| EP3827120 - KNITTED COMPONENT WITH AN ANGLED RAISED STRUCTURE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 05.04.2024 Database last updated on 09.04.2026 | |
| Former | The patent has been granted Status updated on 28.04.2023 | ||
| Former | Grant of patent is intended Status updated on 02.01.2023 | ||
| Former | Request for examination was made Status updated on 30.04.2021 | ||
| Former | The international publication has been made Status updated on 01.02.2020 | ||
| Former | unknown Status updated on 16.08.2019 | Most recent event Tooltip | 26.12.2025 | Lapse of the patent in a contracting state New state(s): TR | published on 28.01.2026 [2026/05] | Applicant(s) | For all designated states Nike Innovate C.V. One Bowerman Drive Beaverton, OR 97005-6453 / US | [2021/22] | Inventor(s) | 01 /
DURRELL, Dalton, T. c/o Nike, Inc. One Bowerman Drive Beaverton, OR 97005 / US | 02 /
GONG, Weibing c/o Nike, Inc. One Bowerman Drive Beaverton, OR 97005 / US | [2021/22] | Representative(s) | Prinz & Partner mbB Patent- und Rechtsanwälte Rundfunkplatz 2 80335 München / DE | [2021/22] | Application number, filing date | 19749950.2 | 23.07.2019 | [2021/22] | WO2019US42960 | Priority number, date | US201862702192P | 23.07.2018 Original published format: US 201862702192 P | [2021/22] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2020023468 | Date: | 30.01.2020 | Language: | EN | [2020/05] | Type: | A1 Application with search report | No.: | EP3827120 | Date: | 02.06.2021 | Language: | EN | The application published by WIPO in one of the EPO official languages on 30.01.2020 takes the place of the publication of the European patent application. | [2021/22] | Type: | B1 Patent specification | No.: | EP3827120 | Date: | 31.05.2023 | Language: | EN | [2023/22] | Search report(s) | International search report - published on: | EP | 30.01.2020 | Classification | IPC: | D04B1/22 | [2021/22] | CPC: |
D04B1/22 (EP,CN,US);
A43B1/028 (CN);
A43B1/04 (EP,CN,US);
A43B23/0205 (CN,US);
D10B2401/063 (EP,CN);
D10B2403/0113 (EP,CN);
D10B2501/043 (EP,CN,US)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2021/22] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | GESTRICK VERSEHEN MIT EINER GENEIGTEN ERHABENEN STRUKTUR | [2023/01] | English: | KNITTED COMPONENT WITH AN ANGLED RAISED STRUCTURE | [2021/22] | French: | TRICOT INCORPORANT UNE STRUCTURE ÉPAISSE INCLINÉE | [2023/01] |
| Former [2021/22] | GESTRICKTE KOMPONENTE MIT EINER ABGEWINKELTEN ERHÖHTEN STRUKTUR | ||
| Former [2021/22] | COMPOSANT TRICOTÉ DOTÉ D'UNE STRUCTURE SURÉLEVÉE INCLINÉE | Entry into regional phase | 18.02.2021 | National basic fee paid | 18.02.2021 | Designation fee(s) paid | 18.02.2021 | Examination fee paid | Examination procedure | 18.02.2021 | Examination requested [2021/22] | 18.02.2021 | Date on which the examining division has become responsible | 24.08.2021 | Amendment by applicant (claims and/or description) | 03.01.2023 | Communication of intention to grant the patent | 19.04.2023 | Fee for grant paid | 19.04.2023 | Fee for publishing/printing paid | 19.04.2023 | Receipt of the translation of the claim(s) | Divisional application(s) | EP23175658.6 / EP4234785 | Opposition(s) | 01.03.2024 | No opposition filed within time limit [2024/19] | Fees paid | Renewal fee | 15.07.2021 | Renewal fee patent year 03 | 16.06.2022 | Renewal fee patent year 04 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | CY | 23.07.2019 | HU | 23.07.2019 | AT | 31.05.2023 | BG | 31.05.2023 | CZ | 31.05.2023 | DK | 31.05.2023 | EE | 31.05.2023 | ES | 31.05.2023 | FI | 31.05.2023 | HR | 31.05.2023 | IT | 31.05.2023 | LT | 31.05.2023 | LV | 31.05.2023 | MC | 31.05.2023 | NL | 31.05.2023 | PL | 31.05.2023 | RO | 31.05.2023 | RS | 31.05.2023 | SE | 31.05.2023 | SI | 31.05.2023 | SK | 31.05.2023 | SM | 31.05.2023 | TR | 31.05.2023 | IE | 23.07.2023 | LU | 23.07.2023 | BE | 31.07.2023 | CH | 31.07.2023 | NO | 31.08.2023 | GR | 01.09.2023 | IS | 30.09.2023 | PT | 02.10.2023 | [2026/05] |
| Former [2025/39] | CY | 23.07.2019 | |
| HU | 23.07.2019 | ||
| AT | 31.05.2023 | ||
| BG | 31.05.2023 | ||
| CZ | 31.05.2023 | ||
| DK | 31.05.2023 | ||
| EE | 31.05.2023 | ||
| ES | 31.05.2023 | ||
| FI | 31.05.2023 | ||
| HR | 31.05.2023 | ||
| IT | 31.05.2023 | ||
| LT | 31.05.2023 | ||
| LV | 31.05.2023 | ||
| MC | 31.05.2023 | ||
| NL | 31.05.2023 | ||
| PL | 31.05.2023 | ||
| RO | 31.05.2023 | ||
| RS | 31.05.2023 | ||
| SE | 31.05.2023 | ||
| SI | 31.05.2023 | ||
| SK | 31.05.2023 | ||
| SM | 31.05.2023 | ||
| IE | 23.07.2023 | ||
| LU | 23.07.2023 | ||
| BE | 31.07.2023 | ||
| CH | 31.07.2023 | ||
| NO | 31.08.2023 | ||
| GR | 01.09.2023 | ||
| IS | 30.09.2023 | ||
| PT | 02.10.2023 | ||
| Former [2025/36] | CY | 23.07.2019 | |
| AT | 31.05.2023 | ||
| BG | 31.05.2023 | ||
| CZ | 31.05.2023 | ||
| DK | 31.05.2023 | ||
| EE | 31.05.2023 | ||
| ES | 31.05.2023 | ||
| FI | 31.05.2023 | ||
| HR | 31.05.2023 | ||
| IT | 31.05.2023 | ||
| LT | 31.05.2023 | ||
| LV | 31.05.2023 | ||
| MC | 31.05.2023 | ||
| NL | 31.05.2023 | ||
| PL | 31.05.2023 | ||
| RO | 31.05.2023 | ||
| RS | 31.05.2023 | ||
| SE | 31.05.2023 | ||
| SI | 31.05.2023 | ||
| SK | 31.05.2023 | ||
| SM | 31.05.2023 | ||
| IE | 23.07.2023 | ||
| LU | 23.07.2023 | ||
| BE | 31.07.2023 | ||
| CH | 31.07.2023 | ||
| NO | 31.08.2023 | ||
| GR | 01.09.2023 | ||
| IS | 30.09.2023 | ||
| PT | 02.10.2023 | ||
| Former [2024/51] | AT | 31.05.2023 | |
| BG | 31.05.2023 | ||
| CZ | 31.05.2023 | ||
| DK | 31.05.2023 | ||
| EE | 31.05.2023 | ||
| ES | 31.05.2023 | ||
| FI | 31.05.2023 | ||
| HR | 31.05.2023 | ||
| IT | 31.05.2023 | ||
| LT | 31.05.2023 | ||
| LV | 31.05.2023 | ||
| MC | 31.05.2023 | ||
| NL | 31.05.2023 | ||
| PL | 31.05.2023 | ||
| RO | 31.05.2023 | ||
| RS | 31.05.2023 | ||
| SE | 31.05.2023 | ||
| SI | 31.05.2023 | ||
| SK | 31.05.2023 | ||
| SM | 31.05.2023 | ||
| IE | 23.07.2023 | ||
| LU | 23.07.2023 | ||
| BE | 31.07.2023 | ||
| CH | 31.07.2023 | ||
| NO | 31.08.2023 | ||
| GR | 01.09.2023 | ||
| IS | 30.09.2023 | ||
| PT | 02.10.2023 | ||
| Former [2024/33] | AT | 31.05.2023 | |
| CZ | 31.05.2023 | ||
| DK | 31.05.2023 | ||
| EE | 31.05.2023 | ||
| ES | 31.05.2023 | ||
| FI | 31.05.2023 | ||
| HR | 31.05.2023 | ||
| IT | 31.05.2023 | ||
| LT | 31.05.2023 | ||
| LV | 31.05.2023 | ||
| MC | 31.05.2023 | ||
| NL | 31.05.2023 | ||
| PL | 31.05.2023 | ||
| RO | 31.05.2023 | ||
| RS | 31.05.2023 | ||
| SE | 31.05.2023 | ||
| SI | 31.05.2023 | ||
| SK | 31.05.2023 | ||
| SM | 31.05.2023 | ||
| IE | 23.07.2023 | ||
| LU | 23.07.2023 | ||
| BE | 31.07.2023 | ||
| CH | 31.07.2023 | ||
| NO | 31.08.2023 | ||
| GR | 01.09.2023 | ||
| IS | 30.09.2023 | ||
| PT | 02.10.2023 | ||
| Former [2024/26] | AT | 31.05.2023 | |
| CZ | 31.05.2023 | ||
| DK | 31.05.2023 | ||
| EE | 31.05.2023 | ||
| ES | 31.05.2023 | ||
| FI | 31.05.2023 | ||
| HR | 31.05.2023 | ||
| IT | 31.05.2023 | ||
| LT | 31.05.2023 | ||
| LV | 31.05.2023 | ||
| MC | 31.05.2023 | ||
| NL | 31.05.2023 | ||
| PL | 31.05.2023 | ||
| RO | 31.05.2023 | ||
| RS | 31.05.2023 | ||
| SE | 31.05.2023 | ||
| SI | 31.05.2023 | ||
| SK | 31.05.2023 | ||
| SM | 31.05.2023 | ||
| LU | 23.07.2023 | ||
| BE | 31.07.2023 | ||
| CH | 31.07.2023 | ||
| NO | 31.08.2023 | ||
| GR | 01.09.2023 | ||
| IS | 30.09.2023 | ||
| PT | 02.10.2023 | ||
| Former [2024/25] | AT | 31.05.2023 | |
| CZ | 31.05.2023 | ||
| DK | 31.05.2023 | ||
| EE | 31.05.2023 | ||
| ES | 31.05.2023 | ||
| FI | 31.05.2023 | ||
| HR | 31.05.2023 | ||
| LT | 31.05.2023 | ||
| LV | 31.05.2023 | ||
| MC | 31.05.2023 | ||
| NL | 31.05.2023 | ||
| PL | 31.05.2023 | ||
| RO | 31.05.2023 | ||
| RS | 31.05.2023 | ||
| SE | 31.05.2023 | ||
| SI | 31.05.2023 | ||
| SK | 31.05.2023 | ||
| SM | 31.05.2023 | ||
| LU | 23.07.2023 | ||
| BE | 31.07.2023 | ||
| CH | 31.07.2023 | ||
| NO | 31.08.2023 | ||
| GR | 01.09.2023 | ||
| IS | 30.09.2023 | ||
| PT | 02.10.2023 | ||
| Former [2024/18] | AT | 31.05.2023 | |
| CZ | 31.05.2023 | ||
| DK | 31.05.2023 | ||
| EE | 31.05.2023 | ||
| ES | 31.05.2023 | ||
| FI | 31.05.2023 | ||
| HR | 31.05.2023 | ||
| LT | 31.05.2023 | ||
| LV | 31.05.2023 | ||
| MC | 31.05.2023 | ||
| NL | 31.05.2023 | ||
| PL | 31.05.2023 | ||
| RO | 31.05.2023 | ||
| RS | 31.05.2023 | ||
| SE | 31.05.2023 | ||
| SK | 31.05.2023 | ||
| SM | 31.05.2023 | ||
| LU | 23.07.2023 | ||
| NO | 31.08.2023 | ||
| GR | 01.09.2023 | ||
| IS | 30.09.2023 | ||
| PT | 02.10.2023 | ||
| Former [2024/14] | AT | 31.05.2023 | |
| CZ | 31.05.2023 | ||
| DK | 31.05.2023 | ||
| EE | 31.05.2023 | ||
| ES | 31.05.2023 | ||
| FI | 31.05.2023 | ||
| HR | 31.05.2023 | ||
| LT | 31.05.2023 | ||
| LV | 31.05.2023 | ||
| MC | 31.05.2023 | ||
| NL | 31.05.2023 | ||
| PL | 31.05.2023 | ||
| RO | 31.05.2023 | ||
| RS | 31.05.2023 | ||
| SE | 31.05.2023 | ||
| SK | 31.05.2023 | ||
| SM | 31.05.2023 | ||
| NO | 31.08.2023 | ||
| GR | 01.09.2023 | ||
| IS | 30.09.2023 | ||
| PT | 02.10.2023 | ||
| Former [2024/10] | AT | 31.05.2023 | |
| CZ | 31.05.2023 | ||
| DK | 31.05.2023 | ||
| EE | 31.05.2023 | ||
| ES | 31.05.2023 | ||
| FI | 31.05.2023 | ||
| HR | 31.05.2023 | ||
| LT | 31.05.2023 | ||
| LV | 31.05.2023 | ||
| NL | 31.05.2023 | ||
| PL | 31.05.2023 | ||
| RO | 31.05.2023 | ||
| RS | 31.05.2023 | ||
| SE | 31.05.2023 | ||
| SK | 31.05.2023 | ||
| SM | 31.05.2023 | ||
| NO | 31.08.2023 | ||
| GR | 01.09.2023 | ||
| IS | 30.09.2023 | ||
| PT | 02.10.2023 | ||
| Former [2024/08] | AT | 31.05.2023 | |
| ES | 31.05.2023 | ||
| FI | 31.05.2023 | ||
| HR | 31.05.2023 | ||
| LT | 31.05.2023 | ||
| LV | 31.05.2023 | ||
| NL | 31.05.2023 | ||
| PL | 31.05.2023 | ||
| RS | 31.05.2023 | ||
| SE | 31.05.2023 | ||
| SK | 31.05.2023 | ||
| SM | 31.05.2023 | ||
| NO | 31.08.2023 | ||
| GR | 01.09.2023 | ||
| IS | 30.09.2023 | ||
| Former [2024/03] | AT | 31.05.2023 | |
| ES | 31.05.2023 | ||
| FI | 31.05.2023 | ||
| HR | 31.05.2023 | ||
| LT | 31.05.2023 | ||
| LV | 31.05.2023 | ||
| NL | 31.05.2023 | ||
| PL | 31.05.2023 | ||
| RS | 31.05.2023 | ||
| SE | 31.05.2023 | ||
| NO | 31.08.2023 | ||
| GR | 01.09.2023 | ||
| IS | 30.09.2023 | ||
| Former [2024/01] | AT | 31.05.2023 | |
| ES | 31.05.2023 | ||
| HR | 31.05.2023 | ||
| LT | 31.05.2023 | ||
| LV | 31.05.2023 | ||
| NL | 31.05.2023 | ||
| PL | 31.05.2023 | ||
| RS | 31.05.2023 | ||
| SE | 31.05.2023 | ||
| NO | 31.08.2023 | ||
| GR | 01.09.2023 | ||
| IS | 30.09.2023 | ||
| Former [2023/52] | AT | 31.05.2023 | |
| ES | 31.05.2023 | ||
| HR | 31.05.2023 | ||
| NL | 31.05.2023 | ||
| PL | 31.05.2023 | ||
| RS | 31.05.2023 | ||
| SE | 31.05.2023 | ||
| NO | 31.08.2023 | ||
| GR | 01.09.2023 | ||
| IS | 30.09.2023 | ||
| Former [2023/51] | AT | 31.05.2023 | |
| ES | 31.05.2023 | ||
| HR | 31.05.2023 | ||
| PL | 31.05.2023 | ||
| RS | 31.05.2023 | ||
| SE | 31.05.2023 | ||
| NO | 31.08.2023 | ||
| GR | 01.09.2023 | ||
| IS | 30.09.2023 | ||
| Former [2023/50] | AT | 31.05.2023 | |
| ES | 31.05.2023 | ||
| PL | 31.05.2023 | ||
| SE | 31.05.2023 | ||
| NO | 31.08.2023 | ||
| GR | 01.09.2023 | ||
| IS | 30.09.2023 | ||
| Former [2023/48] | AT | 31.05.2023 | |
| ES | 31.05.2023 | ||
| SE | 31.05.2023 | ||
| NO | 31.08.2023 | ||
| Former [2023/46] | ES | 31.05.2023 | Cited in | International search | [XYI] EP3138431 (SHIMA SEIKI MFG et al.) | [Y] US2018042333 (MANOS GULLY ALEXA et al.) | by applicant | US8522577 | US201113048527 |