blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3829257

EP3829257 - COMMUNICATION METHOD AND DEVICE [Right-click to bookmark this link]
StatusExamination is in progress
Status updated on  03.02.2023
Database last updated on 02.11.2024
FormerRequest for examination was made
Status updated on  30.04.2021
FormerThe international publication has been made
Status updated on  28.02.2020
Most recent event   Tooltip03.09.2024New entry: Renewal fee paid 
Applicant(s)For all designated states
Huawei Technologies Co., Ltd.
Huawei Administration Building
Bantian
Longgang District
Shenzhen, Guangdong 518129 / CN
[2021/22]
Inventor(s)01 / ZHOU, Han
Huawei Administration Building
Bantian
Longgang District
Shenzhen, Guangdong 518129 / CN
02 / HUA, Meng
Huawei Administration Building
Bantian
Longgang District
Shenzhen, Guangdong 518129 / CN
 [2021/22]
Representative(s)MERH-IP Matias Erny Reichl Hoffmann Patentanwälte PartG mbB
Paul-Heyse-Straße 29
80336 München / DE
[N/P]
Former [2021/22]MERH-IP Matias Erny Reichl Hoffmann Patentanwälte PartG mbB
Paul-Heyse-Strasse 29
80336 München / DE
Application number, filing date19851454.919.08.2019
[2021/22]
WO2019CN101412
Priority number, dateCN20181095003920.08.2018         Original published format: CN201810950039
[2021/22]
Filing languageZH
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2020038338
Date:27.02.2020
Language:ZH
[2020/09]
Type: A1 Application with search report 
No.:EP3829257
Date:02.06.2021
Language:EN
[2021/22]
Search report(s)International search report - published on:CN27.02.2020
(Supplementary) European search report - dispatched on:EP22.09.2021
ClassificationIPC:H04W74/08, H04L5/00, H04W28/08
[2021/22]
CPC:
H04W74/0833 (EP); H04W74/0841 (EP,CN,US); H04L5/0048 (CN);
H04W28/082 (CN); H04W74/004 (CN); H04W28/0858 (EP,CN,US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2021/22]
TitleGerman:KOMMUNIKATIONSVERFAHREN UND -VORRICHTUNG[2021/22]
English:COMMUNICATION METHOD AND DEVICE[2021/22]
French:PROCÉDÉ ET DISPOSITIF DE COMMUNICATION[2021/22]
Entry into regional phase26.02.2021Translation filed 
26.02.2021National basic fee paid 
26.02.2021Search fee paid 
26.02.2021Designation fee(s) paid 
26.02.2021Examination fee paid 
Examination procedure26.02.2021Examination requested  [2021/22]
25.11.2021Amendment by applicant (claims and/or description)
03.02.2023Despatch of a communication from the examining division (Time limit: M04)
19.05.2023Reply to a communication from the examining division
Fees paidRenewal fee
31.08.2021Renewal fee patent year 03
31.08.2022Renewal fee patent year 04
31.08.2023Renewal fee patent year 05
02.09.2024Renewal fee patent year 06
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[XAI]  - SAMSUNG, "Further considerations for bandwidth part", vol. RAN WG2, no. Vancouver, Canada; 20180122 - 20180126, (20180112), 3GPP DRAFT; R2-1801465 FURTHER CONSIDERATIONS FOR BANDWIDTH PART, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANC, URL: http://www.3gpp.org/ftp/tsg%5Fran/WG2%5FRL2/TSGR2%5FAHs/2018%5F01%5FNR/Docs/, (20180112), XP051386872 [X] 1,12 * paragraph [02.1] * * paragraph [02.3] * [A] 2-8,10 [I] 9,11,13-15
 [XAI]  - ZTE, "impacts on MAC for NR-U operation", vol. RAN WG2, no. Gothenburg, Sweden; 20180820 - 20180824, (20180808), 3GPP DRAFT; R2-1811282 IMPACTS ON MAC FOR NR-U OPERATION, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/tsg%5Fran/WG2%5FRL2/TSGR2%5F103/Docs/R2%2D1811282%2Ezip, (20180808), XP051520946 [X] 1,12 * paragraph [0002] * [A] 2-8 [I] 9,11-15
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.