR09.03.2022
IS08.04.2022
PT08.04.2022
Former [2022/46]AT08.12.2021
CZ08.12.2021
DK08.12.2021
EE08.12.2021
ES08.12.2021
FI08.12.2021
HR08.12.2021
LT08.12.2021
LV08.12.2021
MC08.12.2021
PL08.12.2021
RO08.12.2021
RS08.12.2021
SE08.12.2021
SK08.12.2021
SM08.12.2021
LU10.01.2022
BG08.03.2022
NO08.03.2022
GR09.03.2022
IS08.04.2022
PT08.04.2022
Former [2022/44]AT08.12.2021
CZ08.12.2021
EE08.12.2021
ES08.12.2021
FI08.12.2021
HR08.12.2021
LT08.12.2021
LV08.12.2021
MC08.12.2021
PL08.12.2021
RO08.12.2021
RS08.12.2021
SE08.12.2021
SK08.12.2021
SM08.12.2021
BG08.03.2022
NO08.03.2022
GR09.03.2022
IS08.04.2022
PT08.04.2022
Former [2022/42]AT08.12.2021
CZ08.12.2021
EE08.12.2021
ES08.12.2021
FI08.12.2021
HR08.12.2021
LT08.12.2021
LV08.12.2021
PL08.12.2021
RO08.12.2021
RS08.12.2021
SE08.12.2021
SK08.12.2021
SM08.12.2021
BG08.03.2022
NO08.03.2022
GR09.03.2022
IS08.04.2022
PT08.04.2022
Former [2022/36]AT08.12.2021
CZ08.12.2021
EE08.12.2021
ES08.12.2021
FI08.12.2021
HR08.12.2021
LT08.12.2021
LV08.12.2021
PL08.12.2021
RO08.12.2021
RS08.12.2021
SE08.12.2021
SK08.12.2021
SM08.12.2021
BG08.03.2022
NO08.03.2022
GR09.03.2022
PT08.04.2022
Former [2022/35]CZ08.12.2021
EE08.12.2021
ES08.12.2021
FI08.12.2021
HR08.12.2021
LT08.12.2021
LV08.12.2021
RO08.12.2021
RS08.12.2021
SE08.12.2021
SK08.12.2021
SM08.12.2021
BG08.03.2022
NO08.03.2022
GR09.03.2022
PT08.04.2022
Former [2022/34]EE08.12.2021
ES08.12.2021
FI08.12.2021
HR08.12.2021
LT08.12.2021
LV08.12.2021
RO08.12.2021
RS08.12.2021
SE08.12.2021
SM08.12.2021
BG08.03.2022
NO08.03.2022
GR09.03.2022
PT08.04.2022
Former [2022/33]FI08.12.2021
HR08.12.2021
LT08.12.2021
LV08.12.2021
RS08.12.2021
SE08.12.2021
SM08.12.2021
BG08.03.2022
NO08.03.2022
GR09.03.2022
Former [2022/25]FI08.12.2021
HR08.12.2021
LT08.12.2021
LV08.12.2021
RS08.12.2021
SE08.12.2021
BG08.03.2022
NO08.03.2022
GR09.03.2022
Former [2022/24]FI08.12.2021
HR08.12.2021
LT08.12.2021
LV08.12.2021
RS08.12.2021
SE08.12.2021
BG08.03.2022
GR09.03.2022
Former [2022/22]FI08.12.2021
LT08.12.2021
RS08.12.2021
BG08.03.2022
Former [2022/21]RS08.12.2021
BG08.03.2022
Former [2022/19]BG08.03.2022
Cited inInternational search[XYI]WO2017210707  (DL MFG [US], et al) [X] 1,2,6,11,12,14-16 * paragraph [0006] * * paragraph [0023] - paragraph [0044] * * figures 1-7 * [Y] 3-5 [I] 7,17;
 [X]WO2016193398  (ESIDOCK LTD [IE]) [X] 1,2,9,12,14-16 * page 6, line 28 - page 11, line 11 * * figures 1-4 *;
 [X]IES86282  (MCR CONSORTIUM LTD [IE]) [X] 1,2,8,12-15 * page 18, line 16 - page 19, line 5 * * figure 8 *;
 [X]US4554768  (SRAJER REINHARD [US]) [X] 1,2,9,10,12-16,18,19 * column 2, line 49 - column 6, line 4 * * figures 1-6 *;
 [YA]EP2517990  (AMISERRU SL [ES]) [Y] 3 * paragraph [0047]; figure 7 * [A] 2;
 [Y]US2017190522  (OGG DALE A [US], et al) [Y] 3,5 * figures 11c, 11d *;
 [Y]US5442825  (HAHN NORBERT [US], et al) [Y] 3,4 * figures 3-8 *
by applicantUS9783378
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.