EP3852175 - METHOD FOR PRODUCING POSITIVE ELECTRODE ACTIVE MATERIAL FOR LITHIUM ION SECONDARY BATTERY [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 23.02.2024 Database last updated on 12.11.2024 | |
Former | The patent has been granted Status updated on 17.03.2023 | ||
Former | Grant of patent is intended Status updated on 30.11.2022 | ||
Former | Request for examination was made Status updated on 18.06.2021 | ||
Former | The international publication has been made Status updated on 21.03.2020 | Most recent event Tooltip | 12.07.2024 | Lapse of the patent in a contracting state New state(s): IE | published on 14.08.2024 [2024/33] | Applicant(s) | For all designated states Kao Corporation 14-10, Nihonbashi Kayabacho 1-chome Chuo-ku Tokyo 103-8210 / JP | [2023/21] |
Former [2021/29] | For all designated states Kao Corporation 14-10, Nihonbashi-Kayabacho 1-chome Chuo-ku Tokyo 103-8210 / JP | Inventor(s) | 01 /
AKAGI, Ryuichi c/o Kao Corporation Research Laboratories 1334, Minato Wakayama-shi, Wakayama 640-8580 / JP | 02 /
HIRAISHI, Atsushi c/o Kao Corporation Research Laboratories 1334, Minato Wakayama-shi, Wakayama 640-8580 / JP | [2021/29] | Representative(s) | Hoffmann Eitle Patent- und Rechtsanwälte PartmbB Arabellastraße 30 81925 München / DE | [2021/29] | Application number, filing date | 19859230.5 | 30.07.2019 | [2021/29] | WO2019JP29805 | Priority number, date | JP20180172816 | 14.09.2018 Original published format: JP 2018172816 | [2021/29] | Filing language | JA | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2020054236 | Date: | 19.03.2020 | Language: | JA | [2020/12] | Type: | A1 Application with search report | No.: | EP3852175 | Date: | 21.07.2021 | Language: | EN | [2021/29] | Type: | B1 Patent specification | No.: | EP3852175 | Date: | 19.04.2023 | Language: | EN | [2023/16] | Search report(s) | International search report - published on: | JP | 19.03.2020 | (Supplementary) European search report - dispatched on: | EP | 30.05.2022 | Classification | IPC: | H01M4/525, H01M4/505, C01G53/00 | [2022/26] | CPC: |
C01G53/006 (EP,KR);
C01G53/42 (EP,KR);
C01G53/50 (EP,KR);
H01M10/052 (KR);
H01M4/1391 (EP,KR);
H01M4/505 (KR);
H01M4/525 (EP,KR);
C01P2004/51 (EP);
C01P2004/61 (EP,KR);
|
Former IPC [2021/29] | H01M4/525, H01M4/505 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2021/29] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | VERFAHREN ZUR HERSTELLUNG VON POSITIVELEKTRODEN-AKTIVMATERIAL FÜR LITHIUM-IONEN-SEKUNDÄRBATTERIE | [2021/29] | English: | METHOD FOR PRODUCING POSITIVE ELECTRODE ACTIVE MATERIAL FOR LITHIUM ION SECONDARY BATTERY | [2021/29] | French: | PROCÉDÉ DE PRODUCTION DE MATÉRIAU ACTIF D'ÉLECTRODE POSITIVE POUR BATTERIE SECONDAIRE AU LITHIUM-ION | [2021/29] | Entry into regional phase | 09.03.2021 | Translation filed | 09.03.2021 | National basic fee paid | 09.03.2021 | Search fee paid | 09.03.2021 | Designation fee(s) paid | 09.03.2021 | Examination fee paid | Examination procedure | 09.03.2021 | Examination requested [2021/29] | 01.12.2022 | Communication of intention to grant the patent | 08.03.2023 | Fee for grant paid | 08.03.2023 | Fee for publishing/printing paid | 08.03.2023 | Receipt of the translation of the claim(s) | Opposition(s) | 22.01.2024 | No opposition filed within time limit [2024/13] | Fees paid | Renewal fee | 08.07.2021 | Renewal fee patent year 03 | 25.07.2022 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AL | 19.04.2023 | AT | 19.04.2023 | CZ | 19.04.2023 | DK | 19.04.2023 | EE | 19.04.2023 | ES | 19.04.2023 | FI | 19.04.2023 | HR | 19.04.2023 | IT | 19.04.2023 | LT | 19.04.2023 | LV | 19.04.2023 | MC | 19.04.2023 | NL | 19.04.2023 | PL | 19.04.2023 | RO | 19.04.2023 | RS | 19.04.2023 | SE | 19.04.2023 | SI | 19.04.2023 | SK | 19.04.2023 | SM | 19.04.2023 | NO | 19.07.2023 | GR | 20.07.2023 | GB | 30.07.2023 | IE | 30.07.2023 | LU | 30.07.2023 | CH | 31.07.2023 | FR | 31.07.2023 | IS | 19.08.2023 | PT | 21.08.2023 | [2024/33] |
Former [2024/26] | AL | 19.04.2023 | |
AT | 19.04.2023 | ||
CZ | 19.04.2023 | ||
DK | 19.04.2023 | ||
EE | 19.04.2023 | ||
ES | 19.04.2023 | ||
FI | 19.04.2023 | ||
HR | 19.04.2023 | ||
IT | 19.04.2023 | ||
LT | 19.04.2023 | ||
LV | 19.04.2023 | ||
MC | 19.04.2023 | ||
NL | 19.04.2023 | ||
PL | 19.04.2023 | ||
RO | 19.04.2023 | ||
RS | 19.04.2023 | ||
SE | 19.04.2023 | ||
SI | 19.04.2023 | ||
SK | 19.04.2023 | ||
SM | 19.04.2023 | ||
NO | 19.07.2023 | ||
GR | 20.07.2023 | ||
GB | 30.07.2023 | ||
LU | 30.07.2023 | ||
CH | 31.07.2023 | ||
FR | 31.07.2023 | ||
IS | 19.08.2023 | ||
PT | 21.08.2023 | ||
Former [2024/25] | AL | 19.04.2023 | |
AT | 19.04.2023 | ||
CZ | 19.04.2023 | ||
DK | 19.04.2023 | ||
EE | 19.04.2023 | ||
ES | 19.04.2023 | ||
FI | 19.04.2023 | ||
HR | 19.04.2023 | ||
LT | 19.04.2023 | ||
LV | 19.04.2023 | ||
MC | 19.04.2023 | ||
NL | 19.04.2023 | ||
PL | 19.04.2023 | ||
RO | 19.04.2023 | ||
RS | 19.04.2023 | ||
SE | 19.04.2023 | ||
SI | 19.04.2023 | ||
SK | 19.04.2023 | ||
SM | 19.04.2023 | ||
NO | 19.07.2023 | ||
GR | 20.07.2023 | ||
GB | 30.07.2023 | ||
LU | 30.07.2023 | ||
CH | 31.07.2023 | ||
FR | 31.07.2023 | ||
IS | 19.08.2023 | ||
PT | 21.08.2023 | ||
Former [2024/18] | AL | 19.04.2023 | |
AT | 19.04.2023 | ||
CZ | 19.04.2023 | ||
DK | 19.04.2023 | ||
EE | 19.04.2023 | ||
ES | 19.04.2023 | ||
FI | 19.04.2023 | ||
HR | 19.04.2023 | ||
LT | 19.04.2023 | ||
LV | 19.04.2023 | ||
MC | 19.04.2023 | ||
NL | 19.04.2023 | ||
PL | 19.04.2023 | ||
RO | 19.04.2023 | ||
RS | 19.04.2023 | ||
SE | 19.04.2023 | ||
SK | 19.04.2023 | ||
SM | 19.04.2023 | ||
NO | 19.07.2023 | ||
GR | 20.07.2023 | ||
LU | 30.07.2023 | ||
IS | 19.08.2023 | ||
PT | 21.08.2023 | ||
Former [2024/14] | AL | 19.04.2023 | |
AT | 19.04.2023 | ||
CZ | 19.04.2023 | ||
DK | 19.04.2023 | ||
EE | 19.04.2023 | ||
ES | 19.04.2023 | ||
FI | 19.04.2023 | ||
HR | 19.04.2023 | ||
LT | 19.04.2023 | ||
LV | 19.04.2023 | ||
MC | 19.04.2023 | ||
NL | 19.04.2023 | ||
PL | 19.04.2023 | ||
RO | 19.04.2023 | ||
RS | 19.04.2023 | ||
SE | 19.04.2023 | ||
SK | 19.04.2023 | ||
SM | 19.04.2023 | ||
NO | 19.07.2023 | ||
GR | 20.07.2023 | ||
IS | 19.08.2023 | ||
PT | 21.08.2023 | ||
Former [2024/10] | AL | 19.04.2023 | |
AT | 19.04.2023 | ||
CZ | 19.04.2023 | ||
DK | 19.04.2023 | ||
EE | 19.04.2023 | ||
ES | 19.04.2023 | ||
FI | 19.04.2023 | ||
HR | 19.04.2023 | ||
LT | 19.04.2023 | ||
LV | 19.04.2023 | ||
NL | 19.04.2023 | ||
PL | 19.04.2023 | ||
RO | 19.04.2023 | ||
RS | 19.04.2023 | ||
SE | 19.04.2023 | ||
SK | 19.04.2023 | ||
SM | 19.04.2023 | ||
NO | 19.07.2023 | ||
GR | 20.07.2023 | ||
IS | 19.08.2023 | ||
PT | 21.08.2023 | ||
Former [2024/08] | AL | 19.04.2023 | |
AT | 19.04.2023 | ||
ES | 19.04.2023 | ||
FI | 19.04.2023 | ||
HR | 19.04.2023 | ||
LT | 19.04.2023 | ||
LV | 19.04.2023 | ||
NL | 19.04.2023 | ||
PL | 19.04.2023 | ||
RS | 19.04.2023 | ||
SE | 19.04.2023 | ||
SK | 19.04.2023 | ||
SM | 19.04.2023 | ||
NO | 19.07.2023 | ||
GR | 20.07.2023 | ||
IS | 19.08.2023 | ||
PT | 21.08.2023 | ||
Former [2024/03] | AL | 19.04.2023 | |
AT | 19.04.2023 | ||
ES | 19.04.2023 | ||
FI | 19.04.2023 | ||
HR | 19.04.2023 | ||
LT | 19.04.2023 | ||
LV | 19.04.2023 | ||
NL | 19.04.2023 | ||
PL | 19.04.2023 | ||
RS | 19.04.2023 | ||
SE | 19.04.2023 | ||
NO | 19.07.2023 | ||
GR | 20.07.2023 | ||
IS | 19.08.2023 | ||
PT | 21.08.2023 | ||
Former [2024/01] | AL | 19.04.2023 | |
AT | 19.04.2023 | ||
ES | 19.04.2023 | ||
HR | 19.04.2023 | ||
LT | 19.04.2023 | ||
LV | 19.04.2023 | ||
NL | 19.04.2023 | ||
PL | 19.04.2023 | ||
RS | 19.04.2023 | ||
SE | 19.04.2023 | ||
NO | 19.07.2023 | ||
GR | 20.07.2023 | ||
IS | 19.08.2023 | ||
PT | 21.08.2023 | ||
Former [2023/51] | AL | 19.04.2023 | |
AT | 19.04.2023 | ||
ES | 19.04.2023 | ||
HR | 19.04.2023 | ||
NL | 19.04.2023 | ||
PL | 19.04.2023 | ||
RS | 19.04.2023 | ||
SE | 19.04.2023 | ||
NO | 19.07.2023 | ||
GR | 20.07.2023 | ||
IS | 19.08.2023 | ||
PT | 21.08.2023 | ||
Former [2023/50] | AL | 19.04.2023 | |
AT | 19.04.2023 | ||
ES | 19.04.2023 | ||
NL | 19.04.2023 | ||
PL | 19.04.2023 | ||
SE | 19.04.2023 | ||
NO | 19.07.2023 | ||
GR | 20.07.2023 | ||
IS | 19.08.2023 | ||
PT | 21.08.2023 | ||
Former [2023/48] | AT | 19.04.2023 | |
ES | 19.04.2023 | ||
NL | 19.04.2023 | ||
SE | 19.04.2023 | ||
NO | 19.07.2023 | ||
PT | 21.08.2023 | ||
Former [2023/46] | ES | 19.04.2023 | |
NL | 19.04.2023 | ||
PT | 21.08.2023 | ||
Former [2023/43] | NL | 19.04.2023 | Documents cited: | Search | [AD]JP2011219328 (TOYOTA MOTOR CORP, et al) | International search | [A]WO2009099158 (AGC SEIMI CHEMICAL CO LTD [JP], et al); | [A]JP2015147689 (ASAHI GLASS CO LTD); | [A]JP2017527511 | by applicant | JP2011219328 |