EP3762255 - HEADREST FOR A SEAT [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 08.03.2024 Database last updated on 16.11.2024 | |
Former | The patent has been granted Status updated on 31.03.2023 | ||
Former | Grant of patent is intended Status updated on 02.11.2022 | ||
Former | Request for examination was made Status updated on 11.12.2020 | ||
Former | The international publication has been made Status updated on 14.09.2019 | Most recent event Tooltip | 15.11.2024 | Lapse of the patent in a contracting state New state(s): BG | published on 18.12.2024 [2024/51] | Applicant(s) | For all designated states Bombardier Inc. 400 Côte Vertu Road West Dorval, Québec H4S 1Y9 / CA | [2021/02] | Inventor(s) | 01 /
ERHEL, Philippe 2-51 Avenue Beaumont Montréal Québec H2S 1J2 / CA | 02 /
VIGEANT, Jerome 11971 rue Poincaré Montréal Québec H3L 3L6 / CA | [2021/02] | Representative(s) | HGF HGF Limited 1 City Walk Leeds LS11 9DX / GB | [2023/18] |
Former [2021/02] | HGF 1 City Walk Leeds LS11 9DX / GB | Application number, filing date | 19763711.9 | 06.03.2019 | [2021/02] | WO2019CA50270 | Priority number, date | US201862639157P | 06.03.2018 Original published format: US 201862639157 P | [2021/02] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2019169491 | Date: | 12.09.2019 | Language: | EN | [2019/37] | Type: | A1 Application with search report | No.: | EP3762255 | Date: | 13.01.2021 | Language: | EN | The application published by WIPO in one of the EPO official languages on 12.09.2019 takes the place of the publication of the European patent application. | [2021/02] | Type: | B1 Patent specification | No.: | EP3762255 | Date: | 03.05.2023 | Language: | EN | [2023/18] | Search report(s) | International search report - published on: | CA | 12.09.2019 | (Supplementary) European search report - dispatched on: | EP | 08.10.2021 | Classification | IPC: | B60N2/838, A47C7/38, B64D11/06, B60N2/809 | [2021/45] | CPC: |
B60N2/809 (EP);
B64D11/0642 (EP,US);
B60N2/85 (EP);
B60N2/853 (EP,US);
B60N2/862 (EP);
B64D11/064 (US)
|
Former IPC [2021/02] | B60N2/838, A47C7/38, B64D11/06 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2021/02] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | KOPFSTÜTZE FÜR EINEN SITZ | [2021/02] | English: | HEADREST FOR A SEAT | [2021/02] | French: | APPUIE-TÊTE DESTINÉ À UN SIÈGE | [2021/02] | Entry into regional phase | 06.10.2020 | National basic fee paid | 06.10.2020 | Search fee paid | 06.10.2020 | Designation fee(s) paid | 06.10.2020 | Examination fee paid | Examination procedure | 06.10.2020 | Examination requested [2021/02] | 22.04.2022 | Amendment by applicant (claims and/or description) | 03.11.2022 | Communication of intention to grant the patent | 03.03.2023 | Fee for grant paid | 03.03.2023 | Fee for publishing/printing paid | 03.03.2023 | Receipt of the translation of the claim(s) | Opposition(s) | 06.02.2024 | No opposition filed within time limit [2024/15] | Fees paid | Renewal fee | 24.03.2021 | Renewal fee patent year 03 | 25.03.2022 | Renewal fee patent year 04 | 23.03.2023 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 03.05.2023 | BG | 03.05.2023 | CZ | 03.05.2023 | DK | 03.05.2023 | EE | 03.05.2023 | ES | 03.05.2023 | FI | 03.05.2023 | HR | 03.05.2023 | IT | 03.05.2023 | LT | 03.05.2023 | LV | 03.05.2023 | NL | 03.05.2023 | PL | 03.05.2023 | RO | 03.05.2023 | RS | 03.05.2023 | SE | 03.05.2023 | SI | 03.05.2023 | SK | 03.05.2023 | SM | 03.05.2023 | NO | 03.08.2023 | GR | 04.08.2023 | IS | 03.09.2023 | PT | 04.09.2023 | [2024/51] |
Former [2024/26] | AT | 03.05.2023 | |
CZ | 03.05.2023 | ||
DK | 03.05.2023 | ||
EE | 03.05.2023 | ||
ES | 03.05.2023 | ||
FI | 03.05.2023 | ||
HR | 03.05.2023 | ||
IT | 03.05.2023 | ||
LT | 03.05.2023 | ||
LV | 03.05.2023 | ||
NL | 03.05.2023 | ||
PL | 03.05.2023 | ||
RO | 03.05.2023 | ||
RS | 03.05.2023 | ||
SE | 03.05.2023 | ||
SI | 03.05.2023 | ||
SK | 03.05.2023 | ||
SM | 03.05.2023 | ||
NO | 03.08.2023 | ||
GR | 04.08.2023 | ||
IS | 03.09.2023 | ||
PT | 04.09.2023 | ||
Former [2024/25] | AT | 03.05.2023 | |
CZ | 03.05.2023 | ||
DK | 03.05.2023 | ||
EE | 03.05.2023 | ||
ES | 03.05.2023 | ||
FI | 03.05.2023 | ||
HR | 03.05.2023 | ||
LT | 03.05.2023 | ||
LV | 03.05.2023 | ||
NL | 03.05.2023 | ||
PL | 03.05.2023 | ||
RO | 03.05.2023 | ||
RS | 03.05.2023 | ||
SE | 03.05.2023 | ||
SI | 03.05.2023 | ||
SK | 03.05.2023 | ||
SM | 03.05.2023 | ||
NO | 03.08.2023 | ||
GR | 04.08.2023 | ||
IS | 03.09.2023 | ||
PT | 04.09.2023 | ||
Former [2024/10] | AT | 03.05.2023 | |
CZ | 03.05.2023 | ||
DK | 03.05.2023 | ||
EE | 03.05.2023 | ||
ES | 03.05.2023 | ||
FI | 03.05.2023 | ||
HR | 03.05.2023 | ||
LT | 03.05.2023 | ||
LV | 03.05.2023 | ||
NL | 03.05.2023 | ||
PL | 03.05.2023 | ||
RO | 03.05.2023 | ||
RS | 03.05.2023 | ||
SE | 03.05.2023 | ||
SK | 03.05.2023 | ||
SM | 03.05.2023 | ||
NO | 03.08.2023 | ||
GR | 04.08.2023 | ||
IS | 03.09.2023 | ||
PT | 04.09.2023 | ||
Former [2024/08] | AT | 03.05.2023 | |
ES | 03.05.2023 | ||
FI | 03.05.2023 | ||
HR | 03.05.2023 | ||
LT | 03.05.2023 | ||
LV | 03.05.2023 | ||
NL | 03.05.2023 | ||
PL | 03.05.2023 | ||
RS | 03.05.2023 | ||
SE | 03.05.2023 | ||
SK | 03.05.2023 | ||
SM | 03.05.2023 | ||
NO | 03.08.2023 | ||
GR | 04.08.2023 | ||
IS | 03.09.2023 | ||
PT | 04.09.2023 | ||
Former [2024/03] | AT | 03.05.2023 | |
ES | 03.05.2023 | ||
FI | 03.05.2023 | ||
HR | 03.05.2023 | ||
LT | 03.05.2023 | ||
LV | 03.05.2023 | ||
NL | 03.05.2023 | ||
PL | 03.05.2023 | ||
RS | 03.05.2023 | ||
SE | 03.05.2023 | ||
NO | 03.08.2023 | ||
GR | 04.08.2023 | ||
IS | 03.09.2023 | ||
PT | 04.09.2023 | ||
Former [2024/01] | AT | 03.05.2023 | |
ES | 03.05.2023 | ||
HR | 03.05.2023 | ||
LT | 03.05.2023 | ||
LV | 03.05.2023 | ||
NL | 03.05.2023 | ||
PL | 03.05.2023 | ||
RS | 03.05.2023 | ||
SE | 03.05.2023 | ||
NO | 03.08.2023 | ||
GR | 04.08.2023 | ||
IS | 03.09.2023 | ||
PT | 04.09.2023 | ||
Former [2023/51] | AT | 03.05.2023 | |
ES | 03.05.2023 | ||
HR | 03.05.2023 | ||
NL | 03.05.2023 | ||
PL | 03.05.2023 | ||
RS | 03.05.2023 | ||
SE | 03.05.2023 | ||
NO | 03.08.2023 | ||
GR | 04.08.2023 | ||
IS | 03.09.2023 | ||
PT | 04.09.2023 | ||
Former [2023/50] | AT | 03.05.2023 | |
ES | 03.05.2023 | ||
NL | 03.05.2023 | ||
PL | 03.05.2023 | ||
SE | 03.05.2023 | ||
NO | 03.08.2023 | ||
GR | 04.08.2023 | ||
IS | 03.09.2023 | ||
PT | 04.09.2023 | ||
Former [2023/48] | AT | 03.05.2023 | |
ES | 03.05.2023 | ||
NL | 03.05.2023 | ||
SE | 03.05.2023 | ||
NO | 03.08.2023 | ||
PT | 04.09.2023 | ||
Former [2023/46] | ES | 03.05.2023 | |
PT | 04.09.2023 | Documents cited: | Search | [XAI]US2002158499 (CLOUGH ROBERT [US]) [X] 1 * abstract * * figure 7 * [A] 10 [I] 2-9; | [A]US2008315657 (BEROTH MICHAEL [US], et al) [A] 1,10 * abstract * * figures 2,3 *; | [A]US2013069411 (WALKER BROCK [US], et al) [A] 1,10 * abstract ** figure 2 * | International search | [A]US823792 (KLINE SAMUEL [US]) [A] 1-23 *the whole document*; | [X]DE4431109 (DAIMLER BENZ AG [DE]) [X] 1-3, 10-13, 20-23 *the whole document*; | [A]WO0105621 (GESTIND POLAND SP Z O O [PL]) [A] 1-23 *the whole document*; | [A]US2010038949 (LIAO TZU-YING [TW]) [A] 1-23 *the whole document*; | [A]US2014284985 (HARTLAUB SILVIO [DE]) [A] 1-23*the whole document* | by applicant | DE4431109 | US2002158499 |