blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3830408

EP3830408 - METHOD AND DEVICE FOR DETECTING THE BREAKDOWN VOLTAGE BETWEEN THE ELECTRODES OF A SPARK PLUG CONNECTED TO AN IGNITION COIL FOR A CYLINDER IGNITION SYSTEM IN AN INTERNAL COMBUSTION ENGINE [Right-click to bookmark this link]
StatusExamination is in progress
Status updated on  15.06.2023
Database last updated on 16.09.2024
FormerRequest for examination was made
Status updated on  07.05.2021
FormerThe international publication has been made
Status updated on  08.02.2020
Formerunknown
Status updated on  23.09.2019
Most recent event   Tooltip31.07.2024New entry: Renewal fee paid 
Applicant(s)For all designated states
Eldor Corporation S.p.A.
Via Don Paolo Berra 18
22030 Orsenigo (Como) / IT
[2021/23]
Inventor(s)01 / FORTE, Pasquale
C/o Eldor Corporation S.p.A.
Via Don Paolo Berra 18
22030 Orsenigo (Como) / IT
02 / ALBI, Marco
C/o Eldor Corporation S.p.A.
Via Don Paolo Berra 18
22030 Orsenigo (Como) / IT
03 / POZZI, Pierluigi
C/o Eldor Corporation S.p.A.
Via Don Paolo Berra 18
22030 Orsenigo (Como) / IT
04 / SILVA, Stefano
C/o Eldor Corporation S.p.A.
Via Don Paolo Berra 18
22030 Orsenigo (Como) / IT
05 / CARUGATI, Eugenio
C/o Eldor Corporation S.p.A.
Via Don Paolo Berra 18
22030 Orsenigo (Como) / IT
 [2021/23]
Representative(s)Zermani Biondi Orsi, Umberto
Bugnion S.p.A.
Viale Lancetti, 17
20158 Milano / IT
[N/P]
Former [2021/23]Zermani, Umberto
Bugnion S.p.A.
Viale Lancetti, 17
20158 Milano / IT
Application number, filing date19768902.930.07.2019
[2021/23]
WO2019IB56469
Priority number, dateIT2018000778102.08.2018         Original published format: IT201800007781
[2021/23]
Filing languageIT
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2020026128
Date:06.02.2020
Language:EN
[2020/06]
Type: A1 Application with search report 
No.:EP3830408
Date:09.06.2021
Language:EN
The application published by WIPO in one of the EPO official languages on 06.02.2020 takes the place of the publication of the European patent application.
[2021/23]
Search report(s)International search report - published on:EP06.02.2020
ClassificationIPC:F02P17/12, F02P3/05
[2021/23]
CPC:
F02P17/12 (EP,US); F02P3/051 (EP,US); H01T13/58 (US);
H01T13/60 (US); F02P2017/121 (EP,US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2021/23]
TitleGerman:VERFAHREN UND VORRICHTUNG ZUR ERFASSUNG DER DURCHBRUCHSPANNUNG ZWISCHEN DEN ELEKTRODEN EINER MIT EINER ZÜNDSPULE VERBUNDENEN ZÜNDKERZE FÜR EIN ZYLINDERZÜNDSYSTEM EINES VERBRENNUNGSMOTORS[2021/23]
English:METHOD AND DEVICE FOR DETECTING THE BREAKDOWN VOLTAGE BETWEEN THE ELECTRODES OF A SPARK PLUG CONNECTED TO AN IGNITION COIL FOR A CYLINDER IGNITION SYSTEM IN AN INTERNAL COMBUSTION ENGINE[2021/23]
French:PROCÉDÉ ET DISPOSITIF DE DÉTECTION DE LA TENSION DE CLAQUAGE ENTRE LES ÉLECTRODES D'UNE BOUGIE D'ALLUMAGE CONNECTÉE À UNE BOBINE D'ALLUMAGE POUR UN SYSTÈME D'ALLUMAGE DE CYLINDRE DANS UN MOTEUR À COMBUSTION INTERNE[2021/23]
Entry into regional phase28.01.2021National basic fee paid 
28.01.2021Designation fee(s) paid 
28.01.2021Examination fee paid 
Examination procedure28.01.2021Examination requested  [2021/23]
28.01.2021Date on which the examining division has become responsible
11.08.2021Amendment by applicant (claims and/or description)
14.06.2023Despatch of a communication from the examining division (Time limit: M06)
24.01.2024Despatch of communication that the application is deemed to be withdrawn, reason: reply to the communication from the examining division not received in time
20.03.2024Reply to a communication from the examining division
Request for further processing for:The application is deemed to be withdrawn due to failure to reply to the examination report
20.03.2024Request for further processing filed
20.03.2024Full payment received (date of receipt of payment)
Request granted
23.04.2024Decision despatched
Fees paidRenewal fee
28.07.2021Renewal fee patent year 03
28.07.2022Renewal fee patent year 04
31.07.2023Renewal fee patent year 05
31.07.2024Renewal fee patent year 06
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Cited inInternational search[A]EP0555851  (WEBER SRL [IT]);
 [A]EP0652363  (CHRYSLER CORP [US]);
 [A]US5513620  (PYKO JAN S [US], et al);
 [A]JP2000038978  (YANMAR DIESEL ENGINE CO);
 [A]US6236213  (MARUTA NAOYUKI [JP], et al);
 [A]US2018038338  (SUGIURA AKIMITSU [JP], et al)
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.