blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3814121

EP3814121 - METHOD AND DEVICE FOR PRODUCING WORKPIECES COMPRISING FIBRE COMPOSITE MATERIAL [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  07.06.2024
Database last updated on 16.09.2024
FormerThe patent has been granted
Status updated on  30.06.2023
FormerGrant of patent is intended
Status updated on  22.01.2023
FormerRequest for examination was made
Status updated on  23.12.2022
FormerGrant of patent is intended
Status updated on  10.05.2022
FormerRequest for examination was made
Status updated on  03.04.2021
FormerThe international publication has been made
Status updated on  03.01.2020
Formerunknown
Status updated on  19.08.2019
Most recent event   Tooltip07.06.2024No opposition filed within time limitpublished on 10.07.2024  [2024/28]
Applicant(s)For all designated states
AZL Aachen GmbH
Campus Boulevard 30
52074 Aachen / DE
For all designated states
Rheinisch-Westfälische Technische Hochschule (RWTH) Aachen
Templergraben 55
52062 Aachen / DE
[2021/18]
Inventor(s)01 / WEILER, Thomas
c/o Aachener Zentrum für integrativen Leichtbau
(AZL)
Campus Boulevard 30
52074 Aachen / DE
02 / SCHARES, Richard
c/o Aachener Zentrum für integrativen Leichtbau
(AZL)
Campus Boulevard 30
52074 Aachen / DE
03 / WENDT, Albert
c/o Aachener Zentrum für integrativen Leichtbau
(AZL)
Campus Boulevard 30
52074 Aachen / DE
04 / GIESGEN, Lazlo
c/o Aachener Zentrum für integrativen Leichtbau
(AZL)
Campus Boulevard 30
52074 Aachen / DE
05 / TIMMERMANNS, Ruben Johannes Matthias
c/o Aachener Zentrum für integrativen Leichtbau
(AZL)
Campus Boulevard 30
52074 Aachen / DE
 [2023/31]
Former [2021/18]01 / WEILER, Thomas
c/o Aachener Zentrum für integrativen Leichtbau
AZL) Campus Boulevard 30
52074 Aachen / DE
02 / SCHARES, Richard
c/o Aachener Zentrum für integrativen Leichtbau
AZL) Campus Boulevard 30
52074 Aachen / DE
03 / WENDT, Albert
c/o Aachener Zentrum für integrativen Leichtbau
AZL) Campus Boulevard 30
52074 Aachen / DE
04 / GIESGEN, Lazlo
c/o Aachener Zentrum für integrativen Leichtbau
AZL) Campus Boulevard 30
52074 Aachen / DE
05 / TIMMERMANNS, Ruben Johannes Matthias
c/o Aachener Zentrum für integrativen Leichtbau
AZL) Campus Boulevard 30
52074 Aachen / DE
Representative(s)Naeven, Ralf
König Naeven Schmetz
Patent- & Rechtsanwälte
Eupener Straße 2a
52066 Aachen / DE
[N/P]
Former [2021/18]Naeven, Ralf
König Naeven Schmetz
Patent- und Rechtsanwaltskanzlei
Kackertstraße 10
52072 Aachen / DE
Application number, filing date19752080.225.06.2019
[2021/18]
WO2019DE100586
Priority number, dateDE20181011539226.06.2018         Original published format: DE102018115392
[2021/18]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report
No.:WO2020001702
Date:02.01.2020
Language:DE
[2020/01]
Type: A1 Application with search report 
No.:EP3814121
Date:05.05.2021
Language:DE
The application published by WIPO in one of the EPO official languages on 02.01.2020 takes the place of the publication of the European patent application.
[2021/18]
Type: B1 Patent specification 
No.:EP3814121
Date:02.08.2023
Language:DE
[2023/31]
Search report(s)International search report - published on:EP02.01.2020
ClassificationIPC:B29C70/38, B29C70/52, B29C70/20
[2022/19]
CPC:
B29C70/386 (EP); B29C70/388 (KR,US); B29C70/06 (KR);
B29C70/202 (EP,KR); B29C70/34 (KR,US); B29C70/54 (KR,US);
B32B38/1808 (KR,US) (-)
Former IPC [2021/18]B29C70/38, B29C70/52
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2021/18]  
Extension statesBANot yet paid
MENot yet paid
Validation statesKHNot yet paid
MANot yet paid
MDNot yet paid
TNNot yet paid
TitleGerman:VERFAHREN UND VORRICHTUNG ZUR PRODUKTION VON FASERVERBUNDWERKSTOFF AUFWEISENDEN WERKSTÜCKEN[2021/18]
English:METHOD AND DEVICE FOR PRODUCING WORKPIECES COMPRISING FIBRE COMPOSITE MATERIAL[2021/18]
French:PROCÉDÉ ET DISPOSITIF DE PRODUCTION DE PIÈCES COMPORTANT UN MATÉRIAU COMPOSITE RENFORCÉ DE FIBRES[2021/18]
Entry into regional phase25.01.2021National basic fee paid 
25.01.2021Designation fee(s) paid 
25.01.2021Examination fee paid 
Examination procedure25.01.2021Examination requested  [2021/18]
25.01.2021Date on which the examining division has become responsible
05.08.2021Amendment by applicant (claims and/or description)
11.05.2022Communication of intention to grant the patent
13.10.2022Despatch of communication that the application is deemed to be withdrawn, reason: fee for grant / fee for printing not paid in time
20.12.2022Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO
23.01.2023Communication of intention to grant the patent
30.05.2023Fee for grant paid
30.05.2023Fee for publishing/printing paid
30.05.2023Receipt of the translation of the claim(s)
Opposition(s)03.05.2024No opposition filed within time limit [2024/28]
Request for further processing for:The application is deemed to be withdrawn due to failure to fulfill actions required for granting the patent
21.12.2022Request for further processing filed
21.12.2022Full payment received (date of receipt of payment)
Request granted
03.01.2023Decision despatched
Fees paidRenewal fee
25.01.2021Renewal fee patent year 03
28.06.2022Renewal fee patent year 04
27.06.2023Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipCZ02.08.2023
HR02.08.2023
RS02.08.2023
SM02.08.2023
GR03.11.2023
IS02.12.2023
[2024/25]
Former [2024/20]HR02.08.2023
RS02.08.2023
SM02.08.2023
GR03.11.2023
IS02.12.2023
Former [2024/10]HR02.08.2023
RS02.08.2023
GR03.11.2023
IS02.12.2023
Former [2024/09]GR03.11.2023
IS02.12.2023
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.