| EP3918148 - PANEL AND COVERING COMPRISING THE SAME [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 20.06.2024 Database last updated on 18.03.2026 | |
| Former | The patent has been granted Status updated on 14.07.2023 | ||
| Former | Grant of patent is intended Status updated on 27.02.2023 | ||
| Former | Request for examination was made Status updated on 05.11.2021 | ||
| Former | The international publication has been made Status updated on 08.08.2020 | ||
| Former | unknown Status updated on 11.05.2019 | Most recent event Tooltip | 26.12.2025 | Lapse of the patent in a contracting state New state(s): TR | published on 28.01.2026 [2026/05] | Applicant(s) | For all designated states I4F LICENSING NV Industriedijk 19 2300 Turnhout / BE | [2023/28] |
| Former [2021/49] | For all designated states I4F LICENSING NV Oude Watertorenstraat 25 3930 Hamont-Achel / BE | Inventor(s) | 01 /
PERRA, Antonio Giuseppe Ide Klaas Minlaan 17 1862 GD Bergen / NL | [2023/33] |
| Former [2021/49] | 01 /
PERRA, Antonio Giuseppe 1862 GD Bergen / NL | Representative(s) | Patentwerk B.V. P.O. Box 1514 5200 BN 's-Hertogenbosch / NL | [2021/49] | Application number, filing date | 19721154.3 | 30.01.2019 | [2021/49] | WO2019NL50057 | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2020159355 | Date: | 06.08.2020 | Language: | EN | [2020/32] | Type: | A1 Application with search report | No.: | EP3918148 | Date: | 08.12.2021 | Language: | EN | The application published by WIPO in one of the EPO official languages on 06.08.2020 takes the place of the publication of the European patent application. | [2021/49] | Type: | B1 Patent specification | No.: | EP3918148 | Date: | 16.08.2023 | Language: | EN | [2023/33] | Search report(s) | International search report - published on: | EP | 06.08.2020 | Classification | IPC: | E04F15/02, E04F15/04, E04F15/10 | [2021/49] | CPC: |
E04F15/02038 (EP,KR,US);
E04F13/0866 (US);
E04F13/0894 (US);
E04F13/10 (US);
E04F15/045 (EP);
E04F15/046 (EP,KR,US);
E04F15/10 (EP);
E04F15/107 (EP,KR,US);
E04F2201/01 (EP,KR,US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2021/49] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | 30.08.2021 | Title | German: | PLATTE UND ABDECKUNG DAMIT | [2021/49] | English: | PANEL AND COVERING COMPRISING THE SAME | [2021/49] | French: | PANNEAU ET REVÊTEMENT LE COMPRENANT | [2021/49] | Entry into regional phase | 30.08.2021 | National basic fee paid | 30.08.2021 | Designation fee(s) paid | 30.08.2021 | Examination fee paid | Examination procedure | 30.08.2021 | Examination requested [2021/49] | 30.08.2021 | Date on which the examining division has become responsible | 18.03.2022 | Amendment by applicant (claims and/or description) | 28.02.2023 | Communication of intention to grant the patent | 04.07.2023 | Fee for grant paid | 04.07.2023 | Fee for publishing/printing paid | 04.07.2023 | Receipt of the translation of the claim(s) | Opposition(s) | 17.05.2024 | No opposition filed within time limit [2024/30] | Fees paid | Renewal fee | 30.08.2021 | Renewal fee patent year 03 | 27.01.2022 | Renewal fee patent year 04 | 27.01.2023 | Renewal fee patent year 05 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | CY | 30.01.2019 | HU | 30.01.2019 | AT | 16.08.2023 | BG | 16.08.2023 | CZ | 16.08.2023 | DK | 16.08.2023 | EE | 16.08.2023 | ES | 16.08.2023 | FI | 16.08.2023 | HR | 16.08.2023 | IT | 16.08.2023 | LT | 16.08.2023 | LV | 16.08.2023 | MC | 16.08.2023 | PL | 16.08.2023 | RO | 16.08.2023 | RS | 16.08.2023 | SI | 16.08.2023 | SK | 16.08.2023 | SM | 16.08.2023 | TR | 16.08.2023 | NO | 16.11.2023 | GR | 17.11.2023 | IS | 16.12.2023 | PT | 18.12.2023 | IE | 30.01.2024 | LU | 30.01.2024 | CH | 31.01.2024 | [2026/05] |
| Former [2025/41] | CY | 30.01.2019 | |
| HU | 30.01.2019 | ||
| AT | 16.08.2023 | ||
| BG | 16.08.2023 | ||
| CZ | 16.08.2023 | ||
| DK | 16.08.2023 | ||
| EE | 16.08.2023 | ||
| ES | 16.08.2023 | ||
| FI | 16.08.2023 | ||
| HR | 16.08.2023 | ||
| IT | 16.08.2023 | ||
| LT | 16.08.2023 | ||
| LV | 16.08.2023 | ||
| MC | 16.08.2023 | ||
| PL | 16.08.2023 | ||
| RO | 16.08.2023 | ||
| RS | 16.08.2023 | ||
| SI | 16.08.2023 | ||
| SK | 16.08.2023 | ||
| SM | 16.08.2023 | ||
| NO | 16.11.2023 | ||
| GR | 17.11.2023 | ||
| IS | 16.12.2023 | ||
| PT | 18.12.2023 | ||
| IE | 30.01.2024 | ||
| LU | 30.01.2024 | ||
| CH | 31.01.2024 | ||
| Former [2025/37] | CY | 30.01.2019 | |
| AT | 16.08.2023 | ||
| BG | 16.08.2023 | ||
| CZ | 16.08.2023 | ||
| DK | 16.08.2023 | ||
| EE | 16.08.2023 | ||
| ES | 16.08.2023 | ||
| FI | 16.08.2023 | ||
| HR | 16.08.2023 | ||
| IT | 16.08.2023 | ||
| LT | 16.08.2023 | ||
| LV | 16.08.2023 | ||
| MC | 16.08.2023 | ||
| PL | 16.08.2023 | ||
| RO | 16.08.2023 | ||
| RS | 16.08.2023 | ||
| SI | 16.08.2023 | ||
| SK | 16.08.2023 | ||
| SM | 16.08.2023 | ||
| NO | 16.11.2023 | ||
| GR | 17.11.2023 | ||
| IS | 16.12.2023 | ||
| PT | 18.12.2023 | ||
| IE | 30.01.2024 | ||
| LU | 30.01.2024 | ||
| CH | 31.01.2024 | ||
| Former [2025/10] | AT | 16.08.2023 | |
| BG | 16.08.2023 | ||
| CZ | 16.08.2023 | ||
| DK | 16.08.2023 | ||
| EE | 16.08.2023 | ||
| ES | 16.08.2023 | ||
| FI | 16.08.2023 | ||
| HR | 16.08.2023 | ||
| IT | 16.08.2023 | ||
| LT | 16.08.2023 | ||
| LV | 16.08.2023 | ||
| MC | 16.08.2023 | ||
| PL | 16.08.2023 | ||
| RO | 16.08.2023 | ||
| RS | 16.08.2023 | ||
| SI | 16.08.2023 | ||
| SK | 16.08.2023 | ||
| SM | 16.08.2023 | ||
| NO | 16.11.2023 | ||
| GR | 17.11.2023 | ||
| IS | 16.12.2023 | ||
| PT | 18.12.2023 | ||
| IE | 30.01.2024 | ||
| LU | 30.01.2024 | ||
| CH | 31.01.2024 | ||
| Former [2024/51] | AT | 16.08.2023 | |
| BG | 16.08.2023 | ||
| CZ | 16.08.2023 | ||
| DK | 16.08.2023 | ||
| EE | 16.08.2023 | ||
| ES | 16.08.2023 | ||
| FI | 16.08.2023 | ||
| HR | 16.08.2023 | ||
| IT | 16.08.2023 | ||
| LT | 16.08.2023 | ||
| LV | 16.08.2023 | ||
| MC | 16.08.2023 | ||
| PL | 16.08.2023 | ||
| RO | 16.08.2023 | ||
| RS | 16.08.2023 | ||
| SI | 16.08.2023 | ||
| SK | 16.08.2023 | ||
| SM | 16.08.2023 | ||
| NO | 16.11.2023 | ||
| GR | 17.11.2023 | ||
| IS | 16.12.2023 | ||
| PT | 18.12.2023 | ||
| LU | 30.01.2024 | ||
| CH | 31.01.2024 | ||
| Former [2024/48] | AT | 16.08.2023 | |
| CZ | 16.08.2023 | ||
| DK | 16.08.2023 | ||
| EE | 16.08.2023 | ||
| ES | 16.08.2023 | ||
| FI | 16.08.2023 | ||
| HR | 16.08.2023 | ||
| IT | 16.08.2023 | ||
| LT | 16.08.2023 | ||
| LV | 16.08.2023 | ||
| MC | 16.08.2023 | ||
| PL | 16.08.2023 | ||
| RO | 16.08.2023 | ||
| RS | 16.08.2023 | ||
| SI | 16.08.2023 | ||
| SK | 16.08.2023 | ||
| SM | 16.08.2023 | ||
| NO | 16.11.2023 | ||
| GR | 17.11.2023 | ||
| IS | 16.12.2023 | ||
| PT | 18.12.2023 | ||
| LU | 30.01.2024 | ||
| CH | 31.01.2024 | ||
| Former [2024/43] | AT | 16.08.2023 | |
| CZ | 16.08.2023 | ||
| DK | 16.08.2023 | ||
| EE | 16.08.2023 | ||
| ES | 16.08.2023 | ||
| FI | 16.08.2023 | ||
| HR | 16.08.2023 | ||
| IT | 16.08.2023 | ||
| LT | 16.08.2023 | ||
| LV | 16.08.2023 | ||
| MC | 16.08.2023 | ||
| PL | 16.08.2023 | ||
| RO | 16.08.2023 | ||
| RS | 16.08.2023 | ||
| SI | 16.08.2023 | ||
| SK | 16.08.2023 | ||
| SM | 16.08.2023 | ||
| NO | 16.11.2023 | ||
| GR | 17.11.2023 | ||
| IS | 16.12.2023 | ||
| PT | 18.12.2023 | ||
| LU | 30.01.2024 | ||
| Former [2024/40] | AT | 16.08.2023 | |
| CZ | 16.08.2023 | ||
| DK | 16.08.2023 | ||
| EE | 16.08.2023 | ||
| ES | 16.08.2023 | ||
| FI | 16.08.2023 | ||
| HR | 16.08.2023 | ||
| IT | 16.08.2023 | ||
| LT | 16.08.2023 | ||
| LV | 16.08.2023 | ||
| MC | 16.08.2023 | ||
| PL | 16.08.2023 | ||
| RO | 16.08.2023 | ||
| RS | 16.08.2023 | ||
| SI | 16.08.2023 | ||
| SK | 16.08.2023 | ||
| SM | 16.08.2023 | ||
| NO | 16.11.2023 | ||
| GR | 17.11.2023 | ||
| IS | 16.12.2023 | ||
| PT | 18.12.2023 | ||
| Former [2024/36] | AT | 16.08.2023 | |
| CZ | 16.08.2023 | ||
| DK | 16.08.2023 | ||
| EE | 16.08.2023 | ||
| ES | 16.08.2023 | ||
| FI | 16.08.2023 | ||
| HR | 16.08.2023 | ||
| IT | 16.08.2023 | ||
| LT | 16.08.2023 | ||
| LV | 16.08.2023 | ||
| PL | 16.08.2023 | ||
| RO | 16.08.2023 | ||
| RS | 16.08.2023 | ||
| SI | 16.08.2023 | ||
| SK | 16.08.2023 | ||
| SM | 16.08.2023 | ||
| NO | 16.11.2023 | ||
| GR | 17.11.2023 | ||
| IS | 16.12.2023 | ||
| PT | 18.12.2023 | ||
| Former [2024/23] | AT | 16.08.2023 | |
| CZ | 16.08.2023 | ||
| DK | 16.08.2023 | ||
| EE | 16.08.2023 | ||
| ES | 16.08.2023 | ||
| FI | 16.08.2023 | ||
| HR | 16.08.2023 | ||
| LT | 16.08.2023 | ||
| LV | 16.08.2023 | ||
| PL | 16.08.2023 | ||
| RO | 16.08.2023 | ||
| RS | 16.08.2023 | ||
| SK | 16.08.2023 | ||
| SM | 16.08.2023 | ||
| NO | 16.11.2023 | ||
| GR | 17.11.2023 | ||
| IS | 16.12.2023 | ||
| PT | 18.12.2023 | ||
| Former [2024/22] | AT | 16.08.2023 | |
| CZ | 16.08.2023 | ||
| DK | 16.08.2023 | ||
| FI | 16.08.2023 | ||
| HR | 16.08.2023 | ||
| LT | 16.08.2023 | ||
| LV | 16.08.2023 | ||
| PL | 16.08.2023 | ||
| RO | 16.08.2023 | ||
| RS | 16.08.2023 | ||
| SM | 16.08.2023 | ||
| NO | 16.11.2023 | ||
| GR | 17.11.2023 | ||
| IS | 16.12.2023 | ||
| PT | 18.12.2023 | ||
| Former [2024/20] | AT | 16.08.2023 | |
| FI | 16.08.2023 | ||
| HR | 16.08.2023 | ||
| LT | 16.08.2023 | ||
| LV | 16.08.2023 | ||
| PL | 16.08.2023 | ||
| RS | 16.08.2023 | ||
| SM | 16.08.2023 | ||
| NO | 16.11.2023 | ||
| GR | 17.11.2023 | ||
| IS | 16.12.2023 | ||
| PT | 18.12.2023 | ||
| Former [2024/10] | AT | 16.08.2023 | |
| FI | 16.08.2023 | ||
| HR | 16.08.2023 | ||
| LT | 16.08.2023 | ||
| LV | 16.08.2023 | ||
| PL | 16.08.2023 | ||
| RS | 16.08.2023 | ||
| NO | 16.11.2023 | ||
| GR | 17.11.2023 | ||
| IS | 16.12.2023 | ||
| PT | 18.12.2023 | ||
| Former [2024/09] | AT | 16.08.2023 | |
| FI | 16.08.2023 | ||
| LT | 16.08.2023 | ||
| NO | 16.11.2023 | ||
| GR | 17.11.2023 | ||
| IS | 16.12.2023 | ||
| Former [2024/08] | LT | 16.08.2023 | |
| NO | 16.11.2023 | ||
| GR | 17.11.2023 | Cited in | International search | [XA] US4426820 (TERBRACK HEINZ et al.) | [XA] WO2016105266 (CERALOC INNOVATION AB et al.) [X] 1-5,20-24 * figures 11-13 *[A] 6-19 | [A] US3694983 (COUQUET PIERRE JEAN et al.) [A] 1-24 * figure 26b * | [A] US2011265409 (PIEN CHAO KANG et al.) [A] 1-24 * figures 1-3 * | [A] EP2440724 (4SIGHT INNOVATION BV et al.) [A] 1-24 * figures 19-20 * | by applicant | EP2440724 |