EP3900456 - BEAM SWITCHING ROBUSTNESS IN UNLICENSED RADIO FREQUENCY SPECTRUM BAND [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 13.09.2024 Database last updated on 29.10.2024 | |
Former | The patent has been granted Status updated on 06.10.2023 | ||
Former | Grant of patent is intended Status updated on 22.05.2023 | ||
Former | Request for examination was made Status updated on 24.09.2021 | ||
Former | The international publication has been made Status updated on 02.07.2020 | ||
Former | unknown Status updated on 28.01.2020 | Most recent event Tooltip | 25.10.2024 | Lapse of the patent in a contracting state New state(s): CH | published on 27.11.2024 [2024/48] | Applicant(s) | For all designated states QUALCOMM Incorporated 5775 Morehouse Drive San Diego, CA 92121-1714 / US | [2021/43] | Inventor(s) | 01 /
JOHN WILSON, Makesh Pravin 5775 Morehouse Drive San Diego, California 92121-1714 / US | 02 /
LUO, Tao 5775 Morehouse Drive San Diego, California 92121-1714 / US | 03 /
ZHANG, Xiaoxia 5775 Morehouse Drive San Diego, California 92121-1714 / US | 04 /
ZHOU, Yan 5775 Morehouse Drive San Diego, California 92121-1714 / US | 05 /
CHANDE, Vinay 5775 Morehouse Drive San Diego, California 92121-1714 / US | 06 /
CHENDAMARAI KANNAN, Arumugam 5775 Morehouse Drive San Diego, California 92121-1714 / US | 07 /
SUN, Jing 5775 Morehouse Drive San Diego, California 92121-1714 / US | [2021/43] | Representative(s) | Bardehle Pagenberg Partnerschaft mbB Patentanwälte Rechtsanwälte Prinzregentenplatz 7 81675 München / DE | [2021/43] | Application number, filing date | 19839237.5 | 19.12.2019 | [2021/43] | WO2019US67559 | Priority number, date | US201862784327P | 21.12.2018 Original published format: US 201862784327 P | US201916719564 | 18.12.2019 Original published format: US201916719564 | [2021/43] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2020132289 | Date: | 25.06.2020 | Language: | EN | [2020/26] | Type: | A1 Application with search report | No.: | EP3900456 | Date: | 27.10.2021 | Language: | EN | The application published by WIPO in one of the EPO official languages on 25.06.2020 takes the place of the publication of the European patent application. | [2021/43] | Type: | B1 Patent specification | No.: | EP3900456 | Date: | 08.11.2023 | Language: | EN | [2023/45] | Search report(s) | International search report - published on: | EP | 25.06.2020 | Classification | IPC: | H04B7/06, H04B7/02, H04B7/08, H04L5/00, // H04W16/28, H04W36/06, H04W16/14 | [2023/23] | CPC: |
H04L5/0055 (EP,US);
H04W16/28 (EP,US);
H04B7/02 (EP);
H04B7/0695 (EP);
H04B7/088 (EP);
H04L5/0023 (EP);
H04L5/0082 (EP);
H04L5/0091 (EP);
H04W16/14 (EP,US);
H04W74/02 (US);
H04W80/02 (US);
H04L5/001 (EP);
|
Former IPC [2021/43] | H04W72/04, H04W16/14, H04L5/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2021/43] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | STRAHLUMSCHALTUNGSROBUSTHEIT IN UNLIZENZIERTEM FUNKFREQUENZSPEKTRUMSBAND | [2021/43] | English: | BEAM SWITCHING ROBUSTNESS IN UNLICENSED RADIO FREQUENCY SPECTRUM BAND | [2021/43] | French: | ROBUSTESSE DE COMMUTATION DE FAISCEAU DANS UNE BANDE DE SPECTRE RADIOFRÉQUENCE SANS LICENCE | [2021/43] | Entry into regional phase | 26.05.2021 | National basic fee paid | 26.05.2021 | Designation fee(s) paid | 26.05.2021 | Examination fee paid | Examination procedure | 26.05.2021 | Examination requested [2021/43] | 26.05.2021 | Date on which the examining division has become responsible | 01.02.2022 | Amendment by applicant (claims and/or description) | 23.05.2023 | Communication of intention to grant the patent | 28.09.2023 | Fee for grant paid | 28.09.2023 | Fee for publishing/printing paid | 28.09.2023 | Receipt of the translation of the claim(s) | Divisional application(s) | EP23203812.5 / EP4290797 | Opposition(s) | 09.08.2024 | No opposition filed within time limit [2024/42] | Fees paid | Renewal fee | 06.12.2021 | Renewal fee patent year 03 | 09.12.2022 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 08.11.2023 | CZ | 08.11.2023 | DK | 08.11.2023 | EE | 08.11.2023 | ES | 08.11.2023 | HR | 08.11.2023 | IT | 08.11.2023 | LT | 08.11.2023 | LV | 08.11.2023 | MC | 08.11.2023 | NL | 08.11.2023 | PL | 08.11.2023 | RO | 08.11.2023 | RS | 08.11.2023 | SE | 08.11.2023 | SK | 08.11.2023 | SM | 08.11.2023 | IE | 19.12.2023 | LU | 19.12.2023 | BE | 31.12.2023 | CH | 31.12.2023 | BG | 08.02.2024 | NO | 08.02.2024 | GR | 09.02.2024 | IS | 08.03.2024 | PT | 08.03.2024 | [2024/48] |
Former [2024/47] | AT | 08.11.2023 | |
CZ | 08.11.2023 | ||
DK | 08.11.2023 | ||
EE | 08.11.2023 | ||
ES | 08.11.2023 | ||
HR | 08.11.2023 | ||
IT | 08.11.2023 | ||
LT | 08.11.2023 | ||
LV | 08.11.2023 | ||
MC | 08.11.2023 | ||
NL | 08.11.2023 | ||
PL | 08.11.2023 | ||
RO | 08.11.2023 | ||
RS | 08.11.2023 | ||
SE | 08.11.2023 | ||
SK | 08.11.2023 | ||
SM | 08.11.2023 | ||
IE | 19.12.2023 | ||
LU | 19.12.2023 | ||
BE | 31.12.2023 | ||
BG | 08.02.2024 | ||
NO | 08.02.2024 | ||
GR | 09.02.2024 | ||
IS | 08.03.2024 | ||
PT | 08.03.2024 | ||
Former [2024/46] | AT | 08.11.2023 | |
CZ | 08.11.2023 | ||
DK | 08.11.2023 | ||
EE | 08.11.2023 | ||
ES | 08.11.2023 | ||
HR | 08.11.2023 | ||
IT | 08.11.2023 | ||
LT | 08.11.2023 | ||
LV | 08.11.2023 | ||
MC | 08.11.2023 | ||
NL | 08.11.2023 | ||
PL | 08.11.2023 | ||
RO | 08.11.2023 | ||
RS | 08.11.2023 | ||
SE | 08.11.2023 | ||
SK | 08.11.2023 | ||
SM | 08.11.2023 | ||
IE | 19.12.2023 | ||
LU | 19.12.2023 | ||
BG | 08.02.2024 | ||
NO | 08.02.2024 | ||
GR | 09.02.2024 | ||
IS | 08.03.2024 | ||
PT | 08.03.2024 | ||
Former [2024/40] | AT | 08.11.2023 | |
CZ | 08.11.2023 | ||
DK | 08.11.2023 | ||
EE | 08.11.2023 | ||
ES | 08.11.2023 | ||
HR | 08.11.2023 | ||
IT | 08.11.2023 | ||
LT | 08.11.2023 | ||
LV | 08.11.2023 | ||
MC | 08.11.2023 | ||
NL | 08.11.2023 | ||
PL | 08.11.2023 | ||
RO | 08.11.2023 | ||
RS | 08.11.2023 | ||
SE | 08.11.2023 | ||
SK | 08.11.2023 | ||
SM | 08.11.2023 | ||
LU | 19.12.2023 | ||
BG | 08.02.2024 | ||
NO | 08.02.2024 | ||
GR | 09.02.2024 | ||
IS | 08.03.2024 | ||
PT | 08.03.2024 | ||
Former [2024/36] | AT | 08.11.2023 | |
CZ | 08.11.2023 | ||
DK | 08.11.2023 | ||
EE | 08.11.2023 | ||
ES | 08.11.2023 | ||
HR | 08.11.2023 | ||
IT | 08.11.2023 | ||
LT | 08.11.2023 | ||
LV | 08.11.2023 | ||
NL | 08.11.2023 | ||
PL | 08.11.2023 | ||
RO | 08.11.2023 | ||
RS | 08.11.2023 | ||
SE | 08.11.2023 | ||
SK | 08.11.2023 | ||
SM | 08.11.2023 | ||
BG | 08.02.2024 | ||
NO | 08.02.2024 | ||
GR | 09.02.2024 | ||
IS | 08.03.2024 | ||
PT | 08.03.2024 | ||
Former [2024/35] | AT | 08.11.2023 | |
CZ | 08.11.2023 | ||
DK | 08.11.2023 | ||
EE | 08.11.2023 | ||
ES | 08.11.2023 | ||
HR | 08.11.2023 | ||
LT | 08.11.2023 | ||
LV | 08.11.2023 | ||
NL | 08.11.2023 | ||
PL | 08.11.2023 | ||
RO | 08.11.2023 | ||
RS | 08.11.2023 | ||
SE | 08.11.2023 | ||
SM | 08.11.2023 | ||
BG | 08.02.2024 | ||
NO | 08.02.2024 | ||
GR | 09.02.2024 | ||
IS | 08.03.2024 | ||
PT | 08.03.2024 | ||
Former [2024/34] | AT | 08.11.2023 | |
DK | 08.11.2023 | ||
EE | 08.11.2023 | ||
ES | 08.11.2023 | ||
HR | 08.11.2023 | ||
LT | 08.11.2023 | ||
LV | 08.11.2023 | ||
NL | 08.11.2023 | ||
PL | 08.11.2023 | ||
RS | 08.11.2023 | ||
SE | 08.11.2023 | ||
SM | 08.11.2023 | ||
BG | 08.02.2024 | ||
NO | 08.02.2024 | ||
GR | 09.02.2024 | ||
IS | 08.03.2024 | ||
PT | 08.03.2024 | ||
Former [2024/33] | AT | 08.11.2023 | |
DK | 08.11.2023 | ||
ES | 08.11.2023 | ||
HR | 08.11.2023 | ||
LT | 08.11.2023 | ||
LV | 08.11.2023 | ||
NL | 08.11.2023 | ||
PL | 08.11.2023 | ||
RS | 08.11.2023 | ||
SE | 08.11.2023 | ||
SM | 08.11.2023 | ||
BG | 08.02.2024 | ||
NO | 08.02.2024 | ||
GR | 09.02.2024 | ||
IS | 08.03.2024 | ||
PT | 08.03.2024 | ||
Former [2024/26] | AT | 08.11.2023 | |
ES | 08.11.2023 | ||
HR | 08.11.2023 | ||
LT | 08.11.2023 | ||
LV | 08.11.2023 | ||
NL | 08.11.2023 | ||
PL | 08.11.2023 | ||
RS | 08.11.2023 | ||
SE | 08.11.2023 | ||
BG | 08.02.2024 | ||
NO | 08.02.2024 | ||
GR | 09.02.2024 | ||
IS | 08.03.2024 | ||
PT | 08.03.2024 | ||
Former [2024/25] | AT | 08.11.2023 | |
ES | 08.11.2023 | ||
HR | 08.11.2023 | ||
LT | 08.11.2023 | ||
NL | 08.11.2023 | ||
PL | 08.11.2023 | ||
RS | 08.11.2023 | ||
SE | 08.11.2023 | ||
BG | 08.02.2024 | ||
NO | 08.02.2024 | ||
GR | 09.02.2024 | ||
IS | 08.03.2024 | ||
PT | 08.03.2024 | ||
Former [2024/23] | AT | 08.11.2023 | |
ES | 08.11.2023 | ||
LT | 08.11.2023 | ||
NL | 08.11.2023 | ||
BG | 08.02.2024 | ||
GR | 09.02.2024 | ||
IS | 08.03.2024 | ||
PT | 08.03.2024 | ||
Former [2024/21] | LT | 08.11.2023 | |
NL | 08.11.2023 | ||
BG | 08.02.2024 | ||
GR | 09.02.2024 | ||
IS | 08.03.2024 | ||
Former [2024/20] | GR | 09.02.2024 | |
IS | 08.03.2024 | Cited in | International search | [XY]WO2017221202 (NOKIA TECHNOLOGIES OY [FI], et al) [X] 16,19-23,39,41-45,64,67-71,87,89-93,98,100,102,104 * paragraphs [0031] - [0035] - [0 43] - [0084] *[Y] 17,18,24-26,40,46-48,65,66,72-74,88,94-96; | [XAI]US2018083753 (NAGARAJA SUMEETH [US], et al) [X] 1,12,27,35,49,60,75,83,97,99,101,103 * paragraphs [0001] , [0 60] - [0068] - [0 81] - [0122] * * figures 6, 10-12 * [A] 6,13-15,31,36-38,54,61-63,79,84-86 [I] 2-5,7-11,28-30,32-34,50-53,55-59,76-78,80-82; | [XYI] - ERICSSON, "Analysis of beam indication signalling options", vol. RAN WG1, no. Prague, CZ; 20171009 - 20171013, (20171008), 3GPP DRAFT; R1-1718743 ANALYSIS OF BEAM INDICATION SIGNALLING OPTIONS, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ;, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN1/Docs/, (20171008), XP051341913 [X] 1-3,8-10,12,27-29,33,35,49-51,56-58,60,75-77,81,83,97,99,101,103 * chapters 1, 2 * * figures 1-8 * [Y] 4-7,24-26,30-32,46-48,52-55,72-74,78-80,94-96 [I] 11,13-15,34,36-38,59,61-63,82,84-86 | [Y] - INTERDIGITAL INC, "On LBT for Beam-Based Transmission for NR-U", vol. RAN WG1, no. Sanya, China; 20180416 - 20180420, (20180415), 3GPP DRAFT; R1-1804885 ON LBT FOR BEAM-BASED TRANSMISSION FOR NR-U, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRA, URL: http://www.3gpp.org/ftp/Meetings%5F3GPP%5FSYNC/RAN1/Docs/, (20180415), XP051427148 [Y] 4-7,17,18,30-32,40,52-55,65,66,78-80,88 * chapters 1, 2 * | [A] - QUALCOMM INCORPORATED, "Control channel multi-beam operation", vol. RAN WG1, no. Prague, Czech Republic; 20170821 - 20170825, (20170820), 3GPP DRAFT; R1-1713420 MULTI-BEAM CONTROL OPERATION, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN1/Docs/, (20170820), XP051316222 [A] 1-15,27-38,49-63,75-86,97,99,101,103 * chapters 1, 2 * |