Extract from the Register of European Patents

EP About this file: EP3788194

EP3788194 - UPPER FOR AN ARTICLE OF FOOTWEAR WITH A LATTICE STRUCTURE [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  26.01.2024
Database last updated on 08.04.2026
FormerThe patent has been granted
Status updated on  17.02.2023
FormerGrant of patent is intended
Status updated on  06.10.2022
FormerRequest for examination was made
Status updated on  05.02.2021
FormerThe international publication has been made
Status updated on  08.11.2019
Formerunknown
Status updated on  15.05.2019
Most recent event   Tooltip26.12.2025Lapse of the patent in a contracting state
New state(s): TR
published on 28.01.2026  [2026/05]
Applicant(s)For all designated states
Nike Innovate C.V.
One Bowerman Drive
Beaverton, OR 97005 / US
[2021/10]
Inventor(s)01 / POULSEN, Monica M.
c/o Nike, Inc. One Bowerman Drive
Beaverton, OR 97005-6453 / US
02 / STEVENS, Erin C.
c/o Nike, Inc. One Bowerman Drive
Beaverton, OR 97005-6453 / US
 [2021/10]
Representative(s)Prinz & Partner mbB
Patent- und Rechtsanwälte
Rundfunkplatz 2
80335 München / DE
[2021/10]
Application number, filing date19722467.826.04.2019
[2021/10]
WO2019US29435
Priority number, dateUS201862664483P30.04.2018         Original published format: US 201862664483 P
[2021/10]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2019212904
Date:07.11.2019
Language:EN
[2019/45]
Type: A1 Application with search report 
No.:EP3788194
Date:10.03.2021
Language:EN
The application published by WIPO in one of the EPO official languages on 07.11.2019 takes the place of the publication of the European patent application.
[2021/10]
Type: B1 Patent specification 
No.:EP3788194
Date:22.03.2023
Language:EN
[2023/12]
Search report(s)International search report - published on:EP07.11.2019
ClassificationIPC:D04B1/10, A43B1/04
[2021/10]
CPC:
A43B1/04 (EP,CN,US); D04B1/104 (EP,CN,US); A43B1/028 (EP,CN);
A43B23/0235 (EP,CN); A43B23/0265 (EP,CN); A43B23/0295 (EP,CN);
D04B1/106 (EP,CN); D04B1/12 (CN,US); D10B2501/043 (EP,CN) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2021/10]
Extension statesBANot yet paid
MENot yet paid
Validation statesKHNot yet paid
MANot yet paid
MDNot yet paid
TNNot yet paid
TitleGerman:SCHUHOBERTEIL FÜR EINE FUSSBEKLEIDUNG MIT EINER GITTERSTRUKTUR[2022/42]
English:UPPER FOR AN ARTICLE OF FOOTWEAR WITH A LATTICE STRUCTURE[2021/10]
French:EMPEIGNE DE CHAUSSURE POUR UN VÊTEMENT DE PIED AYANT UNE STRUCTURE DE FILET[2022/42]
Former [2021/10]OBERMATERIAL FÜR SCHUH MIT GITTERSTRUKTUR
Former [2021/10]TIGE POUR UN ARTICLE CHAUSSANT AYANT UNE STRUCTURE EN TREILLIS
Entry into regional phase30.11.2020National basic fee paid 
30.11.2020Designation fee(s) paid 
30.11.2020Examination fee paid 
Examination procedure30.11.2020Examination requested  [2021/10]
30.11.2020Date on which the examining division has become responsible
26.05.2021Amendment by applicant (claims and/or description)
07.10.2022Communication of intention to grant the patent
08.02.2023Fee for grant paid
08.02.2023Fee for publishing/printing paid
08.02.2023Receipt of the translation of the claim(s)
Divisional application(s)EP23163173.0  / EP4234781
Opposition(s)02.01.2024No opposition filed within time limit [2024/09]
Fees paidRenewal fee
15.04.2021Renewal fee patent year 03
14.03.2022Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipCY26.04.2019
HU26.04.2019
AT22.03.2023
BG22.03.2023
CZ22.03.2023
DK22.03.2023
EE22.03.2023
ES22.03.2023
FI22.03.2023
HR22.03.2023
IT22.03.2023
LT22.03.2023
LV22.03.2023
MC22.03.2023
NL22.03.2023
PL22.03.2023
RO22.03.2023
RS22.03.2023
SE22.03.2023
SI22.03.2023
SK22.03.2023
SM22.03.2023
TR22.03.2023
IE26.04.2023
LU26.04.2023
BE30.04.2023
CH30.04.2023
LI30.04.2023
NO22.06.2023
GR23.06.2023
IS22.07.2023
PT24.07.2023
[2026/05]
Former [2025/39]CY26.04.2019
HU26.04.2019
AT22.03.2023
BG22.03.2023
CZ22.03.2023
DK22.03.2023
EE22.03.2023
ES22.03.2023
FI22.03.2023
HR22.03.2023
IT22.03.2023
LT22.03.2023
LV22.03.2023
MC22.03.2023
NL22.03.2023
PL22.03.2023
RO22.03.2023
RS22.03.2023
SE22.03.2023
SI22.03.2023
SK22.03.2023
SM22.03.2023
IE26.04.2023
LU26.04.2023
BE30.04.2023
CH30.04.2023
LI30.04.2023
NO22.06.2023
GR23.06.2023
IS22.07.2023
PT24.07.2023
Former [2025/36]CY26.04.2019
AT22.03.2023
BG22.03.2023
CZ22.03.2023
DK22.03.2023
EE22.03.2023
ES22.03.2023
FI22.03.2023
HR22.03.2023
IT22.03.2023
LT22.03.2023
LV22.03.2023
MC22.03.2023
NL22.03.2023
PL22.03.2023
RO22.03.2023
RS22.03.2023
SE22.03.2023
SI22.03.2023
SK22.03.2023
SM22.03.2023
IE26.04.2023
LU26.04.2023
BE30.04.2023
CH30.04.2023
LI30.04.2023
NO22.06.2023
GR23.06.2023
IS22.07.2023
PT24.07.2023
Former [2024/51]AT22.03.2023
BG22.03.2023
CZ22.03.2023
DK22.03.2023
EE22.03.2023
ES22.03.2023
FI22.03.2023
HR22.03.2023
IT22.03.2023
LT22.03.2023
LV22.03.2023
MC22.03.2023
NL22.03.2023
PL22.03.2023
RO22.03.2023
RS22.03.2023
SE22.03.2023
SI22.03.2023
SK22.03.2023
SM22.03.2023
IE26.04.2023
LU26.04.2023
BE30.04.2023
CH30.04.2023
LI30.04.2023
NO22.06.2023
GR23.06.2023
IS22.07.2023
PT24.07.2023
Former [2024/26]AT22.03.2023
CZ22.03.2023
DK22.03.2023
EE22.03.2023
ES22.03.2023
FI22.03.2023
HR22.03.2023
IT22.03.2023
LT22.03.2023
LV22.03.2023
MC22.03.2023
NL22.03.2023
PL22.03.2023
RO22.03.2023
RS22.03.2023
SE22.03.2023
SI22.03.2023
SK22.03.2023
SM22.03.2023
IE26.04.2023
LU26.04.2023
BE30.04.2023
CH30.04.2023
LI30.04.2023
NO22.06.2023
GR23.06.2023
IS22.07.2023
PT24.07.2023
Former [2024/21]AT22.03.2023
CZ22.03.2023
DK22.03.2023
EE22.03.2023
ES22.03.2023
FI22.03.2023
HR22.03.2023
LT22.03.2023
LV22.03.2023
MC22.03.2023
NL22.03.2023
PL22.03.2023
RO22.03.2023
RS22.03.2023
SE22.03.2023
SI22.03.2023
SK22.03.2023
SM22.03.2023
IE26.04.2023
LU26.04.2023
BE30.04.2023
CH30.04.2023
LI30.04.2023
NO22.06.2023
GR23.06.2023
IS22.07.2023
PT24.07.2023
Former [2024/10]AT22.03.2023
CZ22.03.2023
DK22.03.2023
EE22.03.2023
ES22.03.2023
FI22.03.2023
HR22.03.2023
LT22.03.2023
LV22.03.2023
MC22.03.2023
NL22.03.2023
PL22.03.2023
RO22.03.2023
RS22.03.2023
SE22.03.2023
SI22.03.2023
SK22.03.2023
SM22.03.2023
LU26.04.2023
BE30.04.2023
CH30.04.2023
LI30.04.2023
NO22.06.2023
GR23.06.2023
IS22.07.2023
PT24.07.2023
Former [2024/09]AT22.03.2023
CZ22.03.2023
DK22.03.2023
EE22.03.2023
ES22.03.2023
FI22.03.2023
HR22.03.2023
LT22.03.2023
LV22.03.2023
MC22.03.2023
NL22.03.2023
PL22.03.2023
RO22.03.2023
RS22.03.2023
SE22.03.2023
SK22.03.2023
SM22.03.2023
LU26.04.2023
CH30.04.2023
LI30.04.2023
NO22.06.2023
GR23.06.2023
IS22.07.2023
PT24.07.2023
Former [2024/08]AT22.03.2023
EE22.03.2023
ES22.03.2023
FI22.03.2023
HR22.03.2023
LT22.03.2023
LV22.03.2023
MC22.03.2023
NL22.03.2023
PL22.03.2023
RO22.03.2023
RS22.03.2023
SE22.03.2023
SK22.03.2023
SM22.03.2023
LU26.04.2023
NO22.06.2023
GR23.06.2023
IS22.07.2023
PT24.07.2023
Former [2024/04]AT22.03.2023
EE22.03.2023
ES22.03.2023
FI22.03.2023
HR22.03.2023
LT22.03.2023
LV22.03.2023
NL22.03.2023
PL22.03.2023
RO22.03.2023
RS22.03.2023
SE22.03.2023
SK22.03.2023
SM22.03.2023
LU26.04.2023
NO22.06.2023
GR23.06.2023
IS22.07.2023
PT24.07.2023
Former [2023/50]AT22.03.2023
EE22.03.2023
ES22.03.2023
FI22.03.2023
HR22.03.2023
LT22.03.2023
LV22.03.2023
NL22.03.2023
PL22.03.2023
RO22.03.2023
RS22.03.2023
SE22.03.2023
SK22.03.2023
SM22.03.2023
NO22.06.2023
GR23.06.2023
IS22.07.2023
PT24.07.2023
Former [2023/49]AT22.03.2023
EE22.03.2023
ES22.03.2023
FI22.03.2023
HR22.03.2023
LT22.03.2023
LV22.03.2023
NL22.03.2023
RO22.03.2023
RS22.03.2023
SE22.03.2023
SM22.03.2023
NO22.06.2023
GR23.06.2023
PT24.07.2023
Former [2023/48]AT22.03.2023
EE22.03.2023
ES22.03.2023
FI22.03.2023
HR22.03.2023
LT22.03.2023
LV22.03.2023
NL22.03.2023
RS22.03.2023
SE22.03.2023
SM22.03.2023
NO22.06.2023
GR23.06.2023
PT24.07.2023
Former [2023/46]ES22.03.2023
FI22.03.2023
HR22.03.2023
LT22.03.2023
LV22.03.2023
NL22.03.2023
RS22.03.2023
SE22.03.2023
SM22.03.2023
NO22.06.2023
GR23.06.2023
PT24.07.2023
Former [2023/38]FI22.03.2023
HR22.03.2023
LT22.03.2023
LV22.03.2023
NL22.03.2023
RS22.03.2023
SE22.03.2023
NO22.06.2023
GR23.06.2023
Former [2023/37]FI22.03.2023
HR22.03.2023
LT22.03.2023
LV22.03.2023
RS22.03.2023
SE22.03.2023
NO22.06.2023
GR23.06.2023
Former [2023/36]FI22.03.2023
HR22.03.2023
LT22.03.2023
LV22.03.2023
RS22.03.2023
SE22.03.2023
NO22.06.2023
Former [2023/35]HR22.03.2023
LT22.03.2023
RS22.03.2023
NO22.06.2023
Former [2023/34]LT22.03.2023
RS22.03.2023
Former [2023/33]LT22.03.2023
Cited inInternational search[YA] WO2016187128  (NIKE INNOVATE CV et al.) [Y] 1-6,8 * page 7, line 15 - page 20, line 25; figures 1-8; claims 10, 11, 24, 25 *[A] 7
 [Y] US2017311672  (HIPP STEPHEN J et al.) [Y] 1-6,8 * sentences 17-19, paragraph 0080; figure 16 *
 [Y] WO2018031616  (NIKE INNOVATE CV et al.) [Y] 1 * page 9, lines 9-16 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.