blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3808075

EP3808075 - PROXIMAL MONITORING DEVICE [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  07.04.2023
Database last updated on 09.07.2024
FormerThe patent has been granted
Status updated on  29.04.2022
FormerGrant of patent is intended
Status updated on  01.02.2022
FormerRequest for examination was made
Status updated on  19.03.2021
FormerThe international publication has been made
Status updated on  21.12.2019
Formerunknown
Status updated on  21.06.2019
Most recent event   Tooltip14.06.2024Lapse of the patent in a contracting state
New state(s): TR
published on 17.07.2024 [2024/29]
Applicant(s)For all designated states
Safran Electronics & Defense
72-76, rue Henry Farman
75015 Paris / FR
[2021/16]
Inventor(s)01 / DAVENEL, Arnaud
77550 Moissy-Cramayel / FR
02 / TOULON, Bruno
77550 Moissy-Cramayel / FR
03 / OLLAGNIER, Cédric
77550 Moissy-Cramayel / FR
04 / VIAL, Sébastien
77550 Moissy-Cramayel / FR
 [2022/22]
Former [2021/16]01 / DAVENEL, Arnaud
c/o SAFRAN ELECTRONICS & DEFENSE
72-76 rue Henry Farman
75015 Paris / FR
02 / TOULON, Bruno
c/o SAFRAN ELECTRONICS & DEFENSE
72-76 rue Henry Farman
75015 Paris / FR
03 / OLLAGNIER, Cédric
c/o SAFRAN ELECTRONICS & DEFENSE
72-76 rue Henry Farman
75015 Paris / FR
04 / VIAL, Sébastien
c/o SAFRAN ELECTRONICS & DEFENSE
72-76 rue Henry Farman
75015 Paris / FR
Representative(s)Lavialle, Bruno François Stéphane, et al
Cabinet Boettcher
5 rue de Vienne
75008 Paris / FR
[N/P]
Former [2021/16]Lavialle, Bruno François Stéphane, et al
Cabinet Boettcher
16, rue Médéric
75017 Paris / FR
Application number, filing date19729773.214.06.2019
[2021/16]
WO2019EP65749
Priority number, dateFR2018000062215.06.2018         Original published format: FR 1800622
[2021/16]
Filing languageFR
Procedural languageFR
PublicationType: A1 Application with search report
No.:WO2019238949
Date:19.12.2019
Language:FR
[2019/51]
Type: A1 Application with search report 
No.:EP3808075
Date:21.04.2021
Language:FR
The application published by WIPO in one of the EPO official languages on 19.12.2019 takes the place of the publication of the European patent application.
[2021/16]
Type: B1 Patent specification 
No.:EP3808075
Date:01.06.2022
Language:FR
[2022/22]
Search report(s)International search report - published on:EP19.12.2019
ClassificationIPC:H04N7/18, B60R1/00, G02B26/10, G03B37/04, H04N5/225, H04N5/247
[2021/16]
CPC:
H04N7/181 (EP,IL,US); H04N23/51 (EP,IL,US); G02B26/10 (EP,IL);
G03B37/04 (EP,IL); H04N23/45 (EP,IL,US); H04N23/695 (EP,IL);
H04N23/90 (EP,IL); B60R2300/102 (EP,IL); B60R25/305 (US);
G02B7/1805 (US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2021/16]
Extension statesBANot yet paid
MENot yet paid
Validation statesKHNot yet paid
MANot yet paid
MDNot yet paid
TNNot yet paid
TitleGerman:PROXIMALE ÜBERWACHUNGSVORRICHTUNG[2021/16]
English:PROXIMAL MONITORING DEVICE[2021/16]
French:DISPOSITIF DE VEILLE PROXIMALE[2021/16]
Entry into regional phase18.11.2020National basic fee paid 
18.11.2020Designation fee(s) paid 
18.11.2020Examination fee paid 
Examination procedure18.11.2020Examination requested  [2021/16]
18.11.2020Date on which the examining division has become responsible
02.02.2022Communication of intention to grant the patent
25.04.2022Fee for grant paid
25.04.2022Fee for publishing/printing paid
25.04.2022Receipt of the translation of the claim(s)
Opposition(s)02.03.2023No opposition filed within time limit [2023/19]
Fees paidRenewal fee
23.06.2021Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU14.06.2019
AL01.06.2022
AT01.06.2022
CY01.06.2022
CZ01.06.2022
DK01.06.2022
EE01.06.2022
ES01.06.2022
FI01.06.2022
HR01.06.2022
LT01.06.2022
LV01.06.2022
MC01.06.2022
MK01.06.2022
NL01.06.2022
PL01.06.2022
RO01.06.2022
RS01.06.2022
SE01.06.2022
SI01.06.2022
SK01.06.2022
SM01.06.2022
TR01.06.2022
IE14.06.2022
LU14.06.2022
BE30.06.2022
CH30.06.2022
LI30.06.2022
FR01.08.2022
BG01.09.2022
NO01.09.2022
GR02.09.2022
IS01.10.2022
PT03.10.2022
[2024/29]
Former [2024/25]HU14.06.2019
AL01.06.2022
AT01.06.2022
CY01.06.2022
CZ01.06.2022
DK01.06.2022
EE01.06.2022
ES01.06.2022
FI01.06.2022
HR01.06.2022
LT01.06.2022
LV01.06.2022
MC01.06.2022
MK01.06.2022
NL01.06.2022
PL01.06.2022
RO01.06.2022
RS01.06.2022
SE01.06.2022
SI01.06.2022
SK01.06.2022
SM01.06.2022
IE14.06.2022
LU14.06.2022
BE30.06.2022
CH30.06.2022
LI30.06.2022
FR01.08.2022
BG01.09.2022
NO01.09.2022
GR02.09.2022
IS01.10.2022
PT03.10.2022
Former [2024/23]AL01.06.2022
AT01.06.2022
CY01.06.2022
CZ01.06.2022
DK01.06.2022
EE01.06.2022
ES01.06.2022
FI01.06.2022
HR01.06.2022
LT01.06.2022
LV01.06.2022
MC01.06.2022
MK01.06.2022
NL01.06.2022
PL01.06.2022
RO01.06.2022
RS01.06.2022
SE01.06.2022
SI01.06.2022
SK01.06.2022
SM01.06.2022
IE14.06.2022
LU14.06.2022
BE30.06.2022
CH30.06.2022
LI30.06.2022
FR01.08.2022
BG01.09.2022
NO01.09.2022
GR02.09.2022
IS01.10.2022
PT03.10.2022
Former [2024/20]AL01.06.2022
AT01.06.2022
CY01.06.2022
CZ01.06.2022
DK01.06.2022
EE01.06.2022
ES01.06.2022
FI01.06.2022
HR01.06.2022
LT01.06.2022
LV01.06.2022
MC01.06.2022
NL01.06.2022
PL01.06.2022
RO01.06.2022
RS01.06.2022
SE01.06.2022
SI01.06.2022
SK01.06.2022
SM01.06.2022
IE14.06.2022
LU14.06.2022
BE30.06.2022
CH30.06.2022
LI30.06.2022
FR01.08.2022
BG01.09.2022
NO01.09.2022
GR02.09.2022
IS01.10.2022
PT03.10.2022
Former [2023/25]AL01.06.2022
AT01.06.2022
CZ01.06.2022
DK01.06.2022
EE01.06.2022
ES01.06.2022
FI01.06.2022
HR01.06.2022
LT01.06.2022
LV01.06.2022
MC01.06.2022
NL01.06.2022
PL01.06.2022
RO01.06.2022
RS01.06.2022
SE01.06.2022
SI01.06.2022
SK01.06.2022
SM01.06.2022
IE14.06.2022
LU14.06.2022
BE30.06.2022
CH30.06.2022
LI30.06.2022
FR01.08.2022
BG01.09.2022
NO01.09.2022
GR02.09.2022
IS01.10.2022
PT03.10.2022
Former [2023/22]AL01.06.2022
AT01.06.2022
CZ01.06.2022
DK01.06.2022
EE01.06.2022
ES01.06.2022
FI01.06.2022
HR01.06.2022
LT01.06.2022
LV01.06.2022
MC01.06.2022
NL01.06.2022
PL01.06.2022
RO01.06.2022
RS01.06.2022
SE01.06.2022
SK01.06.2022
SM01.06.2022
IE14.06.2022
LU14.06.2022
CH30.06.2022
LI30.06.2022
FR01.08.2022
BG01.09.2022
NO01.09.2022
GR02.09.2022
IS01.10.2022
PT03.10.2022
Former [2023/21]AL01.06.2022
AT01.06.2022
CZ01.06.2022
DK01.06.2022
EE01.06.2022
ES01.06.2022
FI01.06.2022
HR01.06.2022
LT01.06.2022
LV01.06.2022
MC01.06.2022
NL01.06.2022
PL01.06.2022
RO01.06.2022
RS01.06.2022
SE01.06.2022
SK01.06.2022
SM01.06.2022
IE14.06.2022
LU14.06.2022
CH30.06.2022
LI30.06.2022
BG01.09.2022
NO01.09.2022
GR02.09.2022
IS01.10.2022
PT03.10.2022
Former [2023/20]AL01.06.2022
AT01.06.2022
CZ01.06.2022
EE01.06.2022
ES01.06.2022
FI01.06.2022
HR01.06.2022
LT01.06.2022
LV01.06.2022
MC01.06.2022
NL01.06.2022
PL01.06.2022
RO01.06.2022
RS01.06.2022
SE01.06.2022
SK01.06.2022
SM01.06.2022
IE14.06.2022
BG01.09.2022
NO01.09.2022
GR02.09.2022
IS01.10.2022
PT03.10.2022
Former [2023/17]AL01.06.2022
AT01.06.2022
CZ01.06.2022
EE01.06.2022
ES01.06.2022
FI01.06.2022
HR01.06.2022
LT01.06.2022
LV01.06.2022
MC01.06.2022
NL01.06.2022
PL01.06.2022
RO01.06.2022
RS01.06.2022
SE01.06.2022
SK01.06.2022
SM01.06.2022
BG01.09.2022
NO01.09.2022
GR02.09.2022
IS01.10.2022
PT03.10.2022
Former [2023/12]AT01.06.2022
CZ01.06.2022
EE01.06.2022
ES01.06.2022
FI01.06.2022
HR01.06.2022
LT01.06.2022
LV01.06.2022
MC01.06.2022
NL01.06.2022
PL01.06.2022
RO01.06.2022
RS01.06.2022
SE01.06.2022
SK01.06.2022
SM01.06.2022
BG01.09.2022
NO01.09.2022
GR02.09.2022
IS01.10.2022
PT03.10.2022
Former [2023/11]AT01.06.2022
CZ01.06.2022
EE01.06.2022
ES01.06.2022
FI01.06.2022
HR01.06.2022
LT01.06.2022
LV01.06.2022
MC01.06.2022
NL01.06.2022
PL01.06.2022
RO01.06.2022
RS01.06.2022
SE01.06.2022
SK01.06.2022
SM01.06.2022
BG01.09.2022
NO01.09.2022
GR02.09.2022
PT03.10.2022
Former [2023/09]AT01.06.2022
CZ01.06.2022
EE01.06.2022
ES01.06.2022
FI01.06.2022
HR01.06.2022
LT01.06.2022
LV01.06.2022
NL01.06.2022
PL01.06.2022
RO01.06.2022
RS01.06.2022
SE01.06.2022
SK01.06.2022
SM01.06.2022
BG01.09.2022
NO01.09.2022
GR02.09.2022
PT03.10.2022
Former [2023/08]AT01.06.2022
ES01.06.2022
FI01.06.2022
HR01.06.2022
LT01.06.2022
LV01.06.2022
NL01.06.2022
PL01.06.2022
RS01.06.2022
SE01.06.2022
BG01.09.2022
NO01.09.2022
GR02.09.2022
Former [2023/07]AT01.06.2022
FI01.06.2022
HR01.06.2022
LT01.06.2022
LV01.06.2022
NL01.06.2022
PL01.06.2022
RS01.06.2022
SE01.06.2022
BG01.09.2022
NO01.09.2022
GR02.09.2022
Former [2023/02]FI01.06.2022
HR01.06.2022
LT01.06.2022
LV01.06.2022
NL01.06.2022
PL01.06.2022
RS01.06.2022
SE01.06.2022
BG01.09.2022
NO01.09.2022
GR02.09.2022
Former [2022/50]FI01.06.2022
HR01.06.2022
LT01.06.2022
LV01.06.2022
PL01.06.2022
RS01.06.2022
SE01.06.2022
BG01.09.2022
NO01.09.2022
GR02.09.2022
Former [2022/49]FI01.06.2022
HR01.06.2022
LT01.06.2022
LV01.06.2022
SE01.06.2022
BG01.09.2022
NO01.09.2022
GR02.09.2022
Former [2022/47]FI01.06.2022
LT01.06.2022
SE01.06.2022
NO01.09.2022
Cited inInternational search[A]US2011164108  (BATES ROBERT MATTHEW [US], et al) [A] 1,2,4 * paragraphs [0005] - [0009]; figures 1,2 *;
 [A]US2011249100  (JAYARAM SANKAR [US], et al) [A] 1 * paragraph [0063]; figures 11,12,17 *;
 [A]US2014327733  (WAGREICH DAVID [US]) [A] 1-8* paragraph [0090]; figure 2 *;
 [A]US2015138311  (TOWNDROW CLIVE [US]) [A] 1 * paragraph [0058]; figure 13 *;
 [A]US2016191813  (WU ANDREW L P [CA], et al) [A] 1-8 * paragraph [0027]; figure 1 *;
 [A]US9921464  (CHOI SEUNG KWON [KR]) [A] 1-7 * figures 1a,1b,5,6,7 *;
 [A]  - SCHWARZE CRAIG R ET AL, "Risley prism scan-based approach to standoff trace explosive detection", OPTICAL ENGINEERING, SOC. OF PHOTO-OPTICAL INSTRUMENTATION ENGINEERS, BELLINGHAM, vol. 53, no. 2, doi:10.1117/1.OE.53.2.021110, ISSN 0091-3286, (20140201), page 21110, (20131231), XP060048344 [A] 5 * Point 1 *

DOI:   http://dx.doi.org/10.1117/1.OE.53.2.021110
ExaminationEP2860957
    - Kintronics, "Optera IMM Series with SureVision 2.0", (20170101), URL: https://kintronics.com/product-specs/Optera%20IMM%20Series%20kintronics.pdf, (20190402), XP055576852
    - Anonymous, "2MP Varifocal Panorama Camera", (20170101), URL: https://zionssecurity.com/product/2mp-varifocal-panorama-camera/, (20190402), XP055576850
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.