EP4047130 - MODULAR PAVEMENT SYSTEM WITH A WEAR-PROTECTIVE SYSTEM [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 25.10.2024 Database last updated on 13.11.2024 | |
Former | The patent has been granted Status updated on 17.11.2023 | ||
Former | Grant of patent is intended Status updated on 12.07.2023 | ||
Former | Request for examination was made Status updated on 22.07.2022 | ||
Former | The international publication has been made Status updated on 07.03.2020 | ||
Former | unknown Status updated on 16.11.2019 | Most recent event Tooltip | 25.10.2024 | No opposition filed within time limit | published on 27.11.2024 [2024/48] | Applicant(s) | For all designated states ISSG Sports Innovations, LDA Rua Quinta do Bom Retiro, n° 12 Armazém D 2820-690 Charneca de Caparica / PT | [2024/10] |
Former [2022/34] | For all designated states ISSG Sports Innovations, LDA Rua Quinta do Gato Bravo, n°5 G Zona Industrial de Vale Flores 2810-069 Feijó / PT | Inventor(s) | 01 /
MARTA MACHADO, Maria Emília Rua Conselheiro José Silvestre Ribeiro 20 - 4° Esq 1600-432 Lisboa / PT | 02 /
SIMÕES VICENTE, Nuno Miguel Rua Quinta do Gato Bravo, n° 5 G Zona Industrial de Vale Flores 2810-352 Feijó / PT | [2022/34] | Representative(s) | Lourenço Martinho do Rosário, Ana Margarida Gastão Cunha Ferreira Rua dos Bacalhoeiros, 4 1100-070 Lisboa / PT | [2022/34] | Application number, filing date | 19798715.9 | 30.08.2019 | [2022/34] | WO2019IB57321 | Priority number, date | PT20180111115 | 31.08.2018 Original published format: PT 2018111115 | [2022/34] | Filing language | PT | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | WO2020044300 | Date: | 05.03.2020 | Language: | PT | [2020/10] | Type: | A2 Application without search report | No.: | EP4047130 | Date: | 24.08.2022 | Language: | EN | [2022/34] | Type: | B1 Patent specification | No.: | EP4047130 | Date: | 20.12.2023 | Language: | EN | [2023/51] | Search report(s) | International search report - published on: | EP | 14.05.2020 | Classification | IPC: | E01C13/04, E04F15/10 | [2022/34] | CPC: |
E01C13/045 (EP,PT,US);
E01C13/04 (US);
E04F15/10 (US);
E04F15/105 (EP);
E04F15/225 (US);
E01C2201/10 (EP,US);
E04F2290/044 (EP,US)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2022/34] | Title | German: | MODULARES PFLASTERUNGSSYSTEM MIT EINEM VERSCHLEISSSCHUTZSYSTEM | [2022/34] | English: | MODULAR PAVEMENT SYSTEM WITH A WEAR-PROTECTIVE SYSTEM | [2022/34] | French: | SYSTÈME DE PLANCHER MODULAIRE AVEC SYSTÈME DE PROTECTION CONTRE L'USURE | [2023/29] |
Former [2022/34] | SYSTÈME MODULAIRE POUR PLANCHER AVEC SYSTÈME DE PROTECTION CONTRE L'USURE | Entry into regional phase | 16.04.2021 | Translation filed | 31.03.2021 | National basic fee paid | 31.03.2021 | Designation fee(s) paid | 31.03.2021 | Examination fee paid | Examination procedure | 16.04.2021 | Amendment by applicant (claims and/or description) | 16.04.2021 | Date on which the examining division has become responsible | deleted | Deletion: Application deemed to be withdrawn, date of legal effect [2022/34] | 16.04.2021 | Examination requested [2022/34] | 06.05.2021 | Despatch of communication that the application is deemed to be withdrawn, reason: filing fee / search fee not paid in time [2022/34] | 13.07.2023 | Communication of intention to grant the patent | 03.11.2023 | Receipt of the translation of the claim(s) | 10.11.2023 | Fee for grant paid | 10.11.2023 | Fee for publishing/printing paid | Opposition(s) | 23.09.2024 | No opposition filed within time limit [2024/48] | Request for further processing for: | The application is deemed to be withdrawn due to failure to file the translation | 19.04.2021 | Request for further processing filed | 19.04.2021 | Full payment received (date of receipt of payment) Request granted | 09.07.2021 | Decision despatched | 02.07.2021 | Request for further processing filed | 02.07.2021 | Full payment received (date of receipt of payment) Request granted | 09.07.2021 | Decision despatched | The application is deemed to be withdrawn due to non-payment of the filing fee | 19.04.2021 | Request for further processing filed | 19.04.2021 | Full payment received (date of receipt of payment) Request granted | 09.07.2021 | Decision despatched | The application is deemed to be withdrawn due to non-payment of the examination fee | 19.04.2021 | Request for further processing filed | 19.04.2021 | Full payment received (date of receipt of payment) Request granted | 09.07.2021 | Decision despatched | The application is deemed to be withdrawn due to non-payment of designation fees TR, SM, SK, SI, SE, RS, RO, PT, PL, NO, NL, MT, MK, MC, LV, LU, LT, IT, IS, IE, HU, HR, GR, GB, FR, FI, ES, EE, DK, DE, CZ, CY, CH, BG, BE, AT, AL | 19.04.2021 | Request for further processing filed | 19.04.2021 | Full payment received (date of receipt of payment) Request granted | 09.07.2021 | Decision despatched | Fees paid | Renewal fee | 25.08.2021 | Renewal fee patent year 03 | 26.08.2022 | Renewal fee patent year 04 | 28.08.2023 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | CZ | 20.12.2023 | ES | 20.12.2023 | HR | 20.12.2023 | PL | 20.12.2023 | RO | 20.12.2023 | RS | 20.12.2023 | SK | 20.12.2023 | SM | 20.12.2023 | NO | 20.03.2024 | IS | 20.04.2024 | [2024/36] |
Former [2024/35] | CZ | 20.12.2023 | |
ES | 20.12.2023 | ||
HR | 20.12.2023 | ||
RO | 20.12.2023 | ||
RS | 20.12.2023 | ||
SM | 20.12.2023 | ||
NO | 20.03.2024 | ||
IS | 20.04.2024 | ||
Former [2024/33] | ES | 20.12.2023 | |
HR | 20.12.2023 | ||
RS | 20.12.2023 | ||
SM | 20.12.2023 | ||
NO | 20.03.2024 | ||
IS | 20.04.2024 | ||
Former [2024/32] | ES | 20.12.2023 | |
HR | 20.12.2023 | ||
RS | 20.12.2023 | ||
NO | 20.03.2024 | ||
IS | 20.04.2024 | ||
Former [2024/25] | ES | 20.12.2023 | |
HR | 20.12.2023 | ||
RS | 20.12.2023 | ||
NO | 20.03.2024 | Cited in | International search | [A]KR200472466Y (SG ICE CO LTD [KR]) [A] 1-6 * figures 1-6 * * the whole document *; | [A]US2015225965 (MOLLER JR JORGEN J [US], et al) [A] 1-6 * figures 1-31 * * the whole document *; | [XI]KR101870386B (HITOP CO LTD [KR]) [X] 1-4 * figures 1-6 * * the whole document *[I] 5,6; | [XI]US2018195294 (MOLLER JR JORGEN J [US], et al) [X] 1-4 * figures 12-24 * * paragraph 0056 - sentence 0064 * * the whole document * [I] 5,6 |