blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3807984

EP3807984 - METHOD FOR CONTROLLING A VIENNA RECTIFIER [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  09.06.2023
Database last updated on 06.07.2024
FormerThe patent has been granted
Status updated on  01.07.2022
FormerGrant of patent is intended
Status updated on  25.02.2022
FormerRequest for examination was made
Status updated on  15.02.2022
FormerGrant of patent is intended
Status updated on  13.10.2021
FormerRequest for examination was made
Status updated on  19.03.2021
FormerThe international publication has been made
Status updated on  21.12.2019
Formerunknown
Status updated on  04.06.2019
Most recent event   Tooltip24.05.2024Lapse of the patent in a contracting state
New state(s): IT
published on 26.06.2024  [2024/26]
Applicant(s)For all designated states
Renault s.a.s
122-122 bis avenue du Général Leclerc
92100 Boulogne Billancourt / FR
For:AL  AT  BG  CH  CZ  DE  DK  EE  ES  FI  GB  HR  HU  IS  LI  LU  MK  NO  PL  PT  RO  RS  SE  SK  SM  TR 
NISSAN MOTOR CO., LTD.
2 Takara-cho
Kanagawa-ku
Yokohama-shi, Kanagawa 221-0023 / JP
[2022/30]
Former [2022/09]For all designated states
Renault s.a.s
13/15, quai Alphonse Le Gallo
92100 Boulogne Billancourt / FR
For:AL  AT  BG  CH  CZ  DE  DK  EE  ES  FI  GB  HR  HU  IS  LI  LU  MK  NO  PL  PT  RO  RS  SE  SK  SM  TR 
NISSAN MOTOR CO., LTD.
2 Takara-cho
Kanagawa-ku
Yokohama-shi, Kanagawa 221-0023 / JP
Former [2021/16]For all designated states
RENAULT s.a.s.
13-15 Quai Le Gallo
92100 Boulogne-Billancourt / FR
For:AL  AT  BG  CH  CZ  DE  DK  EE  ES  FI  GB  HR  HU  IS  LI  LU  MK  NO  PL  PT  RO  RS  SE  SK  SM  TR 
NISSAN MOTOR CO., LTD.
2 Takara-cho
Kanagawa-ku
Yokohama-shi, Kanagawa 221-0023 / JP
Inventor(s)01 / KOTEICH, Mohamad
3 passage du villevert
91440 Bures sur yvette / FR
02 / SAKR, Nadim
35 rue Baunier
75014 Paris / FR
03 / ROUHANA, Najib
10 rue Magellan
91300 Massy / FR
 [2021/16]
Representative(s)Renault Group
Renault s.a.s.
1 avenue du Golf
FR TCR AVA 055
78084 Guyancourt Cedex / FR
[N/P]
Former [2022/31]Renault Group
Renault s.a.s.
API : TCR GRA 2 36
1, Avenue du Golf
78084 Guyancourt Cedex / FR
Former [2021/16]Urbillac, Chantal Corinne Annie
RENAULT s.a.s.
Sce 00267 - TCR GRA 2 36
1 avenue du Golf
78084 Guyancourt Cedex / FR
Application number, filing date19726412.027.05.2019
[2021/16]
WO2019EP63686
Priority number, dateFR2018005528515.06.2018         Original published format: FR 1855285
[2021/16]
Filing languageFR
Procedural languageFR
PublicationType: A1 Application with search report
No.:WO2019238404
Date:19.12.2019
Language:FR
[2019/51]
Type: A1 Application with search report 
No.:EP3807984
Date:21.04.2021
Language:FR
The application published by WIPO in one of the EPO official languages on 19.12.2019 takes the place of the publication of the European patent application.
[2021/16]
Type: B1 Patent specification 
No.:EP3807984
Date:03.08.2022
Language:FR
[2022/31]
Search report(s)International search report - published on:EP19.12.2019
ClassificationIPC:H02M1/42, H02M7/219
[2021/16]
CPC:
H02M1/4208 (EP,US); H02M1/0085 (US); H02M1/12 (US);
H02M1/4216 (EP,US); H02M1/4233 (EP,US); H02M7/219 (EP,US);
Y02B70/10 (EP); Y02T10/70 (EP); Y02T10/7072 (EP) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2021/16]
Extension statesBANot yet paid
MENot yet paid
Validation statesKHNot yet paid
MANot yet paid
MDNot yet paid
TNNot yet paid
TitleGerman:VERFAHREN ZUR STEUERUNG EINES VIENNA-GLEICHRICHTERS[2021/16]
English:METHOD FOR CONTROLLING A VIENNA RECTIFIER[2021/16]
French:PROCÉDÉ DE COMMANDE D'UN REDRESSEUR DE VIENNE[2021/16]
Entry into regional phase10.12.2020National basic fee paid 
10.12.2020Designation fee(s) paid 
10.12.2020Examination fee paid 
Examination procedure10.12.2020Examination requested  [2021/16]
10.12.2020Date on which the examining division has become responsible
14.10.2021Communication of intention to grant the patent
15.02.2022Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO
04.03.2022Communication of intention to grant the patent
24.06.2022Fee for grant paid
24.06.2022Fee for publishing/printing paid
24.06.2022Receipt of the translation of the claim(s)
Opposition(s)04.05.2023No opposition filed within time limit [2023/28]
Fees paidRenewal fee
10.12.2020Renewal fee patent year 03
25.05.2022Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipAL03.08.2022
AT03.08.2022
CZ03.08.2022
DK03.08.2022
EE03.08.2022
ES03.08.2022
FI03.08.2022
HR03.08.2022
IT03.08.2022
LT03.08.2022
LV03.08.2022
MC03.08.2022
NL03.08.2022
PL03.08.2022
RO03.08.2022
RS03.08.2022
SE03.08.2022
SI03.08.2022
SK03.08.2022
SM03.08.2022
NO03.11.2022
GR04.11.2022
IS03.12.2022
PT05.12.2022
[2024/26]
Former [2024/08]AL03.08.2022
AT03.08.2022
CZ03.08.2022
DK03.08.2022
EE03.08.2022
ES03.08.2022
FI03.08.2022
HR03.08.2022
LT03.08.2022
LV03.08.2022
MC03.08.2022
NL03.08.2022
PL03.08.2022
RO03.08.2022
RS03.08.2022
SE03.08.2022
SI03.08.2022
SK03.08.2022
SM03.08.2022
NO03.11.2022
GR04.11.2022
IS03.12.2022
PT05.12.2022
Former [2023/37]AL03.08.2022
AT03.08.2022
CZ03.08.2022
DK03.08.2022
EE03.08.2022
ES03.08.2022
FI03.08.2022
HR03.08.2022
LT03.08.2022
LV03.08.2022
NL03.08.2022
PL03.08.2022
RO03.08.2022
RS03.08.2022
SE03.08.2022
SI03.08.2022
SK03.08.2022
SM03.08.2022
NO03.11.2022
GR04.11.2022
IS03.12.2022
PT05.12.2022
Former [2023/29]AL03.08.2022
AT03.08.2022
CZ03.08.2022
DK03.08.2022
EE03.08.2022
ES03.08.2022
FI03.08.2022
HR03.08.2022
LT03.08.2022
LV03.08.2022
NL03.08.2022
PL03.08.2022
RO03.08.2022
RS03.08.2022
SE03.08.2022
SK03.08.2022
SM03.08.2022
NO03.11.2022
GR04.11.2022
IS03.12.2022
PT05.12.2022
Former [2023/23]AT03.08.2022
CZ03.08.2022
DK03.08.2022
EE03.08.2022
ES03.08.2022
FI03.08.2022
HR03.08.2022
LT03.08.2022
LV03.08.2022
NL03.08.2022
PL03.08.2022
RO03.08.2022
RS03.08.2022
SE03.08.2022
SK03.08.2022
SM03.08.2022
NO03.11.2022
GR04.11.2022
IS03.12.2022
PT05.12.2022
Former [2023/22]AT03.08.2022
CZ03.08.2022
DK03.08.2022
ES03.08.2022
FI03.08.2022
HR03.08.2022
LT03.08.2022
LV03.08.2022
NL03.08.2022
PL03.08.2022
RO03.08.2022
RS03.08.2022
SE03.08.2022
SM03.08.2022
NO03.11.2022
GR04.11.2022
IS03.12.2022
PT05.12.2022
Former [2023/21]DK03.08.2022
ES03.08.2022
FI03.08.2022
HR03.08.2022
LT03.08.2022
LV03.08.2022
NL03.08.2022
PL03.08.2022
RS03.08.2022
SE03.08.2022
SM03.08.2022
NO03.11.2022
GR04.11.2022
IS03.12.2022
PT05.12.2022
Former [2023/20]ES03.08.2022
FI03.08.2022
HR03.08.2022
LT03.08.2022
LV03.08.2022
NL03.08.2022
PL03.08.2022
RS03.08.2022
SE03.08.2022
SM03.08.2022
NO03.11.2022
GR04.11.2022
IS03.12.2022
PT05.12.2022
Former [2023/12]ES03.08.2022
FI03.08.2022
HR03.08.2022
LT03.08.2022
LV03.08.2022
NL03.08.2022
PL03.08.2022
RS03.08.2022
SE03.08.2022
NO03.11.2022
GR04.11.2022
IS03.12.2022
PT05.12.2022
Former [2023/11]ES03.08.2022
FI03.08.2022
HR03.08.2022
LT03.08.2022
LV03.08.2022
NL03.08.2022
PL03.08.2022
RS03.08.2022
SE03.08.2022
NO03.11.2022
GR04.11.2022
PT05.12.2022
Former [2023/10]ES03.08.2022
FI03.08.2022
HR03.08.2022
LT03.08.2022
LV03.08.2022
NL03.08.2022
RS03.08.2022
SE03.08.2022
NO03.11.2022
GR04.11.2022
PT05.12.2022
Former [2023/09]ES03.08.2022
FI03.08.2022
LT03.08.2022
LV03.08.2022
NL03.08.2022
RS03.08.2022
SE03.08.2022
NO03.11.2022
PT05.12.2022
Former [2023/08]ES03.08.2022
FI03.08.2022
LT03.08.2022
NL03.08.2022
RS03.08.2022
SE03.08.2022
NO03.11.2022
Cited inInternational search[A]  - MING ZHANG ET AL, "A Novel Strategy for Three-Phase/Switch/Level (Vienna) Rectifier Under Severe Unbalanced Grids", IEEE TRANSACTIONS ON INDUSTRIAL ELECTRONICS, IEEE SERVICE CENTER, PISCATAWAY, NJ, USA, (20131001), vol. 60, no. 10, doi:10.1109/TIE.2012.2217721, ISSN 0278-0046, pages 4243 - 4252, XP011510491 [A] 1-10 * page 4248 - page 4249; figures 1,10 *

DOI:   http://dx.doi.org/10.1109/TIE.2012.2217721
 [A]  - LIU SENSEN ET AL, "A novel strategy for vienna-type rectifier with light unbalanced input voltage", 2013 IEEE ENERGY CONVERSION CONGRESS AND EXPOSITION, IEEE, (20130915), doi:10.1109/ECCE.2013.6647268, pages 4253 - 4257, XP032516359 [A] 1-10 * the whole document *

DOI:   http://dx.doi.org/10.1109/ECCE.2013.6647268
by applicantEP2461469
 KR101250454B
 CN103187887
 CN103227575
 US8971068
 CN104811061
 FR3056851
 EP19940120245
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.